Patents by Inventor Joshua A. Lane
Joshua A. Lane has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).
-
Patent number: 12234255Abstract: Provided herein are methods of glycosylation in the formation of disaccharides, trisaccharides, and oligosaccharides using fluoroglycosides, silyl ether glycosides and a triaryl borane catalyst.Type: GrantFiled: May 14, 2020Date of Patent: February 25, 2025Assignee: REGENTS OF THE UNIVERSITY OF MICHIGANInventors: John Montgomery, Girish Chandra Sati, Joshua Lane Martin
-
Publication number: 20250017801Abstract: A limb support comprises a spar, a limb rest, and a coupler. The spar is configured to be supported from a patient support apparatus and adjustable relative to the patient support and has a longitudinal axis. The coupler includes a release that is selectively actuable to release locking mechanisms to permit adjustment of the limb rest relative to the spar.Type: ApplicationFiled: October 1, 2024Publication date: January 16, 2025Inventors: Timothy A. LANE, II, Joshua J. MORIARTY, David C. NEWKIRK, Neal WIGGERMANN, David J. HITCHCOCK, Zachary S. THEOHARIDIS, Jessica PIMENTAL, Michael DIODATO, Michael NORDLING, Hung NGUYEN, Martin HAENEL
-
Patent number: 12078060Abstract: Aspects of the subject technology relate to systems and methods for controlling a hydraulic fracturing job. Systems and methods are provided for receiving diagnostics data of a hydraulic fracturing completion of a wellbore, accessing a fracture formation model that models formation characteristics of fractures formed through the wellbore into a formation surrounding the wellbore during the hydraulic fracture completion with respect to surface variables of the hydraulic fracturing completion, selecting one or more subsurface objective functions from a plurality of subsurface objective functions for changing one or more of the formation characteristics of the fractures, and applying the fracture formation model based on the diagnostics data to determine values of the surface variables for controlling the formation characteristics of the fractures to converge on the one or more subsurface objective functions.Type: GrantFiled: September 23, 2020Date of Patent: September 3, 2024Assignee: HALLIBURTON ENERGY SERVICES, INC.Inventors: William Owen Alexander Ruhle, Ronald Glen Dusterhoft, Ajish Potty, Joshua Lane Camp
-
Publication number: 20240184270Abstract: A method of controlling a pumping sequence of a fracturing fleet at a wellsite. A managing application executing on a computer in the control van can retrieve the pumping sequence from a local or remote storage computer. The managing application can establish an electronic communication link to receive sensor data from a plurality of fracturing units. The managing application can control the plurality of fracturing units with a stage script with multiple sequential instructions for a pumping stage of a pumping sequence while receiving one or more periodic data sets from the plurality of fracturing units wherein the data sets are indicative of the current state of the pumping stage of the pumping sequence.Type: ApplicationFiled: February 16, 2024Publication date: June 6, 2024Inventors: Mikko JAASKELAINEN, Joshua Lane CAMP, Ian Bradford MITCHELL
-
Patent number: 11939864Abstract: Aspects of the subject technology relate to systems and methods for controlling a hydraulic fracturing job.Type: GrantFiled: October 6, 2020Date of Patent: March 26, 2024Assignee: HALLIBURTON ENERGY SERVICES, INC.Inventors: William Owen Alexander Ruhle, Ronald Glen Dusterhoft, Ajish Potty, Joshua Lane Camp
-
Patent number: 11934180Abstract: A method of controlling a pumping sequence of a fracturing fleet at a wellsite. A managing application executing on a computer in the control van can retrieve the pumping sequence from a local or remote storage computer. The managing application can establish an electronic communication link to receive sensor data from a plurality of fracturing units. The managing application can control the plurality of fracturing units with a stage script with multiple sequential instructions for a pumping stage of a pumping sequence while receiving one or more periodic data sets from the plurality of fracturing units wherein the data sets are indicative of the current state of the pumping stage of the pumping sequence.Type: GrantFiled: May 2, 2023Date of Patent: March 19, 2024Assignee: Halliburton Energy Services, Inc.Inventors: Mikko Jaaskelainen, Joshua Lane Camp, Ian Bradford Mitchell
-
