Patents by Inventor Hu Qi

Hu Qi has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11293183
    Abstract: The joint has a prefabricated-reinforced-concrete column, a reinforced-concrete foundation, a column anchoring longitudinal bar, a grouting sleeve and a foundation anchoring steel bar. The foundation anchoring steel bar and the column anchoring longitudinal bar are connected by a seam filling material filling the grouting sleeve. A splicing seam between the reinforced-concrete foundation and the prefabricated-reinforced-concrete column is filled with the seam filling material. The foundation anchoring steel bar includes a vertical portion and a horizontal portion. The vertical portion includes an upper-portion anchoring section protruding out of an upper surface of the reinforced-concrete foundation, a middle-portion non-adhesive section buried within the foundation and a lower-portion anchoring section. An exterior of the middle-portion non-adhesive section is provided with an isolating sheath for isolating the middle-portion non-adhesive section and the concrete adhesion.
    Type: Grant
    Filed: December 2, 2019
    Date of Patent: April 5, 2022
    Inventors: Haishan Guo, Hu Qi, Kang Liu, Liming Li, Xin Fan, Lida Tian, Jiao Geng, Dongyan Wang
  • Publication number: 20210234672
    Abstract: The present disclosure discloses a method and system for tracing a full-life-cycle quality of a prefabricated part based on a blockchain, wherein the method includes: step S1: establishing a prefabricated-part-quality tracing standard in which tracing information is able to be intercommunicated; step S2: gathering and storing tracing information of quality events of the prefabricated part at nodes during a full life cycle; step S3: performing blockchain distributed bookkeeping to the tracing information of the quality events of the prefabricated part at the nodes during the full life cycle; and step S4: realizing quality tracing of the prefabricated part at the nodes during the full life cycle based on a uniform tracing interface and a safe access policy. The present disclosure can effectively solve the problems in the standard, efficiency, reliance, safety and supervision of the quality tracing of prefabricated parts in the industrialization of novel constructions.
    Type: Application
    Filed: April 16, 2019
    Publication date: July 29, 2021
    Inventors: TAO ZENG, HAISHAN GUO, KANG LIU, YUZHONG CAO, XIAOJIE YANG, HU QI, LIMING LI
  • Publication number: 20210190347
    Abstract: A humidifier includes a base, a water tank, a water vaporizing mechanism, and a water control arrangement. The water control arrangement includes a first water level sensing device provided on the water tank and arranged to detect a water level in the water storage cavity, a second water level sensing device provided on the base and arranged to detect a water level in the water accommodating compartment, and a central processing unit. The central processing unit is electrically connected to the first water level sensing device, the second water level sensing device and the water vaporizing mechanism, in such a manner that when the water level in the water storage cavity falls below a predetermined threshold as detected by first water level sensing device, the central processing unit is configured to send a signal to a terminal device for reminding water refill.
    Type: Application
    Filed: December 10, 2020
    Publication date: June 24, 2021
    Inventor: Hu QI
  • Patent number: 11028574
    Abstract: The column-base joint includes a prefabricated-reinforced-concrete column and a reinforced-concrete foundation, and further includes a coating-steel-plate sleeve that is integrally prefabricated with the concrete column and encloses an exterior of a column base. A gap is between a bottom end of the coating-steel-plate sleeve and an upper surface of the foundation. An outside of the gap is provided with a plugging material. The joint further includes an annular rib plate all of whose edges are horizontally and seamlessly connected to an inner wall of the coating-steel-plate sleeve and whose middle portion is provided with a rib-plate opening. The annular rib plate is provided with a sleeve opening that matches with the grouting sleeve device.
    Type: Grant
    Filed: December 2, 2019
    Date of Patent: June 8, 2021
    Inventors: Haishan Guo, Liming Li, Hu Qi, Xin Fan, Dongyan Wang, Jiao Geng, Lida Tian, Kang Liu, Ming Li, Tong Li, Yonglan Xie
  • Publication number: 20210103873
    Abstract: The present disclosure discloses a method and system for tracing a quality of sleeve grouting based on a blockchain and a gathering terminal, wherein the method includes: step S1: establishing a unified standard of quality tracing and a standard of a method of gathering data; step S2: by using a gathering terminal, based on a grouting event, gathering in batch relevant tracing information, and forming the data fingerprint of the event, to ensure the integrity and non-repudiation of the on-chain data; step S3: performing blockchain distributed bookkeeping to the tracing information of sleeve grouting and a result of casual inspection; and step S4: realizing quality tracing of sleeve grouting based on a unified tracing interface and a safe access policy. The present disclosure can effectively solve one of the bottlenecks that restrict the scale development of the industry in the industrialization of novel constructions.
