Patents by Inventor Joseph Foster
Joseph Foster has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).
-
Patent number: 12286874Abstract: Systems and methods for operating hydraulic fracturing units to pump fracturing fluid into a wellhead may include receiving a target flow rate and/or a target pressure for fracturing fluid supplied to the wellhead. The systems and methods may increase a flow rate from the hydraulic fracturing units according to a controlled increasing flow rate schedule toward the target flow rate and/or target pressure. When it has been determined the target flow rate and/or target pressure has been achieved, the systems and methods also may include operating the hydraulic fracturing units to maintain the target flow rate and/or target pressure. When the target flow rate has not been achieved, the systems and methods also may include generating notification signals, and/or when the target pressure has not been achieved, the systems and methods further may include operating the hydraulic fracturing units to maintain a maximum flow rate.Type: GrantFiled: February 15, 2024Date of Patent: April 29, 2025Assignee: BJ Energy Solutions, LLCInventors: Tony Yeung, Ricardo Rodriguez-Ramon, Joseph Foster
-
Publication number: 20250084743Abstract: A system and method of enhancing operation of hydraulic fracturing equipment at a hydraulic fracturing wellsite may include determining if a hydraulic fracturing stage profiles are available for use for hydraulic fracturing equipment at a wellsite. The method may include prompting an acceptance or amendment of one of the hydraulic fracturing stage profiles for a hydraulic fracturing pumping stage. The method may include, in response to an amendment of one of the hydraulic fracturing stage profiles, prompting acceptance of the amended hydraulic fracturing stage profile as the current hydraulic fracturing stage profile for use in association with the controller. The method may include, when a hydraulic fracturing stage profile is not available, prompting configuration of hydraulic fracturing pumping stage parameters for the current hydraulic fracturing stage profile.Type: ApplicationFiled: March 6, 2024Publication date: March 13, 2025Applicant: BJ Energy Solutions, LLCInventors: Tony Yeung, Ricardo Rodriguez-Ramon, Joseph Foster
-
Publication number: 20250003321Abstract: Methods, systems, and controllers for detecting and mitigating well screen outs may include a controller configured to operate a fracturing pump to supply fluid at a discharge rate to a wellhead at a fracturing well site. The controller may also operate a blender positioned to deliver a blend of proppant and fluid to the fracturing pump. The controller may compare a fluid pressure increase rate to a preselected increase rate indicative of a potential well screen out. The controller may incrementally decrease the discharge rate of the fracturing pump and a flow rate of a blender when the fluid pressure increase rate of the wellhead exceeds the preselected increase rate and the fluid pressure is within a preselected percentage of a maximum wellhead pressure until the fluid pressure of the fluid supplied to the wellhead is stabilized.Type: ApplicationFiled: February 21, 2024Publication date: January 2, 2025Applicant: BJ Energy Solutions, LLCInventors: Tony Yeung, Ricardo Rodriguez-Ramon, Joseph Foster
-
Patent number: 12180128Abstract: A smoke producing method and device of the present disclosure produces a non-incendiary, organic-polymerization based, smoke-producing reaction. Some versions of the smoke are effective carriers for capsaicinoid compounds. The method of generating smoke comprises initiating a frontal polymerization reaction by heating a composition comprising a monomer compound that exothermically polymerizes upon initiation with an initiator compound and an initiator compound that initiates polymerization of the monomer compound present at a mass concentration that is at least five percent of the mass concentration of the monomer compound. The polymerization of the monomer compound is exothermic, and in one embodiment the concentration of initiator compound is at least five percent of the concentration of monomer compound. The smoke mainly comprises thermal decomposition products of the initiator compound.Type: GrantFiled: January 29, 2021Date of Patent: December 31, 2024Inventors: R Michael Banish, Peter S Erbach, Joseph Foster
-
Publication number: 20240392729Abstract: Embodiments of systems and methods for air recovery are disclosed. The diverted pressurized air may be used to supply a hydrostatic purge to the unutilized portion of a turbine engine fuel manifold circuit to ensure that exhaust gases from the utilized side of the fuel manifold circuit do not enter the portion of the alternative fuel manifold circuit rack. The assembly used to remove compressor section pressurized air may include a flow control orifice, line pressure measuring instrumentation, non-return valves, isolation valves and hard stainless-steel tubing assemblies. In some embodiments, a turbine compressor section diverter system may include a small air receiver used to increase the volume of air supplying the manifold to aid in potential pressure and flow disruptions from a turbine engine compressor section.Type: ApplicationFiled: December 26, 2023Publication date: November 28, 2024Applicant: BJ Energy Solutions, LLCInventors: Tony YEUNG, Ricardo RODRIGUEZ-RAMON, Joseph FOSTER
