Patents by Inventor Joshua Lane Camp

Joshua Lane Camp has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11939864
    Abstract: Aspects of the subject technology relate to systems and methods for controlling a hydraulic fracturing job.
    Type: Grant
    Filed: October 6, 2020
    Date of Patent: March 26, 2024
    Assignee: HALLIBURTON ENERGY SERVICES, INC.
    Inventors: William Owen Alexander Ruhle, Ronald Glen Dusterhoft, Ajish Potty, Joshua Lane Camp
  • Patent number: 11934180
    Abstract: A method of controlling a pumping sequence of a fracturing fleet at a wellsite. A managing application executing on a computer in the control van can retrieve the pumping sequence from a local or remote storage computer. The managing application can establish an electronic communication link to receive sensor data from a plurality of fracturing units. The managing application can control the plurality of fracturing units with a stage script with multiple sequential instructions for a pumping stage of a pumping sequence while receiving one or more periodic data sets from the plurality of fracturing units wherein the data sets are indicative of the current state of the pumping stage of the pumping sequence.
    Type: Grant
    Filed: May 2, 2023
    Date of Patent: March 19, 2024
    Assignee: Halliburton Energy Services, Inc.
    Inventors: Mikko Jaaskelainen, Joshua Lane Camp, Ian Bradford Mitchell
  • Patent number: 11933161
    Abstract: A system and method to determine closure pressure in a wellbore that can include, flowing a fracturing fluid into the wellbore during a fracturing operation of at least one stage and forming a fracture, sensing fluid pressure and a flow rate of the fracturing fluid during the fracturing operation and communicating the sensed data to a controller, plotting data points of the sensed data to a visualization device which is configured to visually present the data points to an operator as a plot, fitting a curve to the data points which represent statistically-relevant minimum pressure data at various flow rates, determining an intercept of the first curve with a zero flow rate axis of the plot, determining the closure pressure based on a pressure value of the intercept, and determining an average fracture permeability based on the closure pressure.
    Type: Grant
    Filed: October 26, 2021
    Date of Patent: March 19, 2024
    Assignee: HALLIBURTON ENERGY SERVICES, INC.
    Inventors: Vladimir Nikolayevich Martysevich, Joshua Lane Camp, Tyler Austen Anderson, Srinath Madasu
  • Patent number: 11879317
    Abstract: System and methods of controlling fracture growth during multi-well stimulation treatments. The flow distribution of treatment fluid injected into first and second well formation entry points along multiple wellbores is monitored during a current stage of a multi-well, multistage stimulation treatment. Upon determining the fracture growth and/or monitored flow distribution meets a threshold, a remainder of the current stage is partitioned into a plurality of treatment cycles and at least one diversion phase. A portion of the fluid to be injected into the first well and/or second well formation entry points is allocated to each of the treatment cycles of the partitioned stage. The treatment cycles are performed for the remainder of the current stage using the treatment fluid allocated to each treatment cycle, wherein the flow distribution is adjusted so as not to meet the threshold.
    Type: Grant
    Filed: December 21, 2018
    Date of Patent: January 23, 2024
    Assignee: Halliburton Energy Services, Inc.
    Inventors: Timothy Holiman Hunter, Stanley Vernon Stephenson, Mikko Jaaskelainen, Ubong Akpan Inyang, Joshua Lane Camp, Tirumani N. Swaminathan
  • Publication number: 20230266747
    Abstract: A method of controlling a pumping sequence of a fracturing fleet at a wellsite. A managing application executing on a computer in the control van can retrieve the pumping sequence from a local or remote storage computer. The managing application can establish an electronic communication link to receive sensor data from a plurality of fracturing units. The managing application can control the plurality of fracturing units with a stage script with multiple sequential instructions for a pumping stage of a pumping sequence while receiving one or more periodic data sets from the plurality of fracturing units wherein the data sets are indicative of the current state of the pumping stage of the pumping sequence.
    Type: Application
    Filed: May 2, 2023
    Publication date: August 24, 2023
    Inventors: Mikko JAASKELAINEN, Joshua Lane CAMP, Ian Bradford MITCHELL
  • Patent number: 11675336
    Abstract: A method of controlling a pumping sequence of a fracturing fleet at a wellsite. A managing application executing on a computer in the control van can retrieve the pumping sequence from a local or remote storage computer. The managing application can establish an electronic communication link to receive sensor data from a plurality of fracturing units. The managing application can control the plurality of fracturing units with a stage script with multiple sequential instructions for a pumping stage of a pumping sequence while receiving one or more periodic data sets from the plurality of fracturing units wherein the data sets are indicative of the current state of the pumping stage of the pumping sequence.