    Type: Application
    Filed: July 9, 2018
    Publication date: April 8, 2021
    Inventors: TAO ZENG, HAISHAN GUO, KANG LIU, YUZHONG CAO, HU QI, LIMING LI
  • Patent number: 10865557
    Abstract: The present disclosure relates to the technical field of assembled concrete frame structures, and discloses a prestressed assembled concrete frame-joint connecting structure and constructing method thereof. The present disclosure includes a prefabricated concrete column, a prefabricated concrete superposed beam, a composite slab, a post-tensioned prestressing tendon that connects the prefabricated concrete column and the prefabricated concrete superposed beam, a bending-resistant energy consuming steel bar and a shearing-resistant high-strength steel bar.
    Type: Grant
    Filed: December 22, 2019
    Date of Patent: December 15, 2020
    Inventors: Haishan Guo, Hu Qi, Kang Liu, Dongyan Wang, Liming Li, Lida Tian, Jiao Geng, Ming Li, Haitao Zhang, Tong Li, Xiaojie Yang, Xin Fan, Xueying Hou, Tao Zeng, Lihong Jiang
  • Publication number: 20200141110
    Abstract: The present disclosure relates to the technical field of assembled concrete frame structures, and discloses a prestressed assembled concrete frame-joint connecting structure and constructing method thereof. The present disclosure includes a prefabricated concrete column, a prefabricated concrete superposed beam, a composite slab, a post-tensioned prestressing tendon that connects the prefabricated concrete column and the prefabricated concrete superposed beam, a bending-resistant energy consuming steel bar and a shearing-resistant high-strength steel bar.
    Type: Application
    Filed: December 22, 2019
    Publication date: May 7, 2020
    Inventors: Haishan Guo, Hu Qi, Kang Liu, Dongyan WANG, Liming LI, Lida Tian, Jiao Geng, Ming LI, Haitao ZHANG, Tong LI, Xiaojie YANG, Xin FAN, Xueying HOU, Tao ZENG, Lihong JIANG
  • Publication number: 20200109550
    Abstract: The column-base joint includes a prefabricated-reinforced-concrete column and a reinforced-concrete foundation, and further includes a coating-steel-plate sleeve that is integrally prefabricated with the concrete column and encloses an exterior of a column base. A gap is between a bottom end of the coating-steel-plate sleeve and an upper surface of the foundation. An outside of the gap is provided with a plugging material. The joint further includes an annular rib plate all of whose edges are horizontally and seamlessly connected to an inner wall of the coating-steel-plate sleeve and whose middle portion is provided with a rib-plate opening. The annular rib plate is provided with a sleeve opening that matches with the grouting sleeve device.
    Type: Application
    Filed: December 2, 2019
    Publication date: April 9, 2020
    Inventors: Haishan Guo, Liming Li, Hu Qi, Xin Fan, Dongyan Wang, Jiao Geng, Lida Tian, Kang Liu, Ming Li, Tong Li, Yonglan Xie
  • Publication number: 20200102751
    Abstract: The joint has a prefabricated-reinforced-concrete column, a reinforced-concrete foundation, a column anchoring longitudinal bar, a grouting sleeve and a foundation anchoring steel bar. The foundation anchoring steel bar and the column anchoring longitudinal bar are connected by a seam filling material filling the grouting sleeve. A splicing seam between the reinforced-concrete foundation and the prefabricated-reinforced-concrete column is filled with the seam filling material. The foundation anchoring steel bar includes a vertical portion and a horizontal portion. The vertical portion includes an upper-portion anchoring section protruding out of an upper surface of the reinforced-concrete foundation, a middle-portion non-adhesive section buried within the foundation and a lower-portion anchoring section. An exterior of the middle-portion non-adhesive section is provided with an isolating sheath for isolating the middle-portion non-adhesive section and the concrete adhesion.
    Type: Application
    Filed: December 2, 2019
    Publication date: April 2, 2020
    Inventors: Haishan Guo, Hu Qi, Kang Liu, Liming Li, Xin Fan, Lida Tian, Jiao Geng, Dongyan Wang