Patents by Inventor Heribert Werthes

Heribert Werthes has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 8624414
    Abstract: A method for controlling a steam power plant is provided. The method includes the steps of providing a first signal showing a reduction of the current power level of the generator, generating a second signal showing a short circuit interruption as a function of the first signal, resetting the second signal after a predetermined time period and blocking the second signal for a predetermined period of time, stopping and subsequently starting the turbine as a function of the second signal, generating a third signal showing a load rejection as a function of the first signal, and permanently stopping the turbine as a function of the third signal. A device for controlling a steam power plant is also provided.
    Type: Grant
    Filed: August 17, 2009
    Date of Patent: January 7, 2014
    Assignee: Siemens Aktiengesellschaft
    Inventors: Martin Bennauer, Heribert Werthes
  • Patent number: 8137240
    Abstract: A method for engaging a drive shaft of a turbo engine with an output shaft by means of a clutch is provided. The turbo engine is run up to a rotational speed that is subsynchronous to the speed of the output shaft and is maintained at the steady speed before a signal is set or before starting the engagement process.
    Type: Grant
    Filed: September 28, 2007
    Date of Patent: March 20, 2012
    Assignee: Siemens Aktiengesellschaft
    Inventors: Matthias Humer, Heribert Werthes
  • Publication number: 20110156408
    Abstract: A method for controlling a steam power plant is provided. The method includes the steps of providing a first signal showing a reduction of the current power level of the generator, generating a second signal showing a short circuit interruption as a function of the first signal, resetting the second signal after a predetermined time period and blocking the second signal for a predetermined period of time, stopping and subsequently starting the turbine as a function of the second signal, generating a third signal showing a load rejection as a function of the first signal, and permanently stopping the turbine as a function of the third signal. A device for controlling a steam power plant is also provided.
    Type: Application
    Filed: August 17, 2009
    Publication date: June 30, 2011
    Inventors: Martin Bennauer, Heribert Werthes
  • Publication number: 20090325765
    Abstract: A method for engaging a drive shaft of a turbo engine with an output shaft by means of a clutch is provided. The turbo engine is run up to a rotational speed that is subsynchronous to the speed of the output shaft and is maintained at the steady speed before a signal is set or before starting the engagement process.
    Type: Application
    Filed: September 28, 2007
    Publication date: December 31, 2009
    Inventors: Matthias Humer, Heribert Werthes
  • Publication number: 20040101396
    Abstract: The invention relates to a method for regulating a steam turbine (1), according to which steam is fed to the steam turbine (1) via at least three valves, whereby one of the valves is regulated as a regulating valve (9, 11), and at least two valves are controlled as control valves (13, 15).
    Type: Application
    Filed: June 19, 2003
    Publication date: May 27, 2004
    Inventors: Heinrich Oeynhausen, Richard Steinborn, Heribert Werthes