Patents by Inventor Johannes Stille

Johannes Stille has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 9506765
    Abstract: A method and system for calculating an energy efficient route is disclosed. A route calculation application calculates one or more routes from an origin to a destination. For each of the routes, the route calculation application uses segment cost data associated with each segment in the route. The segment cost is calculated by adjusting an energy consumption value by subtracting a bias term for each segment with known slope data. The bias term causes segment costs associated with segments having a slope that can be traveled with typical efficiency, a zero slope, and an unknown slope to be substantially the same. The bias term also causes the segment cost associated with a segment with a slope that can be traveled efficiently to be less than the segment cost associated with a segment with unknown slope, and the segment cost associated with a segment with a slope that causes inefficient travel to be greater than the segment cost associated with a segment with unknown slope.
    Type: Grant
    Filed: September 6, 2013
    Date of Patent: November 29, 2016
    Assignee: HERE Global B.V.
    Inventor: Johannes Stille
  • Publication number: 20140005943
    Abstract: A method and system for calculating an energy efficient route is disclosed. A route calculation application calculates one or more routes from an origin to a destination. For each of the routes, the route calculation application uses segment cost data associated with each segment in the route. The segment cost is calculated by adjusting an energy consumption value by subtracting a bias term for each segment with known slope data. The bias term causes segment costs associated with segments having a slope that can be traveled with typical efficiency, a zero slope, and an unknown slope to be substantially the same. The bias term also causes the segment cost associated with a segment with a slope that can be traveled efficiently to be less than the segment cost associated with a segment with unknown slope, and the segment cost associated with a segment with a slope that causes inefficient travel to be greater than the segment cost associated with a segment with unknown slope.
    Type: Application
    Filed: September 6, 2013
    Publication date: January 2, 2014
    Applicant: Navteq B.V.
    Inventor: Johannes Stille
  • Patent number: 8543328
    Abstract: A method and system for calculating an energy efficient route is disclosed. A route calculation application calculates one or more routes from an origin to a destination. For each of the routes, the route calculation application uses segment cost data associated with each segment in the route. The segment cost is calculated by adjusting an energy consumption value by subtracting a bias term for each segment with known slope data. The bias term causes segment costs associated with segments having a slope that can be traveled with typical efficiency, a zero slope, and an unknown slope to be substantially the same. The bias term also causes the segment cost associated with a segment with a slope that can be traveled efficiently to be less than the segment cost associated with a segment with unknown slope, and the segment cost associated with a segment with a slope that causes inefficient travel to be greater than the segment cost associated with a segment with unknown slope.
    Type: Grant
    Filed: January 11, 2011
    Date of Patent: September 24, 2013
    Assignee: Navteq B.V.
    Inventor: Johannes Stille
  • Publication number: 20120179362
    Abstract: A method and system for calculating an energy efficient route is disclosed. A route calculation application calculates one or more routes from an origin to a destination. For each of the routes, the route calculation application uses segment cost data associated with each segment in the route. The segment cost is calculated by adjusting an energy consumption value by subtracting a bias term for each segment with known slope data. The bias term causes segment costs associated with segments having a slope that can be traveled with typical efficiency, a zero slope, and an unknown slope to be substantially the same. The bias term also causes the segment cost associated with a segment with a slope that can be traveled efficiently to be less than the segment cost associated with a segment with unknown slope, and the segment cost associated with a segment with a slope that causes inefficient travel to be greater than the segment cost associated with a segment with unknown slope.
    Type: Application
    Filed: January 11, 2011
    Publication date: July 12, 2012
    Applicant: NAVTEQ NORTH AMERICA, LLC
    Inventor: Johannes Stille