Patents by Inventor Jose Emilio Jimeno Chueca

Jose Emilio Jimeno Chueca has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 10465411
    Abstract: Assembly process of a telescopic tower (100) including at least one prefabricated concrete section, comprising the following steps: providing sections (2,4,6,8,10) in an initial position wherein superimposed sections are disposed coaxially within a base section (10); providing assembly means (14,16,18); providing operator support means (20) on the external surface of said base section (10) essentially vertically in correspondence with the upper edge of said base section (10); lifting the innermost superimposed section (2,4,6,8) radially from those that are in the initial position forming a joint between the lower end portion of said superimposed section (2,4,6,8) which is being lifted and the upper end portion of the radially external and immediately adjacent section (4,6,8,10); providing in said joint anchoring devices for immobilizing at least provisionally the corresponding sections (2,4,6,8,10) between one another.
    Type: Grant
    Filed: December 10, 2012
    Date of Patent: November 5, 2019
    Assignee: ESTEYCO S.A.P.
    Inventors: Miguel Angel Fernandez Gomez, Jose Emilio Jimeno Chueca
  • Patent number: 10294626
    Abstract: Method for installation of an offshore tower, which comprises: providing a tower mast, piles, anchoring means, a platform with securing means, and buoyancy means with securing means; fastening piles to platform; fastening mast to platform in the use position; providing actuation and/or braking means between piles and platform; providing a platform between lower zone and upper zone; anchoring means to piles and to platform; launching buoyancy means; launching base assembly (platform, mast, piles, anchoring means); securing base assembly to buoyancy means using securing means; transferring transport assembly to tower location; actuating actuation and/or braking means until piles are fixed in the seabed; fastening piles to seabed; actuating actuation and/or braking means until platform is on a level with pile upper zone; mounting wind turbine on mast; removing securing means and withdrawing buoyancy means from platform; and tensioning anchoring means.
    Type: Grant
    Filed: January 24, 2014
    Date of Patent: May 21, 2019
    Assignee: DREIVENTUM, S.L.U.
    Inventors: José Emilio Jimeno Chueca, José Luis Lleyda Dionis
  • Patent number: 9890510
    Abstract: Process for installing an offshore tower, specifically a substructure, which basically comprises the following steps: a) dry manufacturing a foundation comprising a block (1, 1?) basically made of concrete and dry manufacturing a base section (25) of a shaft (2); b) applying said base section to said foundation block, forming a unit called the “starting unit”; c) moving said starting unit to the installation point of said substructure; and d) actuating in a controlled manner, first ballast valve means in such a manner that said starting unit sinks until resting on the seabed; having placed said foundation block or said starting unit in the body of water where the installation point said substructure is located.
    Type: Grant
    Filed: September 21, 2011
    Date of Patent: February 13, 2018
    Assignees: ESTEYCO ENERGIA, S.L., SEA WIND TOWERS S.L.
    Inventors: Miguel Angel Fernandez Gomez, Jose Emilio Jimeno Chueca
  • Patent number: 9777451
    Abstract: Process for installing an offshore tower, comprising: a) manufacturing a foundation comprising a block, manufacturing at least one superposition section of a shaft, and manufacturing a base section of a shaft; b) applying said base section to said foundation block (starting unit) to assume the relative position for the installed condition, applying said superposition sections to said starting unit in a multi-layered configuration, and applying lifting means to at least one of said foundation block and said base section; c) moving said starting unit up to the installation point; d) introducing ballast in said foundation block so that said starting unit sinks until resting on the bottom of the body of water; e) actuating said lifting means to expand said sections into the installed condition; f) between step a) and c), placing said foundation block or starting unit in the body of water of the installation point.
    Type: Grant
    Filed: October 18, 2012
    Date of Patent: October 3, 2017
    Assignees: ESTEYCO S.A.P., SEA WIND TOWERS, S.L.
    Inventors: Miguel Angel Fernandez Gomez, Jose Emilio Jimeno Chueca
  • Publication number: 20170204836
    Abstract: It is foreseen that the footing be executed in an excavation, such that a lower concrete slab (2), with its corresponding steel reinforcement, is obtained at the base of the same, and upon which a plurality of prefabricated partitions (3), likewise of concrete, are radially disposed in the shape of a crown at a prefabricated or executed in situ concrete zone (4), such that the spaces defined between these elements are filled with the material (5) obtained by means of the excavation, in order finally to achieve a total or partial upper slab (1) upon this assembly. In this way, and by means of the inclusion of prefabricated elements, the construction works are simplified, which affects favourably both the time frame of execution and the fabrication costs.
