Patents by Inventor Hyung Na

Hyung Na has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Publication number: 20250062516
    Abstract: Example embodiments include a battery insulation sheet having a structure in which a first substrate, an aerogel layer, and a second substrate are laminated, wherein opposite surfaces of the aerogel layer is in contact with the first substrate or the second substrate adjacent thereto. Example embodiments also include a method of manufacturing a battery insulation sheet, and a battery module including the battery insulation sheet.
    Type: Application
    Filed: May 28, 2024
    Publication date: February 20, 2025
    Applicants: SAMSUNG SDI CO., LTD., DAEHYUP TECH CO., LTD.
    Inventors: Myung Heui WOO, Ha Na RA, Hye Jin PARK, Seung Yong YANG, Jae Hyun LEE, Bo Kyung RYU, Sang Hoon KIM, Jong Pil HWANG, Hyung Sek CHOI, Ho Joon KIM
  • Patent number: 12230449
    Abstract: A multilayer electronic component includes a body including a dielectric layer and a first internal electrode and a second internal electrode having first to sixth surfaces, a first external electrode including a first connection portion on the third surface, a first band portion on a portion of the first surface, and a third band portion on a portion of the second surface, a second external electrode including a second connection portion on the fourth surface, a second band portion on a portion of the first surface, and a fourth band portion on a portion of the second surface, an insulating layer disposed on the first and second connection portions and covering the second surface and the third and fourth band portions, a first plating layer disposed on the first band portion, and a second plating layer disposed on the second band portion. The insulating layer includes an oxide containing Ba.
    Type: Grant
    Filed: August 24, 2022
    Date of Patent: February 18, 2025
    Assignee: SAMSUNG ELECTRO-MECHANICS CO., LTD.
    Inventors: Sung Soo Kim, Jae Young Na, Jin Hyung Lim, Seung Hun Han, Ji Hong Jo
  • Publication number: 20240295240
    Abstract: The present invention relates to an airfoil bearing installation structure in which a spacer is provided on a bent portion of a foil assembly, the spacer has catching pieces having elasticity, and catching projections are formed on an inner wall surface of a slot formed in a housing so that the catching pieces are caught by the catching projections. Therefore, it is possible to prevent an axial movement and separation of the foil assembly without additionally installing a separate component for blocking an inlet of the slot.
    Type: Application
    Filed: June 27, 2022
    Publication date: September 5, 2024
    Inventor: Ju Hyung NA
  • Patent number: 10357844
    Abstract: A method of monitoring in real time pressure resistance welding of a cladding tube and an end plug. The method includes: a first step of detecting welding information including voltage, current, and welding force in a process of pressure resistance welding of a cladding tube and an end plug; a second step of comparing static factors obtained by calculating effective values for the welding information with predetermined reference values, respectively; a third step of calculating dynamic factors for the welding information including the gradient of instantaneous welding force, when the reference values are satisfied in the second step; and a fourth step of determining whether there is defect or not in welding quality by comparing the dynamic factors.
    Type: Grant
    Filed: October 20, 2016
    Date of Patent: July 23, 2019
    Assignees: KEPCO NUCLEAR FUEL CO., LTD., MONITECH CO., LTD.
    Inventors: Tae Hyung Na, Dong Soo Hwang, Mi Hye Ko, Kyung Woo Choi
  • Patent number: 10304578
    Abstract: A fuel pellet visual inspection device for manufacturing a nuclear fuel rod improves convenience and workability of visual inspection of a plurality of pellets by simultaneously turning over the pellet. The fuel pellet visual inspection device for manufacturing a nuclear fuel rod includes: a rotary shaft; a pair of seats hinged to the hinge shaft, arranged at both sides from the rotary shaft, and seated with a tray thereon; and a dust-collecting unit disposed under the pair of seats and collecting dust scattered from pellets.
    Type: Grant
    Filed: September 29, 2016
    Date of Patent: May 28, 2019
    Assignee: KEPCO NUCLEAR FUEL CO., LTD.
    Inventors: Tae Hyung Na, Hankyul Koh
  • Patent number: 9793020
    Abstract: Disclosed is an automatic welding apparatus for an end plug of a nuclear fuel rod, which is used to perform resistance welding on a cladding tube and the end plug in a welding chamber. The automatic welding apparatus includes a welding chamber configured to perform resistance welding on an end plug and a cladding tube, a cladding tube transfer unit that has a cladding tube clamp fixedly clamping the cladding tube and a first servo motor for driving the cladding tube clamp in a horizontal direction and that horizontally transfers the cladding tube to the welding chamber, end plug welding electrodes gripping the end plug fed from an end plug feeder, an end plug transfer driver for driving the end plug welding electrodes toward the welding chamber in a forward/backward direction, and a position control module for controlling driving of the first servo motor and the end plug transfer driver.