Patent number: 11933161Abstract: A system and method to determine closure pressure in a wellbore that can include, flowing a fracturing fluid into the wellbore during a fracturing operation of at least one stage and forming a fracture, sensing fluid pressure and a flow rate of the fracturing fluid during the fracturing operation and communicating the sensed data to a controller, plotting data points of the sensed data to a visualization device which is configured to visually present the data points to an operator as a plot, fitting a curve to the data points which represent statistically-relevant minimum pressure data at various flow rates, determining an intercept of the first curve with a zero flow rate axis of the plot, determining the closure pressure based on a pressure value of the intercept, and determining an average fracture permeability based on the closure pressure.Type: GrantFiled: October 26, 2021Date of Patent: March 19, 2024Assignee: HALLIBURTON ENERGY SERVICES, INC.Inventors: Vladimir Nikolayevich Martysevich, Joshua Lane Camp, Tyler Austen Anderson, Srinath Madasu
-
Patent number: 11879317Abstract: System and methods of controlling fracture growth during multi-well stimulation treatments. The flow distribution of treatment fluid injected into first and second well formation entry points along multiple wellbores is monitored during a current stage of a multi-well, multistage stimulation treatment. Upon determining the fracture growth and/or monitored flow distribution meets a threshold, a remainder of the current stage is partitioned into a plurality of treatment cycles and at least one diversion phase. A portion of the fluid to be injected into the first well and/or second well formation entry points is allocated to each of the treatment cycles of the partitioned stage. The treatment cycles are performed for the remainder of the current stage using the treatment fluid allocated to each treatment cycle, wherein the flow distribution is adjusted so as not to meet the threshold.Type: GrantFiled: December 21, 2018Date of Patent: January 23, 2024Assignee: Halliburton Energy Services, Inc.Inventors: Timothy Holiman Hunter, Stanley Vernon Stephenson, Mikko Jaaskelainen, Ubong Akpan Inyang, Joshua Lane Camp, Tirumani N. Swaminathan
-
Publication number: 20230266747Abstract: A method of controlling a pumping sequence of a fracturing fleet at a wellsite. A managing application executing on a computer in the control van can retrieve the pumping sequence from a local or remote storage computer. The managing application can establish an electronic communication link to receive sensor data from a plurality of fracturing units. The managing application can control the plurality of fracturing units with a stage script with multiple sequential instructions for a pumping stage of a pumping sequence while receiving one or more periodic data sets from the plurality of fracturing units wherein the data sets are indicative of the current state of the pumping stage of the pumping sequence.Type: ApplicationFiled: May 2, 2023Publication date: August 24, 2023Inventors: Mikko JAASKELAINEN, Joshua Lane CAMP, Ian Bradford MITCHELL
-
Patent number: 11675336Abstract: A method of controlling a pumping sequence of a fracturing fleet at a wellsite. A managing application executing on a computer in the control van can retrieve the pumping sequence from a local or remote storage computer. The managing application can establish an electronic communication link to receive sensor data from a plurality of fracturing units. The managing application can control the plurality of fracturing units with a stage script with multiple sequential instructions for a pumping stage of a pumping sequence while receiving one or more periodic data sets from the plurality of fracturing units wherein the data sets are indicative of the current state of the pumping stage of the pumping sequence.Type: GrantFiled: September 15, 2022Date of Patent: June 13, 2023Assignee: Halliburton Energy Services, Inc.Inventors: Mikko Jaaskelainen, Joshua Lane Camp, Ian Bradford Mitchell
-
Patent number: 11619115Abstract: System and methods of controlling fluid flow during reservoir stimulation treatments are provided. A flow distribution of treatment fluid injected into formation entry points along a wellbore path is monitored during a current stage of a multistage stimulation treatment. Upon determining that the monitored flow distribution meets a threshold, a remainder of the current stage is partitioned into a plurality of treatment cycles and at least one diversion phase for diverting the fluid to be injected away from one or more formation entry points between consecutive treatment cycles. A portion of the fluid to be injected into the formation entry points is allocated to each of the treatment cycles of the partitioned stage. The treatment cycles are performed for the remainder of the current stage using the treatment fluid allocated to each treatment cycle, wherein the flow distribution is adjusted so as not to meet the threshold.Type: GrantFiled: July 27, 2016Date of Patent: April 4, 2023Assignee: Halliburton Energy Services, Inc.Inventors: Joshua Lane Camp, Tyler Austen Anderson, Aaron Gene Russell, Srinath Madasu, Karan Dhuldhoya, Ubong Inyang