    Type: Application
    Filed: February 17, 2015
    Publication date: July 20, 2017
    Inventors: Jose Emilio Jimeno Chueca, Jose Luis Lleyda Dionis, Jose Salustiano Serna Garcia-Conde
  • Publication number: 20170016242
    Abstract: The invention relates to a system having multiple improvements compared to conventional systems for building wind towers made of section of reinforced concrete, in order to significantly reduce building costs. Such improvements include: obtaining a profile extruding from truncated cone sections that conform as much as possible to the ideal curved profile of the tower; using pre-stretched cables, which are factory-tensioned before installing the rebar, and tendons that pass through the arch stones, making it possible to link various arch stones with one another; and reducing the thickness of the arch stones; and arranging the rebar in only one layer, as well as other improvements described through the present invention.
    Type: Application
    Filed: March 4, 2015
    Publication date: January 19, 2017
    Inventors: Jose Emilio JIMENO CHUECA, Jose Luis LLEYDA DIONIS, Jose Salustiano SERNA GARCIA-CONDE
  • Publication number: 20150361965
    Abstract: Method for installation of an offshore tower, which comprises: providing a tower mast, piles, anchoring means, a platform with securing means, and buoyancy means with securing means; fastening piles to platform; fastening mast to platform in the use position; providing actuation and/or braking means between piles and platform; providing a platform between lower zone and upper zone; anchoring means to piles and to platform; launching buoyancy means; launching base assembly (platform, mast, piles, anchoring means); securing base assembly to buoyancy means using securing means; transferring transport assembly to tower location; actuating actuation and/or braking means until piles are fixed in the seabed; fastening piles to seabed; actuating actuation and/or braking means until platform is on a level with pile upper zone; mounting wind turbine on mast; removing securing means and withdrawing buoyancy means from platform; and tensioning anchoring means.
    Type: Application
    Filed: January 24, 2014
    Publication date: December 17, 2015
    Inventors: José Luis LLEYDA DIONIS, José Emilio JIMENO CHUECA
  • Publication number: 20140311085
    Abstract: Assembly process of a telescopic tower (100) including at least one prefabricated concrete section, comprising the following steps: providing sections (2,4,6,8,10) in an initial position wherein superimposed sections are disposed coaxially within a base section (10); providing assembly means (14,16,18); providing operator support means (20) on the external surface of said base section (10) essentially vertically in correspondence with the upper edge of said base section (10); lifting the innermost superimposed section (2,4,6,8) radially from those that are in the initial position forming a joint between the lower end portion of said superimposed section (2,4,6,8) which is being lifted and the upper end portion of the radially external and immediately adjacent section (4,6,8,10); providing in said joint anchoring devices for immobilizing at least provisionally the corresponding sections (2,4,6,8,10) between one another.
    Type: Application
    Filed: December 10, 2012
    Publication date: October 23, 2014
    Applicant: SEA WIND TOWERS, S.L.
    Inventors: Miguel Angel Fernandez Gomez, Jose Emilio Jimeno Chueca
  • Publication number: 20140298737
    Abstract: A socket-projection fixing assembly for a horizontal wet joint (3) between two cylindrical concrete sections (2.2?) for a wind turbine tower, which comprises socket-projection fixing device with an active internal reinforcement (8) and a socket-projection fixing device with a passive internal reinforcement (7) so that said reinforcements each include an embedded portion which is embedded in a first section of said cylindrical sections and a projecting portion which projects from said first section and is housed in a duct (9, 10) in a second section of said cylindrical sections. Said active internal reinforcement includes tightening means (14, 16) which are arranged in said projecting portion of said active internal reinforcement and against a supporting surface (15) of one of said cylindrical sections, and said passive internal reinforcement includes cured material (12) which is arranged around said projecting portion o said passive internal reinforcement (7) and adheres to the interior of said duct (10).
