Patents by Inventor Jan Ove BREVIK

Jan Ove BREVIK has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Publication number: 20220341313
    Abstract: A system and method of analysing drilling cuttings using image data output from a hyperspectral imaging device and at least one optical camera, includes generating a hyperspectral imaging data set including a plurality of lines of hyperspectral data derived from line images taken by the hyperspectral imaging device positioned along a drilling fluid cuttings path, obtaining tracking information in respect of particles of interest from the output of the at least one optical camera, correcting the position of pixels associated with particles of interest in the plurality of lines of hyperspectral imaging data based on the obtained tracking information to generate corrected hyperspectral imaging data, and analysing the corrected hyperspectral imaging data to characterise the cuttings.
    Type: Application
    Filed: September 15, 2020
    Publication date: October 27, 2022
    Applicant: Equinor Energy AS
    Inventors: Jan Ove BREVIK, Åsmund HJULSTAD, Arne VOSKAMP, Robert Klein BRETELER, Jelmer BRAAKSMA
  • Patent number: 11085287
    Abstract: A method of measuring the viscosity of cement slurry used for a primary cementing of an oil or gas well includes pumping the cement slurry along a conduit to a cementing location, measuring a first pressure loss along a first, horizontal portion of the conduit and a second pressure loss along a second, vertical portion of the conduit, and calculating a viscosity of the cement slurry based at least in part on the first and second pressure losses and a flow rate of the cement slurry.
    Type: Grant
    Filed: August 26, 2016
    Date of Patent: August 10, 2021
    Assignee: STATOIL PETROLEUM AS
    Inventors: Åsmund Hjulstad, Jan Ove Brevik
  • Publication number: 20180328162
    Abstract: A method and system for calculating the viscosity of cement slurry used for a primary cementing of an oil or gas well (12) comprises: pumping the cement slurry along a conduit (16) to a cementing location (20); measuring a first pressure loss along a first, horizontal portion (28) of the conduit (16) and a second pressure loss along a second, vertical portion (30) of the conduit (16); and calculating a viscosity of the cement slurry based at least in part on the first and second pressure losses and a flow rate of the cement slurry.
    Type: Application
    Filed: August 26, 2016
    Publication date: November 15, 2018
    Inventors: Åsmund HJULSTAD, Jan Ove BREVIK