-
Publication number: 20240384636Abstract: Systems and methods for operating hydraulic fracturing units, each including a hydraulic fracturing pump to pump fracturing fluid into a wellhead and an internal combustion engine to drive the hydraulic fracturing pump, may include receiving signals indicative of operational parameters. The systems and methods also may include determining an amount of required fracturing power sufficient to perform the hydraulic fracturing operation, determining an available power to perform the hydraulic fracturing operation and a difference between the available power and the required power, and controlling operation of the hydraulic fracturing units based at least in part on the power difference. When the power difference is indicative of excess power available, the system and methods may include causing at least one of the hydraulic fracturing units to idle, and when the power difference is indicative of a power deficit, increasing a power output of at least one of the hydraulic fracturing units.Type: ApplicationFiled: July 18, 2024Publication date: November 21, 2024Applicant: BJ Energy Solutions, LLCInventors: Tony YEUNG, Ricardo RODRIGUEZ-RAMON, Joseph FOSTER
-
Publication number: 20240368972Abstract: Systems and methods for operating hydraulic fracturing units to pump fracturing fluid into a wellhead may include receiving a target flow rate and/or a target pressure for fracturing fluid supplied to the wellhead. The systems and methods may increase a flow rate from the hydraulic fracturing units according to a controlled increasing flow rate schedule toward the target flow rate and/or target pressure. When it has been determined the target flow rate and/or target pressure has been achieved, the systems and methods also may include operating the hydraulic fracturing units to maintain the target flow rate and/or target pressure. When the target flow rate has not been achieved, the systems and methods also may include generating notification signals, and/or when the target pressure has not been achieved, the systems and methods further may include operating the hydraulic fracturing units to maintain a maximum flow rate.Type: ApplicationFiled: February 15, 2024Publication date: November 7, 2024Applicant: BJ Energy Solutions, LLCInventors: Tony Yeung, Ricardo Rodriguez-Ramon, Joseph Foster
-
Publication number: 20240344440Abstract: A system and method for operating a fleet of pumps for a turbine driven fracturing pump system used in hydraulic fracturing is disclosed. A method of operating a fleet of pumps associated with a hydraulic fracturing system includes receiving a demand Hydraulic Horse Power (HHP) signal. The demand HHP signal may include the Horse Power (HP) required for the hydraulic fracturing system to operate and may include consideration for frictional and other losses. The method further includes operating all available pump units at a percentage of rating below Maximum Continuous Power (MCP) level, based on the demand HHP signal. Furthermore, the method may include receiving a signal for loss of power from one or more pump units. The method further includes operating one or more units at MCP level and operating one or more units at Maximum Intermittent Power (MIP) level to meet the demand HHP signal.Type: ApplicationFiled: June 27, 2024Publication date: October 17, 2024Applicant: BJ Energy Solutions, LLCInventors: Tony YEUNG, Ricardo RODRIGUEZ-RAMON, Diankui FU, Warren ZEMLAK, Samir Nath SETH, Joseph FOSTER
-
Publication number: 20240295191Abstract: An embodiment of a pumping unit includes a gas turbine engine, an enclosure housing the engine, an exhaust assembly connected to the engine, an air intake duct connected to the engine, and an air treatment system connected to the air intake duct. The air treatment system including one or more inlet pre-cleaners configured to eject debris. Each of the inlet pre-cleaners having a cylindrical tubular portion configured to channel air toward the air intake duct. In addition, the pumping unit includes a gearbox operatively coupled to the engine and a drive shaft having a first end operatively coupled to the gearbox. Further, the pumping unit includes a pump comprising an input shaft operatively coupled to a second end of the drive shaft, wherein the engine, the gearbox, the drive shaft, and the pump are disposed along a longitudinal axis of the pumping unit.Type: ApplicationFiled: May 3, 2024Publication date: September 5, 2024Inventors: Tony Yeung, Ricardo Rodriguez-Ramon, Diankui Fu, Heber Martinez-Barron, Guillermo Rodriguez, Samir Nath Seth, Joseph Foster, Warren Zemlak, Nicholas Tew