    Type: Application
    Filed: June 8, 2012
    Publication date: October 9, 2014
    Applicants: ESTEYCO ENERGIA S.L., INNEO TORRES, S.L.
    Inventors: Miguel Angel Fernandez Gomez, Jose Emilio Jimeno Chueca
  • Publication number: 20140248090
    Abstract: Process for installing an offshore tower, comprising: a) manufacturing a foundation comprising a block (1, 1?), manufacturing at least one superposition section of a shaft (7), and manufacturing a base section (25) of a shaft; b) applying said base section to said foundation block (starting unit) to assume the relative position for the installed condition, applying said superposition sections to said starting unit in a multi-layered configuration, and applying lifting means to said foundation block and/or said base section; c) moving said starting unit up to the installation point; d) introducing ballast in said foundation block so that said starting unit sinks until resting on the bottom of the body of water; e) actuating said lifting means to expand said sections into the installed condition; f) between step a) and c), placing said foundation block or starting unit in the body of water of the installation point.
    Type: Application
    Filed: October 18, 2012
    Publication date: September 4, 2014
    Applicant: SEA WIND TOWERS, S.L.
    Inventors: Miguel Angel Fernandez Gomez, Jose Emilio Jimeno Chueca
  • Publication number: 20140054110
    Abstract: Method for accessing the outer surface of wind turbine towers comprising the following steps: attaching an external peripheral rail on the outer surface of the tower; making an orifice above said rail; arranging a working platform on the base of the tower; inserting a cable reel in the orifice; raising the platform by driving the cable reel until it is near the peripheral rail; arranging means for suspension and horizontal displacement on the horizontal rail; connecting the platform to said means for suspension and horizontal displacement and displacing the platform as needed.
    Type: Application
    Filed: March 2, 2012
    Publication date: February 27, 2014
    Applicant: INNEO TORRES, S.L.
    Inventors: Miguel Ángel Fernández Gómez, José Emilio Jimeno Chueca
  • Publication number: 20130243531
    Abstract: Process for installing an offshore tower, specifically a substructure, which basically comprises the following steps: a) dry manufacturing a foundation comprising a block (1, 1?) basically made of concrete and dry manufacturing a base section (25) of a shaft (2); b) applying said base section to said foundation block, forming a unit called the “starting unit”; c) moving said starting unit to the installation point of said substructure; and d) actuating in a controlled manner, first ballast valve means in such a manner that said starting unit sinks until resting on the seabed; having placed said foundation block or said starting unit in the body of water where the installation point said substructure is located.
    Type: Application
    Filed: September 21, 2011
    Publication date: September 19, 2013
    Applicants: SEA WIND TOWERS, S.L., ESTEYCO ENERGIA S.L
    Inventors: Miguel Angel Fernandez Gomez, Jose Emilio Jimeno Chueca
  • Patent number: 8505244
    Abstract: A tower structure for a wind energy turbine, wind power, renewable energy, and other uses made of concrete, steel-reinforced concrete or other materials, and a method of manufacture thereof are described. The structure includes several pre-fabricated tower lengths, each tower length having at least three pre-fabricated wedges, such that a central protruding edge of each wedge approaches or lies at a center line of the tower structure when assembled. Tower lengths higher in the tower may be narrower and may be made up of fewer wedges than lower tower lengths. Each tower length may also include several apertures or channels adapted to accommodate a cable joining all the tower lengths of the tower. Also, tower lengths may have a circular or polygonal outer ring made up of bracing elements, each bracing element arranged when assembled to brace one or more wedges.
    Type: Grant
    Filed: December 15, 2005
    Date of Patent: August 13, 2013
    Assignee: Inne021 S.L.
    Inventors: Miguel Angel Fernandez Gomez, Jose Emilio Jimeno Chueca
  • Patent number: 8381487
    Abstract: Structure and procedure for erecting concrete towers used in wind turbines in which said towers consist of sections, which in turn may each comprise a different number of segments or longitudinal sections. The procedure includes two differentiated cycles, which may take place alongside each other: the pre-assembly of each section of tower and their assembly. The sections may be pre-mounted on bases placed on the ground, with the segment in turn fitted with the help of struts and mechanical clamps. This procedure is extremely versatile in that it makes the best logistic use of the material, resources and requisite assembly times since the assembly procedures for each section can be developed alongside each other in the different wind farm towers, and also greater heights can be achieved than is traditionally possible.