    Type: Grant
    Filed: September 15, 2022
    Date of Patent: June 13, 2023
    Assignee: Halliburton Energy Services, Inc.
    Inventors: Mikko Jaaskelainen, Joshua Lane Camp, Ian Bradford Mitchell
  • Patent number: 11619115
    Abstract: System and methods of controlling fluid flow during reservoir stimulation treatments are provided. A flow distribution of treatment fluid injected into formation entry points along a wellbore path is monitored during a current stage of a multistage stimulation treatment. Upon determining that the monitored flow distribution meets a threshold, a remainder of the current stage is partitioned into a plurality of treatment cycles and at least one diversion phase for diverting the fluid to be injected away from one or more formation entry points between consecutive treatment cycles. A portion of the fluid to be injected into the formation entry points is allocated to each of the treatment cycles of the partitioned stage. The treatment cycles are performed for the remainder of the current stage using the treatment fluid allocated to each treatment cycle, wherein the flow distribution is adjusted so as not to meet the threshold.
    Type: Grant
    Filed: July 27, 2016
    Date of Patent: April 4, 2023
    Assignee: Halliburton Energy Services, Inc.
    Inventors: Joshua Lane Camp, Tyler Austen Anderson, Aaron Gene Russell, Srinath Madasu, Karan Dhuldhoya, Ubong Inyang
  • Publication number: 20230012783
    Abstract: A method of controlling a pumping sequence of a fracturing fleet at a wellsite. A managing application executing on a computer in the control van can retrieve the pumping sequence from a local or remote storage computer. The managing application can establish an electronic communication link to receive sensor data from a plurality of fracturing units. The managing application can control the plurality of fracturing units with a stage script with multiple sequential instructions for a pumping stage of a pumping sequence while receiving one or more periodic data sets from the plurality of fracturing units wherein the data sets are indicative of the current state of the pumping stage of the pumping sequence.
    Type: Application
    Filed: September 15, 2022
    Publication date: January 19, 2023
    Inventors: Mikko JAASKELAINEN, Joshua Lane CAMP, Ian Bradford MITCHELL
  • Patent number: 11513500
    Abstract: A method of controlling a pumping sequence of a fracturing fleet at a wellsite. A managing application executing on a computer in the control van can retrieve the pumping sequence from a local or remote storage computer. The managing application can establish an electronic communication link to receive sensor data from a plurality of fracturing units. The managing application can control the plurality of fracturing units with a stage script with multiple sequential instructions for a pumping stage of a pumping sequence while receiving one or more periodic data sets from the plurality of fracturing units wherein the data sets are indicative of the current state of the pumping stage of the pumping sequence.
    Type: Grant
    Filed: October 9, 2020
    Date of Patent: November 29, 2022
    Assignee: Halliburton Energy Services, Inc.
    Inventors: Mikko Jaaskelainen, Joshua Lane Camp, Ian Bradford Mitchell
  • Patent number: 11421528
    Abstract: Aspects of the subject technology relate to systems, methods, and computer-readable media for controlling a hydraulic fracturing job. Diagnostics data of a hydraulic fracturing completion of a wellbore can be received. A fracture formation model that models formation characteristics of fractures formed through the wellbore into a formation surrounding the wellbore during the hydraulic fracturing completion with respect to surface variables can be accessed. A subsurface objective function of fracture complexity can be selected from a plurality of subsurface objective functions for changing one or more of the formation characteristics of the fractures. The fracture formation model can be applied based on the diagnostics data to determine values of the surface variables for controlling the formation characteristics of the fractures to converge on the subsurface objective function of fracture complexity. As follows, a fracture completion plan can be formed based on the values of the surface variables.
    Type: Grant
    Filed: October 13, 2020
    Date of Patent: August 23, 2022
    Assignee: HALLIBURTON ENERGY SERVICES, INC.
    Inventors: William Owen Alexander Ruhle, Ronald Glen Dusterhoft, Ajish Potty, Joshua Lane Camp
  • Patent number: 11408259
    Abstract: System and methods of controlling diverter placement during stimulation treatments are provided. Data relating to at least one downhole parameter is obtained for a current treatment stage within a subsurface formation. A response of the diverter to be injected during a diversion phase of the current stage on the downhole parameter is estimated, based on the obtained data and a diagnostic data model. Values for diversion control parameters are calculated, based on the estimated response. As the diverter is injected into the formation, an actual response of the diverter is monitored. Upon determining that a difference between the actual and estimated response exceeds an error tolerance threshold, the model is updated. The model is further updated over subsequent iterations of the diversion phase when the actual response is less than the estimated response. Subsequent diversion phases are performed over a remainder of the current stage, based on the updated model.
