Patents by Inventor Jinjiang YU

Jinjiang YU has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 12340429
    Abstract: Provided are a distributed energy storage planning method and system for a power distribution network. The method includes a step S1 of setting a mathematical indicator for quantitatively evaluating superiority and inferiority of construction positions of distributed energy storage assemblies as a location evaluation indicator in a distribution area of a distributed power supply, a step S2 of planning an optimal laying path of the distributed energy storage assemblies in a planning area based on the location evaluation indicator and a step S3 of constructing the distributed energy storage assemblies according to the optimal laying path and connecting the distributed energy storage assemblies to the power distribution network to perform an energy storage operation so that the distributed power supply performs orderly energy storage on the distributed energy storage assemblies in the power distribution network.
    Type: Grant
    Filed: December 5, 2022
    Date of Patent: June 24, 2025
    Assignee: DONGGUAN POWER BUREAU OF GUANGDONG POWER GRID CO., LTD.
    Inventors: Chuanliang Zhang, Haitao Li, Zhiyang Liu, Jinrun Huang, Chongzhi Zhai, Wei Du, Xiaofei Wan, Tianhang Wang, Zhirong Mai, Huifang Zheng, Jiaying Feng, Wenhui Huang, Jinjiang Yu, Jianming Chen
  • Publication number: 20250111450
    Abstract: Provided are a distributed energy storage planning method and system for a power distribution network. The method includes a step S1 of setting a mathematical indicator for quantitatively evaluating superiority and inferiority of construction positions of distributed energy storage assemblies as a location evaluation indicator in a distribution area of a distributed power supply, a step S2 of planning an optimal laying path of the distributed energy storage assemblies in a planning area based on the location evaluation indicator and a step S3 of constructing the distributed energy storage assemblies according to the optimal laying path and connecting the distributed energy storage assemblies to the power distribution network to perform an energy storage operation so that the distributed power supply performs orderly energy storage on the distributed energy storage assemblies in the power distribution network.
    Type: Application
    Filed: December 5, 2022
    Publication date: April 3, 2025
    Inventors: Chuanliang ZHANG, Haitao LI, Zhiyang LIU, Jinrun HUANG, Chongzhi ZHAI, Wei DU, Xiaofei WAN, Tianhang WANG, Zhirong MAI, Huifang ZHENG, Jiaying FENG, Wenhui HUANG, Jinjiang YU, Jianming CHEN