-
Publication number: 20240280097Abstract: A methods and system to operate hydraulic fracturing units may include utilizing hydraulic fracturing unit profiles. The system may include hydraulic fracturing units may include various components. The components may include an engine and associated local controller and sensors, a transmission connected to the engine, transmission sensors, and a pump connected to the transmission and powered by the engine via the transmission and associated local controller and sensors. A supervisory controller may control the hydraulic fracturing units. The supervisory controller may be in communication with components of each hydraulic fracturing unit. The supervisory controller may include instructions to, for each hydraulic fracturing units, obtain hydraulic fracturing unit parameters, determine a hydraulic fracturing unit health assessment, and build a hydraulic unit profile including the health assessment and parameters.Type: ApplicationFiled: February 21, 2024Publication date: August 22, 2024Applicant: BJ Energy Solutions, LLCInventors: Tony Yeung, Ricardo Rodriguez-Ramon, Andres Alvarez, Joseph Foster
-
Patent number: 12065968Abstract: An embodiment of a pumping unit includes a gas turbine engine, an enclosure housing the engine, an exhaust assembly connected to the engine, an air intake duct connected to the engine, and an air treatment system connected to the air intake duct. The air treatment system including one or more inlet pre-cleaners configured to eject debris. Each of the inlet pre-cleaners having a cylindrical tubular portion configured to channel air toward the air intake duct. In addition, the pumping unit includes a gearbox operatively coupled to the engine and a drive shaft having a first end operatively coupled to the gearbox. Further, the pumping unit includes a pump comprising an input shaft operatively coupled to a second end of the drive shaft, wherein the engine, the gearbox, the drive shaft, and the pump are disposed along a longitudinal axis of the pumping unit.Type: GrantFiled: April 5, 2023Date of Patent: August 20, 2024Assignee: BJ Energy Solutions, Inc.Inventors: Tony Yeung, Ricardo Rodriguez-Ramon, Diankui Fu, Heber Martinez-Barron, Guillermo Rodriguez, Samir Nath Seth, Joseph Foster, Warren Zemlak, Nicholas Tew
-
Patent number: 12065917Abstract: Systems and methods for operating hydraulic fracturing units, each including a hydraulic fracturing pump to pump fracturing fluid into a wellhead and an internal combustion engine to drive the hydraulic fracturing pump, may include receiving signals indicative of operational parameters. The systems and methods also may include determining an amount of required fracturing power sufficient to perform the hydraulic fracturing operation, determining an available power to perform the hydraulic fracturing operation and a difference between the available power and the required power, and controlling operation of the hydraulic fracturing units based at least in part on the power difference. When the power difference is indicative of excess power available, the system and methods may include causing at least one of the hydraulic fracturing units to idle, and when the power difference is indicative of a power deficit, increasing a power output of at least one of the hydraulic fracturing units.Type: GrantFiled: June 5, 2023Date of Patent: August 20, 2024Assignee: BJ Energy Solutions, LLCInventors: Tony Yeung, Ricardo Rodriguez-Ramon, Joseph Foster
-
Patent number: 12049808Abstract: A system and method for operating a fleet of pumps for a turbine driven fracturing pump system used in hydraulic fracturing is disclosed. In an embodiment, a method of operating a fleet of pumps associated with a hydraulic fracturing system includes receiving a demand Hydraulic Horse Power (HHP) signal. The demand HHP signal may include the Horse Power (HP) required for the hydraulic fracturing system to operate and may include consideration for frictional and other losses. The method further includes operating all available pump units at a percentage of rating below Maximum Continuous Power (MCP) level, based at least in part on the demand HHP signal. Furthermore, the method may include receiving a signal for loss of power from one or more pump units. The method further includes operating one or more units at MCP level and operating one or more units at Maximum Intermittent Power (MIP) level to meet the demand HHP signal.Type: GrantFiled: February 1, 2023Date of Patent: July 30, 2024Assignee: BJ Energy Solutions, LLCInventors: Tony Yeung, Ricardo Rodriguez-Ramon, Diankui Fu, Warren Zemlak, Samir Nath Seth, Joseph Foster
-