    Type: Grant
    Filed: July 27, 2016
    Date of Patent: August 9, 2022
    Assignee: Halliburton Energy Services, Inc.
    Inventors: Chaitanya Mallikarjun Karale, Joshua Lane Camp
  • Patent number: 11306572
    Abstract: Aspects of the subject technology relate to systems and methods for controlling a hydraulic fracturing job. A fracturing completion model can be applied to identify a plurality of possible fracturing completion plans for completing one or more wellbores at a target completion. The plurality of possible fracturing completion plans can include varying values of fracturing completion parameters and/or reservoir parameters. Completion characteristic data of the one or more wellbores can be gathered in response to application of at least a portion of a fracturing completion plan of the possible fracturing completion plans. Further, the completion characteristic data can be used to determine whether to apply a different fracturing completion plan of the possible fracturing completion plans. In turn, if it is determined to apply the different fracturing completion plan, then the method can include facilitating switching to the different fracturing completion plan in completing the one or more wellbores.
    Type: Grant
    Filed: June 11, 2020
    Date of Patent: April 19, 2022
    Assignee: HALLIBURTON ENERGY SERVICES, INC.
    Inventors: William Owen Alexander Ruhle, Ronald Glen Dusterhoft, Ajish Potty, Joshua Lane Camp
  • Publication number: 20220112796
    Abstract: A method of controlling a pumping sequence of a fracturing fleet at a wellsite while performing a fracturing job on a treatment wellbore penetrating a subterranean formation. A modeling application receives sensor data from the treatment wellbore and/or a monitoring wellbore, predicts a fracture propagation within the formation, and produces a pumping sequence to obtain the fracture propagation or a real-time update to the pumping sequence. The pumping can include two or more sub-stages, wherein the modeling application employs a first pumping routine model to provide a first sub-stage of the pumping sequence and employs a second pumping routine model to provide a second sub-stage of the pumping sequence. A managing application controls the fracturing fleet in accordance with the pumping sequence to place a fracturing fluid in the treatment well.
    Type: Application
    Filed: October 9, 2020
    Publication date: April 14, 2022
    Inventors: Mikko JAASKELAINEN, Joshua Lane CAMP
  • Publication number: 20220113702
    Abstract: A method of controlling a pumping sequence of a fracturing fleet at a wellsite. A managing application executing on a computer in the control van can retrieve the pumping sequence from a local or remote storage computer. The managing application can establish an electronic communication link to receive sensor data from a plurality of fracturing units. The managing application can control the plurality of fracturing units with a stage script with multiple sequential instructions for a pumping stage of a pumping sequence while receiving one or more periodic data sets from the plurality of fracturing units wherein the data sets are indicative of the current state of the pumping stage of the pumping sequence.
    Type: Application
    Filed: October 9, 2020
    Publication date: April 14, 2022
    Inventors: Mikko JAASKELAINEN, Joshua Lane CAMP, Ian Bradford MITCHELL
  • Publication number: 20220042411
    Abstract: A system and method to determine closure pressure in a wellbore that can include, flowing a fracturing fluid into the wellbore during a fracturing operation of at least one stage and forming a fracture, sensing fluid pressure and a flow rate of the fracturing fluid during the fracturing operation and communicating the sensed data to a controller, plotting data points of the sensed data to a visualization device which is configured to visually present the data points to an operator as a plot, fitting a curve to the data points which represent statistically-relevant minimum pressure data at various flow rates, determining an intercept of the first curve with a zero flow rate axis of the plot, determining the closure pressure based on a pressure value of the intercept, and determining an average fracture permeability based on the closure pressure.
    Type: Application
    Filed: October 26, 2021
    Publication date: February 10, 2022
    Inventors: Vladimir N. Martysevich, Joshua Lane Camp, Tyler Austen Anderson, Srinath Madasu
  • Patent number: 11199068
    Abstract: A flow distribution may be monitored to one or more clusters of perforations. Plugging criteria may be identified based on the flow distribution and characteristics associated with perforation plugs to be dropped into a wellbore associated with the subsurface formation may be determined based on the flow distribution, characteristics of the one or more clusters, and the plugging objective. The perforation plugs may be dropped into the wellbore. The perforation plugs may have tracers which indicate whether the perforation plugs reached a location associated with the one or more clusters.