    Type: Grant
    Filed: April 17, 2013
    Date of Patent: October 17, 2017
    Assignee: KEPCO NUCLEAR FUEL CO., LTD.
    Inventors: Young Choon Cho, Chang Hwan Hwang, Hung Soon Chang, Sang Pil Kong, Tae Hyung Na, Young Seok Yoon
  • Publication number: 20170294243
    Abstract: A fuel pellet visual inspection device for manufacturing a nuclear fuel rod improves convenience and workability of visual inspection of a plurality of pellets by simultaneously turning over the pellet. The fuel pellet visual inspection device for manufacturing a nuclear fuel rod includes: a rotary shaft; a pair of seats hinged to the hinge shaft, arranged at both sides from the rotary shaft, and seated with a tray thereon; and a dust-collecting unit disposed under the pair of seats and collecting dust scattered from pellets.
    Type: Application
    Filed: September 29, 2016
    Publication date: October 12, 2017
    Applicant: KEPCO NUCLEAR FUEL CO., LTD.
    Inventors: Tae Hyung NA, Hankyul KOH
  • Publication number: 20170291249
    Abstract: A method of monitoring in real time pressure resistance welding of a cladding tube and an end plug. The method includes: a first step of detecting welding information including voltage, current, and welding force in a process of pressure resistance welding of a cladding tube and an end plug; a second step of comparing static factors obtained by calculating effective values for the welding information with predetermined reference values, respectively; a third step of calculating dynamic factors for the welding information including the gradient of instantaneous welding force, when the reference values are satisfied in the second step; and a fourth step of determining whether there is defect or not in welding quality by comparing the dynamic factors.
    Type: Application
    Filed: October 20, 2016
    Publication date: October 12, 2017
    Applicants: KEPCO NUCLEAR FUEL CO., LTD., MONITECH CO., LTD.
    Inventors: Tae Hyung NA, Dong Soo HWANG, Mi Hye KO, Kyung Woo CHOI
  • Patent number: 9697918
    Abstract: A method for loading fuel pellets for manufacturing a nuclear fuel rod is provided. The method includes arranging fuel pellets in a row on a tray, aligning the fuel pellets in the row on the tray such that the fuel pellets are closely in contact with one another, obtaining a total length of the pellets in the row by measuring the fuel pellets in the row on the tray, and comparing the total length with a predetermined length. When the total length is smaller than the predetermined length by a difference greater than an average unit length of the pellet, one or more fuel pellets are added in the row until to increase the total length until the difference becomes smaller than the average unit length of the fuel pellet.
    Type: Grant
    Filed: May 4, 2016
    Date of Patent: July 4, 2017
    Assignee: KEPCO NUCLEAR FUEL CO., LTD.
    Inventors: Se Yong Shin, Chang Hwan Hwang, Hung Soon Chang, Tae Hyung Na, Bong Sik Moon, Young Seok Yoon
  • Patent number: 9646728
    Abstract: Disclosed is a plasma welding apparatus for a guide thimble and guide thimble end plug of a nuclear fuel assembly, which includes: a welding chamber (100) includes an end-plug inserting part (110) into which the end plug (10) is inserted, a guide-thimble inserting part (120) which is provided on the same axis as the end-plug inserting part (110) and into which the guide thimble (20) is inserted and fixed, a torch assembling part (130) to which a plasma welding torch (131) is assembled so as to make a right angle with the end-plug inserting part (110) and the guide-thimble inserting part (120), and argon inflow and outflow ports (141, 142) through which argon is supplied or discharged; an end-plug transfer unit (210) supplying the end plug (10) to the end-plug inserting part (110); and an guide-thimble transfer unit (220) transferring the guide thimble (20) to the guide-thimble inserting part (120).
    Type: Grant
    Filed: January 7, 2014
    Date of Patent: May 9, 2017
    Assignee: KEPCO NUCLEAR FUEL CO., LTD.
    Inventors: Ju Young Lee, Chang Hwan Hwang, Hung Soon Chang, Soon Ki Guk, Tae Hyung Na, Yeong Seon Oh
  • Publication number: 20160307654
    Abstract: A method for loading fuel pellets for manufacturing a nuclear fuel rod comprises arranging fuel pellets in a row on a plurality of trays, measuring a whole length of the fuel pellets in the row on each of the plurality of trays and obtaining a total length of the pellets by accumulating the whole length of the fuel pellets one after another for the plurality of trays, comparing the total length with a predetermined length, and increasing or decreasing one or more fuel pellets in the row of a last tray of the plurality of the trays such that the total length of the pellets is less than the predetermined length and a length difference between the total length of the pellets and the predetermined length is within a length of one fuel pellet.