Patent number: 12047190Abstract: A method and system to create a mapping of non-attached subnetworks to a Cable Modem Termination System (CMTS) associated with the non-attached subnetwork is provided herein. The method includes transmitting a query to the CMTS for an identification of the non-attached subnetwork and receiving the identification from the CMTS. The method further includes parsing the identification to determine an address of the non-attached subnetwork and mapping an association of the CMTS to the non-attached subnet in a database based on the address.Type: GrantFiled: November 22, 2019Date of Patent: July 23, 2024Assignee: CSC holdings, LLCInventors: Joseph Foster, Javier Fernandez
-
Publication number: 20240151128Abstract: Systems and methods for exchanging fracturing components of a hydraulic fracturing unit and may include an exchangeable fracturing component section to facilitate quickly exchanging a fracturing component of a hydraulic fracturing unit. The fracturing component section may include a section frame including a base, and a fracturing component connected to the base. The fracturing component section also may include a component electrical assembly and a component fluid assembly connected to the section frame. The fracturing component section further may include a coupling plate connected to the section frame. The fracturing component section also may include one or more of a plurality of quick-connect electrical couplers or a plurality of quick-connect fluid couplers connected to a coupling plate.Type: ApplicationFiled: December 18, 2023Publication date: May 9, 2024Applicant: BJ Energy Solutions, LLCInventors: Tony Yeung, Ricardo Rodriguez-Ramon, Joseph Foster
-
Patent number: 11959419Abstract: An exhaust energy recovery system (EERS) and associated methods for an engine are disclosed. An embodiment of an EERS, for example, includes an inlet duct that is configured to divert exhaust gas from an exhaust duct of the engine into the recovery system and an outlet duct configured to return the exhaust gas to the exhaust duct downstream of the inlet duct. The recovery system is configured to heat components or fluids associated with engine to operating temperatures. The recovery system may be part of a mobile power system that is mounted to a single trailer and includes an engine and a power unit such as a high pressure pump or generator mounted to the trailer. Methods of operating and purging recovery systems are also disclosed.Type: GrantFiled: May 10, 2023Date of Patent: April 16, 2024Assignee: BJ Energy Solutions, LLCInventors: Tony Yeung, Ricardo Rodriguez-Ramon, Joseph Foster
-
Patent number: 11952878Abstract: A system and method of enhancing operation of hydraulic fracturing equipment at a hydraulic fracturing wellsite may include determining if a hydraulic fracturing stage profiles are available for use for hydraulic fracturing equipment at a wellsite. The method may include prompting an acceptance or amendment of one of the hydraulic fracturing stage profiles for a hydraulic fracturing pumping stage. The method may include, in response to an amendment of one of the hydraulic fracturing stage profiles, prompting acceptance of the amended hydraulic fracturing stage profile as the current hydraulic fracturing stage profile for use in association with the controller. The method may include, when a hydraulic fracturing stage profile is not available, prompting configuration of hydraulic fracturing pumping stage parameters for the current hydraulic fracturing stage profile.Type: GrantFiled: November 30, 2022Date of Patent: April 9, 2024Assignee: BJ Energy Solutions, LLCInventors: Tony Yeung, Ricardo Rodriguez-Ramon, Joseph Foster
-
Patent number: 11939854Abstract: Methods, systems, and controllers for detecting and mitigating well screen outs may include a controller configured to operate a fracturing pump to supply fluid at a discharge rate to a wellhead at a fracturing well site. The controller may also operate a blender positioned to deliver a blend of proppant and fluid to the fracturing pump. The controller may compare a fluid pressure increase rate to a preselected increase rate indicative of a potential well screen out. The controller may incrementally decrease the discharge rate of the fracturing pump and a flow rate of a blender when the fluid pressure increase rate of the wellhead exceeds the preselected increase rate and the fluid pressure is within a preselected percentage of a maximum wellhead pressure until the fluid pressure of the fluid supplied to the wellhead is stabilized.Type: GrantFiled: November 21, 2022Date of Patent: March 26, 2024Assignee: BJ Energy Solutions, LLCInventors: Tony Yeung, Ricardo Rodriguez-Ramon, Joseph Foster
-
Patent number: D1043769Type: GrantFiled: February 27, 2023Date of Patent: September 24, 2024Assignee: INNOVATIVE DISPLAYWORKS, INC.Inventors: Jerald Joseph Foster, Matthew John Maulucci
-
Patent number: D1053225Type: GrantFiled: February 27, 2023Date of Patent: December 3, 2024Assignee: INNOVATIVE DISPLAYWORKS, INC.Inventors: Jerald Joseph Foster, Matthew John Maulucci