Patents by Inventor Jason Russell Bruce DICKSON

Jason Russell Bruce DICKSON has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 10145225
    Abstract: A hydrocarbon production process comprising operating a first early stage hydrocarbon production process within a first communication domain with a first well pair, and operating a second early stage hydrocarbon production process within a second communication domain with a second well pair, such that an intermediate reservoir region including stranded bitumen becomes disposed between the first and second communication domains; wherein the first early stage hydrocarbon production process includes injecting a first production-initiating fluid via a first injection well of the first well pair into a first communication domain such that hydrocarbon material is mobilized and conducted to a first production well of the first well pair, and producing the received hydrocarbon material via the first production well; and wherein the second early stage hydrocarbon production process includes injecting a second production-initiating fluid via a second injection well of the second well pair into a second communication do
    Type: Grant
    Filed: July 8, 2016
    Date of Patent: December 4, 2018
    Assignee: NEXEN ENERGY ULC
    Inventors: Julio Sanchez, Jason Russell Bruce Dickson, Sergio Merchan
  • Publication number: 20170009562
    Abstract: A hydrocarbon production process comprising operating a first early stage hydrocarbon production process within a first communication domain with a first well pair, and operating a second early stage hydrocarbon production process within a second communication domain with a second well pair, such that an intermediate reservoir region including stranded bitumen becomes disposed between the first and second communication domains; wherein the first early stage hydrocarbon production process includes injecting a first production-initiating fluid via a first injection well of the first well pair into a first communication domain such that hydrocarbon material is mobilized and conducted to a first production well of the first well pair, and producing the received hydrocarbon material via the first production well; and wherein the second early stage hydrocarbon production process includes injecting a second production-initiating fluid via a second injection well of the second well pair into a second communication do
    Type: Application
    Filed: July 8, 2016
    Publication date: January 12, 2017
    Inventors: Julio SANCHEZ, Jason Russell Bruce DICKSON, Sergio MERCHAN