    Type: Application
    Filed: May 4, 2016
    Publication date: October 20, 2016
    Applicant: KEPCO NUCLEAR FUEL CO., LTD.
    Inventors: Se Yong SHIN, Chang Hwan HWANG, Hung Soon CHANG, Tae Hyung NA, Bong Sik MOON, Young Seok YOON
  • Patent number: 9437334
    Abstract: An apparatus for automatically loading a fuel pellet for manufacturing a nuclear fuel rod is provided. The apparatus includes a tray transfer unit that horizontally transfers the tray, a fuel pellet alignment unit that aligns fuel pellets arranged in the tray, a measurement unit that measures an entire length of the fuel pellets arranged in a row on the tray, a controller that compares an accumulated measured length with a set length, a waiting table located adjacent to the tray transfer unit to store a redundancy fuel pellet, and a fuel pellet movement unit that is driven by the controller and moves the fuel pellets between the tray and the waiting table.
    Type: Grant
    Filed: January 3, 2013
    Date of Patent: September 6, 2016
    Assignee: KEPCO NUCLEAR FUEL CO., LTD.
    Inventors: Se Yong Shin, Chang Hwan Hwang, Hung Soon Chang, Tae Hyung Na, Bong Sik Moon, Young Seok Yoon
  • Patent number: 9412475
    Abstract: Disclosed is a fuel rod testing apparatus for a nuclear fuel assembly. The fuel rod testing apparatus includes a helium leakage testing chamber having a gate so that a fuel rod is horizontally loaded/unloaded and testing whether or not helium leaks from the fuel rod, a fuel rod upward/downward transfer unit that has first and second transfer sections located in front of the gate and horizontally installed apart from each other in order to guide the fuel rod loaded into or unloaded from the helium leakage testing chamber, and that vertically drives the first and second transfer sections, and a main frame that has a upper transfer section disposed in parallel in a lengthwise direction of the fuel rod upward/downward transfer unit and having an inclined face and a lower transfer section installed at a lower portion of the upper transfer section and having an inclined face.
    Type: Grant
    Filed: January 8, 2014
    Date of Patent: August 9, 2016
    Assignee: KEPCO NUCLEAR FUEL CO., LTD.
    Inventors: Ju Young Lee, Chang Hwan Hwang, Hung Soon Chang, Soon Ki Guk, Tae Hyung Na, Ui Jea Lee
  • Patent number: 9016553
    Abstract: Disclosed therein are an apparatus for and a method of welding a flange to a guide thimble tube in a nuclear fuel assembly. The automatic welding apparatus includes a welding unit located on an axially conveying line of a tube for welding a surface of the tube inserted thereinto and a surface of a flange, a flange supplying unit for supplying the flange at a tube inlet of the welding unit onto the axially conveying line, and a conveying unit mounted on the axially conveying line in such a way as to move the tube and the flange on the axially conveying line, so that they are inserted into and drawn from the welding unit.
    Type: Grant
    Filed: October 31, 2013
    Date of Patent: April 28, 2015
    Assignee: Korea Nuclear Fuel Co., Ltd.
    Inventors: Ki-jun Kwon, Se-yong Shin, Sang-pil Kong, Hung-soon Chang, Jeong-ho Kim, Tae-hyung Na
  • Publication number: 20140192943
    Abstract: Disclosed is a fuel rod testing apparatus for a nuclear fuel assembly. The fuel rod testing apparatus includes a helium leakage testing chamber having a gate so that a fuel rod is horizontally loaded/unloaded and testing whether or not helium leaks from the fuel rod, a fuel rod upward/downward transfer unit that has first and second transfer sections located in front of the gate and horizontally installed apart from each other in order to guide the fuel rod loaded into or unloaded from the helium leakage testing chamber, and that vertically drives the first and second transfer sections, and a main frame that has a upper transfer section disposed in parallel in a lengthwise direction of the fuel rod upward/downward transfer unit and having an inclined face and a lower transfer section installed at a lower portion of the upper transfer section and having an inclined face.
    Type: Application
    Filed: January 8, 2014
    Publication date: July 10, 2014
    Applicant: KEPCO NUCLEAR FUEL CO., LTD.
    Inventors: Ju Young LEE, Chang Hwan HWANG, Hung Soon CHANG, Soon Ki GUK, Tae Hyung NA, Ui Jea LEE
  • Publication number: 20140190943
    Abstract: Disclosed is an automatic welding apparatus for an end plug of a nuclear fuel rod, which is used to perform resistance welding on a cladding tube and the end plug in a welding chamber. The automatic welding apparatus includes a welding chamber configured to perform resistance welding on an end plug and a cladding tube, a cladding tube transfer unit that has a cladding tube clamp fixedly clamping the cladding tube and a first servo motor for driving the cladding tube clamp in a horizontal direction and that horizontally transfers the cladding tube to the welding chamber, end plug welding electrodes gripping the end plug fed from an end plug feeder, an end plug transfer driver for driving the end plug welding electrodes toward the welding chamber in a forward/backward direction, and a position control module for controlling driving of the first servo motor and the end plug transfer driver.
