Patents by Inventor Hengze YANG

Hengze YANG has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 10787906
    Abstract: Provided is a method of forming a roadway by filling gangue paste during wide roadway excavation of a thick coal seam belonging to the technical field of mining industry. The method comprises: firstly designing a width of a filing strip and a width of a new excavation roadway according to a geological condition of a coal seam; secondly, determining a length of each filling, i.e.
    Type: Grant
    Filed: May 11, 2018
    Date of Patent: September 29, 2020
    Assignee: SHANDONG UNIVERSITY OF SCIENCE AND TECHNOLOGY
    Inventors: Zhongping Guo, Weizhen Liu, Yong Jian, Huiqiang Duan, Hengze Yang, Wenwu Xie
  • Publication number: 20200040728
    Abstract: Provided is a method of forming a roadway by filling gangue paste during wide roadway excavation of a thick coal seam belonging to the technical field of mining industry. The method comprises: firstly designing a width of a filing strip and a width of a new excavation roadway according to a geological condition of a coal seam; secondly, determining a length of each filling, i.e.
    Type: Application
    Filed: May 11, 2018
    Publication date: February 6, 2020
    Inventors: Zhongping GUO, Weizhen LIU, Yong JIAN, Huiqiang DUAN, Hengze YANG, Wenwu XIE
  • Publication number: 20200024944
    Abstract: Provided is a method of mining a single steeply-inclined thick coal seam, which belongs to the mining engineering field. The mining method includes: carrying out one transport crossheading along a floor of the coal seam to constitute a production system together with rises on both sides of a district; arranging a top-coal caving hydraulic support along a thickness of the coal seam in the transport crossheading, with a cyclic advance interval being 1.0 m; maintaining one section of return air channel close to a side of a roof that is in a gob and behind the hydraulic support. In a case of mining, caved coals fall on a scraper conveyer and transported through a belt conveyer. Fresh air flow required for a working surface enters the transport crossheading through a district transport crosscut and a track rise, and then enters the return air rise through the return air channel after washing the working surface. A unique return air channel is adopted.
    Type: Application
    Filed: May 11, 2018
    Publication date: January 23, 2020
    Inventors: Zhongping GUO, Wenwu XIE, Haiyan FAN, Huiqiang DUAN, Hengze YANG, Yong JIAN