-
Publication number: 20230012783Abstract: A method of controlling a pumping sequence of a fracturing fleet at a wellsite. A managing application executing on a computer in the control van can retrieve the pumping sequence from a local or remote storage computer. The managing application can establish an electronic communication link to receive sensor data from a plurality of fracturing units. The managing application can control the plurality of fracturing units with a stage script with multiple sequential instructions for a pumping stage of a pumping sequence while receiving one or more periodic data sets from the plurality of fracturing units wherein the data sets are indicative of the current state of the pumping stage of the pumping sequence.Type: ApplicationFiled: September 15, 2022Publication date: January 19, 2023Inventors: Mikko JAASKELAINEN, Joshua Lane CAMP, Ian Bradford MITCHELL
-
Patent number: 11513500Abstract: A method of controlling a pumping sequence of a fracturing fleet at a wellsite. A managing application executing on a computer in the control van can retrieve the pumping sequence from a local or remote storage computer. The managing application can establish an electronic communication link to receive sensor data from a plurality of fracturing units. The managing application can control the plurality of fracturing units with a stage script with multiple sequential instructions for a pumping stage of a pumping sequence while receiving one or more periodic data sets from the plurality of fracturing units wherein the data sets are indicative of the current state of the pumping stage of the pumping sequence.Type: GrantFiled: October 9, 2020Date of Patent: November 29, 2022Assignee: Halliburton Energy Services, Inc.Inventors: Mikko Jaaskelainen, Joshua Lane Camp, Ian Bradford Mitchell
-
Publication number: 20220267362Abstract: Provided herein are methods of glycosylation in the formation of disaccharides, trisaccharides, and oligosaccharides using fluoroglycosides, silyl ether glycosides and a triaryl borane catalyst.Type: ApplicationFiled: May 14, 2020Publication date: August 25, 2022Inventors: John Montgomery, Girish Chandra Sati, Joshua Lane Martin
-
Patent number: 11421528Abstract: Aspects of the subject technology relate to systems, methods, and computer-readable media for controlling a hydraulic fracturing job. Diagnostics data of a hydraulic fracturing completion of a wellbore can be received. A fracture formation model that models formation characteristics of fractures formed through the wellbore into a formation surrounding the wellbore during the hydraulic fracturing completion with respect to surface variables can be accessed. A subsurface objective function of fracture complexity can be selected from a plurality of subsurface objective functions for changing one or more of the formation characteristics of the fractures. The fracture formation model can be applied based on the diagnostics data to determine values of the surface variables for controlling the formation characteristics of the fractures to converge on the subsurface objective function of fracture complexity. As follows, a fracture completion plan can be formed based on the values of the surface variables.Type: GrantFiled: October 13, 2020Date of Patent: August 23, 2022Assignee: HALLIBURTON ENERGY SERVICES, INC.Inventors: William Owen Alexander Ruhle, Ronald Glen Dusterhoft, Ajish Potty, Joshua Lane Camp
-
Patent number: 11408259Abstract: System and methods of controlling diverter placement during stimulation treatments are provided. Data relating to at least one downhole parameter is obtained for a current treatment stage within a subsurface formation. A response of the diverter to be injected during a diversion phase of the current stage on the downhole parameter is estimated, based on the obtained data and a diagnostic data model. Values for diversion control parameters are calculated, based on the estimated response. As the diverter is injected into the formation, an actual response of the diverter is monitored. Upon determining that a difference between the actual and estimated response exceeds an error tolerance threshold, the model is updated. The model is further updated over subsequent iterations of the diversion phase when the actual response is less than the estimated response. Subsequent diversion phases are performed over a remainder of the current stage, based on the updated model.Type: GrantFiled: July 27, 2016Date of Patent: August 9, 2022Assignee: Halliburton Energy Services, Inc.Inventors: Chaitanya Mallikarjun Karale, Joshua Lane Camp