    Type: Application
    Filed: April 17, 2013
    Publication date: July 10, 2014
    Applicant: KEPCO NUCLEAR FUEL CO., LTD.
    Inventors: Young Choon CHO, Chang Hwan Hwang, Hung Soon Chang, Sang Pil Kong, Tae Hyung Na, Young Seok Yoon
  • Publication number: 20140190945
    Abstract: Disclosed is a plasma welding apparatus for a guide thimble and guide thimble end plug of a nuclear fuel assembly, which includes: a welding chamber (100) includes an end-plug inserting part (110) into which the end plug (10) is inserted, a guide-thimble inserting part (120) which is provided on the same axis as the end-plug inserting part (110) and into which the guide thimble (20) is inserted and fixed, a torch assembling part (130) to which a plasma welding torch (131) is assembled so as to make a right angle with the end-plug inserting part (110) and the guide-thimble inserting part (120), and argon inflow and outflow ports (141, 142) through which argon is supplied or discharged; an end-plug transfer unit (210) supplying the end plug (10) to the end-plug inserting part (110); and an guide-thimble transfer unit (220) transferring the guide thimble (20) to the guide-thimble inserting part (120).
    Type: Application
    Filed: January 7, 2014
    Publication date: July 10, 2014
    Applicant: KEPCO NUCLEAR FUEL CO., LTD.
    Inventors: Ju Young LEE, Chang Hwan Hwang, Hung Soon Chang, Soon Ki Guk, Tae Hyung Na, Yeong Seon Oh
  • Publication number: 20140097229
    Abstract: Disclosed therein are an apparatus for and a method of welding a flange to a guide thimble tube in a nuclear fuel assembly. The automatic welding apparatus includes a welding unit located on an axially conveying line of a tube for welding a surface of the tube inserted thereinto and a surface of a flange, a flange supplying unit for supplying the flange at a tube inlet of the welding unit onto the axially conveying line, and a conveying unit mounted on the axially conveying line in such a way as to move the tube and the flange on the axially conveying line, so that they are inserted into and drawn from the welding unit.
    Type: Application
    Filed: October 31, 2013
    Publication date: April 10, 2014
    Applicant: Korea Nuclear Fuel Co., Ltd.
    Inventors: Ki-jun KWON, Se-yong SHIN, Sang-pil KONG, Hung-soon CHANG, Jeong-ho KIM, Tae-hyung NA
  • Publication number: 20140072389
    Abstract: An apparatus for automatically loading a fuel pellet for manufacturing a nuclear fuel rod includes a tray transfer unit that horizontally transfers a tray; a fuel pellet alignment unit that aligns fuel pellets arranged in the tray; a measurement unit that measures an entire length of the fuel pellets arranged in a row on the tray; a controller that compares an accumulated measured length with a set length; and a waiting table located adjacent to the tray transfer unit to store a redundancy fuel pellet; and a fuel pellet movement unit configured to be driven by the controller and configured to move the fuel pellet between a tray of which length measurement is completed by the measurement unit and the waiting table to increase or decrease the fuel pellet arranged on the tray.
    Type: Application
    Filed: January 3, 2013
    Publication date: March 13, 2014
    Applicant: KEPCO NUCLEAR FUEL CO., LTD.
    Inventors: Se Yong SHIN, Chang Hwan HWANG, Hung Soon CHANG, Tae Hyung NA, Bong Sik MOON, Young Seok YOON
  • Patent number: 8622277
    Abstract: Disclosed therein are an apparatus for and a method of automatically welding a flange to a guide thimble tube in a nuclear fuel assembly. The automatic welding apparatus includes: a welding part located on an axially conveying line of a tube for welding a welded surface of the tube inserted thereinto and a welded surface of a flange; a flange supplying part for supplying the flange at a tube inlet of the welding part onto the axially conveying line; and a conveying part mounted on the axially conveying line in such a way as to move the tube and the flange on the axially conveying line, so that they are inserted into and drawn from the welding part.
    Type: Grant
    Filed: January 13, 2010
    Date of Patent: January 7, 2014
    Assignee: Korea Nuclear Fuel Co., Ltd.
    Inventors: Ki-jun Kwon, Se-yong Shin, Sang-pil Kong, Hung-soon Chang, Jeong-ho Kim, Tae-hyung Na