    Type: Grant
    Filed: December 13, 2017
    Date of Patent: December 14, 2021
    Assignee: Halliburton Energy Services, Inc.
    Inventors: Ubong Inyang, Joshua Lane Camp, Tyler Austen Anderson, Jim Basuki Surjaatmadja
  • Patent number: 11187074
    Abstract: A system and method to determine closure pressure in a wellbore that can include, flowing a fracturing fluid into the wellbore during a fracturing operation of at least one stage and forming a fracture, sensing fluid pressure and a flow rate of the fracturing fluid during the fracturing operation and communicating the sensed data to a controller, plotting data points of the sensed data to a visualization device which is configured to visually present the data points to an operator as a plot, fitting a curve to the data points which represent statistically-relevant minimum pressure data at various flow rates, determining an intercept of the first curve with a zero flow rate axis of the plot, determining the closure pressure based on a pressure value of the intercept, and determining an average fracture permeability based on the closure pressure.
    Type: Grant
    Filed: January 13, 2017
    Date of Patent: November 30, 2021
    Assignee: Halliburton Energy Services, Inc.
    Inventors: Vladimir Nikolayevich Martysevich, Joshua Lane Camp, Tyler Austen Anderson, Srinath Madasu
  • Patent number: 11162346
    Abstract: A first flow distribution to one or more entry points into a subsurface formation may be monitored. Stimulation criteria may be identified based on the first flow distribution. At least one characteristic associated with a first treatment fluid to be injected into a wellbore associated with the subsurface formation may be determined based on the first flow distribution, where the at least one characteristic is based on the stimulation criteria. The subsurface formation may be stimulated with the first treatment fluid and a second flow distribution monitored based on the stimulation. A determination is made whether the second flow distribution meets the stimulation criteria. The subsurface formation may be stimulated with a second treatment fluid based on the determination that the second flow distribution does not meet the stimulation criteria.
    Type: Grant
    Filed: December 13, 2017
    Date of Patent: November 2, 2021
    Assignee: Halliburton Energy Services, Inc.
    Inventors: Janette Cortez Montalvo, Ubong Inyang, Joshua Lane Camp, Tyler Austen Anderson, Jim Basuki Surjaatmadja
  • Publication number: 20210332683
    Abstract: System and methods of controlling fracture growth during multi-well stimulation treatments. The flow distribution of treatment fluid injected into first and second well formation entry points along multiple wellbores is monitored during a current stage of a multi-well, multistage stimulation treatment. Upon determining the fracture growth and/or monitored flow distribution meets a threshold, a remainder of the current stage is partitioned into a plurality of treatment cycles and at least one diversion phase. A portion of the fluid to be injected into the first well and/or second well formation entry points is allocated to each of the treatment cycles of the partitioned stage. The treatment cycles are performed for the remainder of the current stage using the treatment fluid allocated to each treatment cycle, wherein the flow distribution is adjusted so as not to meet the threshold.
    Type: Application
    Filed: December 21, 2018
    Publication date: October 28, 2021
    Inventors: Timothy Holiman Hunter, Stanley Vemon Stephen, Mikko Jaaskelainen, Ubong Akpan Inyang, Joshua Lane Camp, Tirumani N. Swaminathan
  • Patent number: 11143005
    Abstract: The systems and methods described herein are be used in controlling an injection treatment. An electric pump is used to provide variable modulation of the flow rate of a treatment fluid. Modulating the flow rate in real-time provides pressure diagnostics that can be used to improve fracture growth parameters, wellbore conditions, and well performance. A method of stimulating a wellbore, comprises of injecting, by an electric pump, one or more fluids downhole into the wellbore; producing, based on the one or more injected fluids, one or more fractures that extend from the wellbore into a subterranean formation; receiving, by one or more sensors, one or more measurements; modulating an injection flow rate of the one or more injected fluids; evaluating fracture growth parameters of the one or more fractures; and adjusting fracture complexity of the one or more fractures based on the evaluation of the fracture growth parameters.
    Type: Grant
    Filed: July 29, 2019
    Date of Patent: October 12, 2021
    Assignee: Halliburton Energy Services, Inc.
    Inventors: Ronald Glen Dusterhoft, Stanley V. Stephenson, Timothy Holiman Hunter, Joshua Lane Camp