-
Patent number: 11379432Abstract: A device is configured to receive a reconstruction request that identifies a time instance value and an identifier for a portion of a document. The device is further configured to identify a time window between a current time value and the time instance value and to identify entries within a change history log within the time window that are associated with the identifier for the portion of the document. The device is further configured to generate a reconstructed document mapping by undoing the changes to the document mapping based on the identified entries within the change history log that are within the time window and that are associated with the identifier for the portion of the document. The device is configured to undo the changes that were performed by the identified entries in a reverse chronological order. The device is further configured to output the reconstructed document mapping.Type: GrantFiled: August 28, 2020Date of Patent: July 5, 2022Assignee: Bank of America CorporationInventors: Joshua A. Lane, Janet A. Caffray
-
Patent number: 11306572Abstract: Aspects of the subject technology relate to systems and methods for controlling a hydraulic fracturing job. A fracturing completion model can be applied to identify a plurality of possible fracturing completion plans for completing one or more wellbores at a target completion. The plurality of possible fracturing completion plans can include varying values of fracturing completion parameters and/or reservoir parameters. Completion characteristic data of the one or more wellbores can be gathered in response to application of at least a portion of a fracturing completion plan of the possible fracturing completion plans. Further, the completion characteristic data can be used to determine whether to apply a different fracturing completion plan of the possible fracturing completion plans. In turn, if it is determined to apply the different fracturing completion plan, then the method can include facilitating switching to the different fracturing completion plan in completing the one or more wellbores.Type: GrantFiled: June 11, 2020Date of Patent: April 19, 2022Assignee: HALLIBURTON ENERGY SERVICES, INC.Inventors: William Owen Alexander Ruhle, Ronald Glen Dusterhoft, Ajish Potty, Joshua Lane Camp
-
Publication number: 20220112796Abstract: A method of controlling a pumping sequence of a fracturing fleet at a wellsite while performing a fracturing job on a treatment wellbore penetrating a subterranean formation. A modeling application receives sensor data from the treatment wellbore and/or a monitoring wellbore, predicts a fracture propagation within the formation, and produces a pumping sequence to obtain the fracture propagation or a real-time update to the pumping sequence. The pumping can include two or more sub-stages, wherein the modeling application employs a first pumping routine model to provide a first sub-stage of the pumping sequence and employs a second pumping routine model to provide a second sub-stage of the pumping sequence. A managing application controls the fracturing fleet in accordance with the pumping sequence to place a fracturing fluid in the treatment well.Type: ApplicationFiled: October 9, 2020Publication date: April 14, 2022Inventors: Mikko JAASKELAINEN, Joshua Lane CAMP
-
Publication number: 20220113702Abstract: A method of controlling a pumping sequence of a fracturing fleet at a wellsite. A managing application executing on a computer in the control van can retrieve the pumping sequence from a local or remote storage computer. The managing application can establish an electronic communication link to receive sensor data from a plurality of fracturing units. The managing application can control the plurality of fracturing units with a stage script with multiple sequential instructions for a pumping stage of a pumping sequence while receiving one or more periodic data sets from the plurality of fracturing units wherein the data sets are indicative of the current state of the pumping stage of the pumping sequence.Type: ApplicationFiled: October 9, 2020Publication date: April 14, 2022Inventors: Mikko JAASKELAINEN, Joshua Lane CAMP, Ian Bradford MITCHELL