    Type: Grant
    Filed: June 24, 2010
    Date of Patent: February 26, 2013
    Assignee: Inneo21, S.L.
    Inventors: Miguel Angel Fernandez Gomez, Jose Emilio Jimeno Chueca
  • Publication number: 20120324823
    Abstract: An operating method of a factory for the molding manufacture of precast concrete voussoirs intended for the construction of wind generator support towers by placing the factory in a place of origin in a disassembled state in initial units that are smaller than the voussoirs to be manufactured, taking the initial units to a building site close to the point of delivery of the voussoirs to be manufactured, assembling the factory at the building site starting from the initial units, manufacturing the pertinent voussoirs by means of the factory in the assembled state, disassembling the factory at the building site until the factory is in a disassembled state in final units that are smaller than the manufactured voussoirs, and taking the final units to a place of destination leaving the building site in basically the same conditions as before assembling the factory at the building site.
    Type: Application
    Filed: August 31, 2012
    Publication date: December 27, 2012
    Applicant: INNEO TORRES S.L.
    Inventors: Miguel Angel Fernández Gómez, José Emilio Jimeno Chueca
  • Publication number: 20110127691
    Abstract: A factory for the molding manufacture of precast concrete voussoirs for the construction of wind generator support towers, the concrete voussoirs manufactured by molding in said factory, and a wind generator support tower at least partially constructed by concrete voussoirs manufactured by molding in said factory, as well as to the operating method of said factory.
    Type: Application
    Filed: November 30, 2010
    Publication date: June 2, 2011
    Applicant: INNEO TORRES S.L.
    Inventors: Miguel Ángel Fernández Gómez, José Emilio Jimeno Chueca
  • Publication number: 20100257797
    Abstract: Structure and procedure for erecting concrete towers used in wind turbines in which said towers consist of sections, which in turn may each comprise a different number of segments or longitudinal sections. The procedure includes two differentiated cycles, which may take place alongside each other: the pre-assembly of each section of tower and their assembly. The sections may be pre-mounted on bases placed on the ground, with the segment in turn fitted with the help of struts and mechanical clamps. This procedure is extremely versatile in that it makes the best logistic use of the material, resources and requisite assembly times since the assembly procedures for each section can be developed alongside each other in the different wind farm towers, and also greater heights can be achieved than is traditionally possible.
    Type: Application
    Filed: June 24, 2010
    Publication date: October 14, 2010
    Inventors: Miguel Angel Fernandez GOMEZ, Jose Emilio Jimeno Chueca
  • Patent number: 7765766
    Abstract: Structure and procedure for erecting concrete towers used in wind turbines in which said towers consist of sections, which in turn may each comprise a different number of segments or longitudinal sections. The procedure includes two differentiated cycles, which may take place alongside each other: the pre-assembly of each section of tower and their assembly. The sections may be pre-mounted on bases placed on the ground, with the segment in turn fitted with the help of struts and mechanical clamps. This procedure is extremely versatile in that it makes the best logistic use of the material, resources and requisite assembly times since the assembly procedures for each section can be developed alongside each other in the different wind farm towers, and also greater heights can be achieved than is traditionally possible.
    Type: Grant
    Filed: July 26, 2007
    Date of Patent: August 3, 2010
    Assignee: INNEO21, S.L.
    Inventors: Miguel Angel Fernandez Gomez, Jose Emilio Jimeno Chueca
  • Publication number: 20080040983
    Abstract: Structure and procedure for erecting concrete towers used in wind turbines in which said towers consist of sections, which in turn may each comprise a different number of segments or longitudinal sections. The procedure includes two differentiated cycles, which may take place alongside each other: the pre-assembly of each section of tower and their assembly. The sections may be pre-mounted on bases placed on the ground, with the segment in turn fitted with the help of struts and mechanical clamps. This procedure is extremely versatile in that it makes the best logistic use of the material, resources and requisite assembly times since the assembly procedures for each section can be developed alongside each other in the different wind farm towers, and also greater heights can be achieved than is traditionally possible.
    Type: Application
    Filed: July 26, 2007
    Publication date: February 21, 2008
    Inventors: Miguel Angel Fernandez Gomez, Jose Emilio Jimeno Chueca