Patents by Inventor Haruka HIROSE

Haruka HIROSE has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11929612
    Abstract: A first switching unit switches a first power grid from an isolated operation to a grid-connected operation. In switching the first power grid from the isolated operation to the grid-connected operation, the first switching unit determines a master and a slave among a plurality of power adjustment resources and allows the first power grid to be connected to the second power grid after master-slave control by means of the master and the slave such that electric power of the first power grid is in synchronization with electric power of the second power grid. The first switching unit preferentially selects as the master, a power adjustment resource close to a point of connection between the first power grid and the second power grid from among the plurality of power adjustment resources.
    Type: Grant
    Filed: November 5, 2021
    Date of Patent: March 12, 2024
    Assignee: Toyota Jidosha Kabushiki Kaisha
    Inventors: Shigetaka Hamada, Haruka Hirose, Yusuke Horii, Toru Nakamura, Takaaki Sano
  • Patent number: 11912154
    Abstract: A power management system includes a plurality of power adjustment resources electrically connected to a microgrid. The plurality of power adjustment resources include a plurality of EVSEs, each of EVSEs including a parking space. When any one of a plurality of power feeding vehicles is parked in the parking space, an EVSE enables power feeding from a vehicle parked in the parking space to the microgrid. A CEMS server manages the parking space. When a balance of power supply and demand in the microgrid is in an overdemand state, the CEMS server allocates the parking space to a power feeding vehicle that responds to a request for power feeding to the microgrid, of the plurality of power feeding vehicles.
    Type: Grant
    Filed: November 17, 2021
    Date of Patent: February 27, 2024
    Assignee: Toyota Jidosha Kabushiki Kaisha
    Inventors: Shigetaka Hamada, Haruka Hirose, Yusuke Horii, Toru Nakamura, Takaaki Sano
  • Patent number: 11870116
    Abstract: A power management system includes a plurality of power adjustment resources electrically connected to a microgrid, and a CEMS server that manages the plurality of power adjustment resources. The plurality of power adjustment resources include a plurality of FCEVs that supply electric power to the microgrid. Each of the plurality of FCEVs executes a refresh process that removes an oxide film formed on a catalyst electrode of an FC stack by causing the FC stack to generate electric power exceeding prescribed electric power. The CEMS server adjusts execution timings of the refresh process in the plurality of FCEVs during power supply to the microgrid, so as to respond to a request to adjust power supply and demand in the microgrid.
    Type: Grant
    Filed: November 9, 2021
    Date of Patent: January 9, 2024
    Assignee: Toyota Jidosha Kabushiki Kaisha
    Inventors: Shigetaka Hamada, Haruka Hirose, Yusuke Horii, Toru Nakamura, Takaaki Sano
  • Patent number: 11710983
    Abstract: In switching of a microgrid from an isolated operation to an interconnected operation with a power grid, a CEMS server determines a first master DER and slaves based on a master plan and performs master-slave control. When the first master DER goes down, the CEMS server compares remaining capacities of power-storage-type DERs included in a DER group. The CEMS server then determines a DER with the highest remaining capacity as a second master DER among the power-storage-type DERs included in the DER group and performs master-slave control.
    Type: Grant
    Filed: November 15, 2021
    Date of Patent: July 25, 2023
    Assignee: Toyota Jidosha Kabushiki Kaisha
    Inventors: Shigetaka Hamada, Haruka Hirose, Yusuke Horii, Toru Nakamura, Takaaki Sano
  • Publication number: 20220242263
    Abstract: An ECU performs a process including the steps of: obtaining present charging/discharging power P during a V2H operation; adding a time counter T when an absolute value of the charging/discharging power P is smaller than a threshold P1; notifying inquiry information when the time counter T has reached T1, the present time is a time at which sunshine is not expected and is within a time period of late-night electric power, and a power storage device is fully charged; and stopping the V2H operation when stop of the V2H operation is allowed.
    Type: Application
    Filed: January 11, 2022
    Publication date: August 4, 2022
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventor: Haruka HIROSE
  • Publication number: 20220239108
    Abstract: A power management system includes a CEMS server that outputs a DR request to a plurality of power adjustment resources such that balancing is achieved every prescribed time period. The plurality of power adjustment resources include: a power-storage-type DER that stores the supply power in an energy form of at least one of electricity, heat and gas fuel; and a consumption-type DER that consumes the supply power by at least one of air conditioning and lighting. In a case where it is expected in the middle of the prescribed time period that the actual amount of power exceeds the planned amount of power at the end of the prescribed time period, the CEMS server outputs, to the power-storage-type DER more preferentially than to the consumption-type DER, the DR request for decreasing the actual amount of power in comparison with before expectation.
    Type: Application
    Filed: January 10, 2022
    Publication date: July 28, 2022
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Shigetaka HAMADA, Haruka HIROSE, Yusuke HORII, Toru NAKAMURA, Takaaki SANO
  • Publication number: 20220200285
    Abstract: When electric power supply from a power grid to a microgrid is interrupted and the microgrid performs an isolated operation, a CEMS server reads various types of information (priority setting information, information on operating ratios of first power adjustment resources during a prescribed period, meteorological information, and resource information) from a storage, and creates an operation plan during the prescribed period using such information. The priority setting information includes a priority A being a priority that does not allow a stop of electric power supply. The CEMS server performs the isolated operation of the microgrid based on the operation plan.
    Type: Application
    Filed: November 17, 2021
    Publication date: June 23, 2022
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Shigetaka HAMADA, Haruka HIROSE, Yusuke HORII, Toru NAKAMURA, Takaaki SANO
  • Publication number: 20220200020
    Abstract: A power management system includes a plurality of power adjustment resources electrically connected to a microgrid, and a CEMS server that manages the plurality of power adjustment resources. The plurality of power adjustment resources include a plurality of FCEVs that supply electric power to the microgrid. Each of the plurality of FCEVs executes a refresh process that removes an oxide film formed on a catalyst electrode of an FC stack by causing the FC stack to generate electric power exceeding prescribed electric power. The CEMS server adjusts execution timings of the refresh process in the plurality of FCEVs during power supply to the microgrid, so as to respond to a request to adjust power supply and demand in the microgrid.
    Type: Application
    Filed: November 9, 2021
    Publication date: June 23, 2022
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Shigetaka HAMADA, Haruka HIROSE, Yusuke HORII, Toru NAKAMURA, Takaaki SANO
  • Publication number: 20220200336
    Abstract: In switching of a microgrid from an isolated operation to an interconnected operation with a power grid, a CEMS server determines a first master DER and slaves based on a master plan and performs master-slave control. When the first master DER goes down, the CEMS server compares remaining capacities of power-storage-type DERs included in a DER group. The CEMS server then determines a DER with the highest remaining capacity as a second master DER among the power-storage-type DERs included in the DER group and performs master-slave control.
    Type: Application
    Filed: November 15, 2021
    Publication date: June 23, 2022
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Shigetaka HAMADA, Haruka HIROSE, Yusuke HORII, Toru NAKAMURA, Takaaki SANO
  • Publication number: 20220194257
    Abstract: A power management system includes a plurality of power adjustment resources electrically connected to a microgrid. The plurality of power adjustment resources include a plurality of EVSEs, each of EVSEs including a parking space. When any one of a plurality of power feeding vehicles is parked in the parking space, an EVSE enables power feeding from a vehicle parked in the parking space to the microgrid. A CEMS server manages the parking space. When a balance of power supply and demand in the microgrid is in an overdemand state, the CEMS server allocates the parking space to a power feeding vehicle that responds to a request for power feeding to the microgrid, of the plurality of power feeding vehicles.
    Type: Application
    Filed: November 17, 2021
    Publication date: June 23, 2022
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Shigetaka HAMADA, Haruka HIROSE, Yusuke HORII, Toru NAKAMURA, Takaaki SANO
  • Publication number: 20220194251
    Abstract: A server that manages a plurality of power adjustment resources electrically connectable to a power network includes a determination unit and a first permission unit. The determination unit determines, before a vehicle including a power storage starts charging of the power storage by using the power network, whether or not electric power corresponding to charging power can be supplied to the power network by having at least one of the power adjustment resources respond to the charging of the power storage. When the determination unit determines that electric power can be supplied, the first permission unit permits supply of electric power from the power network to the vehicle.
    Type: Application
    Filed: November 5, 2021
    Publication date: June 23, 2022
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Shigetaka HAMADA, Haruka HIROSE, Yusuke HORII, Toru NAKAMURA, Takaaki SANO
  • Publication number: 20220194250
    Abstract: Before start of vehicle charging by using a power network, a first determination unit determines whether reserve of the power network is not less than a first reference value. When reserve of the power network is not less than the first reference value, a first permission unit permits supply of electric power from the power network to a vehicle. When reserve of the power network is smaller than the first reference value, a second determination unit determines whether or not electric power corresponding to charging power can be supplied to the power network by having at least one of power adjustment resources respond to vehicle charging. When the second determination unit determines that electric power can be supplied, a second permission unit permits supply of electric power from the power network to the vehicle.
    Type: Application
    Filed: October 22, 2021
    Publication date: June 23, 2022
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Shigetaka HAMADA, Haruka HIROSE, Yusuke HORII, Toru NAKAMURA, Takaaki SANO
  • Publication number: 20220200335
    Abstract: A first switching unit switches a first power grid from an isolated operation to a grid-connected operation. In switching the first power grid from the isolated operation to the grid-connected operation, the first switching unit determines a master and a slave among a plurality of power adjustment resources and allows the first power grid to be connected to the second power grid after master-slave control by means of the master and the slave such that electric power of the first power grid is in synchronization with electric power of the second power grid. The first switching unit preferentially selects as the master, a power adjustment resource close to a point of connection between the first power grid and the second power grid from among the plurality of power adjustment resources.
    Type: Application
    Filed: November 5, 2021
    Publication date: June 23, 2022
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Shigetaka HAMADA, Haruka HIROSE, Yusuke HORII, Toru NAKAMURA, Takaaki SANO
  • Publication number: 20220200021
    Abstract: A power management system includes power adjustment resources (including FCEVs) electrically connected to a microgrid, and a CEMS server that manages the power adjustment resources. Each of FCEVs includes: a supply valve that adjusts an amount of hydrogen supplied to an FC stack; a compressor that adjusts an amount of oxygen supplied to the FC stack; and an ECU. The ECU executes decrease control that temporarily decreases at least one of the amount of hydrogen supplied to the FC stack and the amount of oxygen supplied to the FC stack. The CEMS server determines execution timings of the decrease control in FCEVs during power supply to the microgrid.
    Type: Application
    Filed: November 17, 2021
    Publication date: June 23, 2022
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventors: Shigetaka HAMADA, Haruka HIROSE, Yusuke HORII, Toru NAKAMURA, Takaaki SANO
  • Publication number: 20190165439
    Abstract: A fuel cell system includes a control unit configured to control for switching a secondary battery step-up converter between a step-up operation mode and a step-up stop mode. The control unit is configured to obtain a correlation value that correlates with a dischargeable electric power of a secondary battery, prohibit the step-up stop mode when a required voltage of a load is lower than an output voltage of the secondary battery and the correlation value falls within a prohibition range in which the step-up stop mode is prohibited, and execute the step-up stop mode when the required voltage is lower than the output voltage of the secondary battery and the correlation value falls outside the prohibition range.
    Type: Application
    Filed: October 11, 2018
    Publication date: May 30, 2019
    Applicant: TOYOTA JIDOSHA KABUSHIKI KAISHA
    Inventor: Haruka HIROSE