Patents by Inventor Kainan HUANG

Kainan HUANG has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Publication number: 20240118150
    Abstract: The present disclosure provides a method for testing an internal force increment of an arch bridge suspender by inertial measurement, including the following steps: (1) selecting a suspender to be tested with internal force increment, and mounting an acceleration sensing device or a speed sensing device at a lower edge of the suspender to be tested; (2) setting an appropriate sampling frequency and collecting signals; (3) processing information data collected in step (2) by using Formulas; and (4) recording a result of the information data processing and obtaining the internal force increment of the suspender. The method can obtain the internal force increment of the suspender by collecting acceleration or speed signals of the lower edge of the suspender and performing calculation from the signals. This method has the advantages of simple and convenient testing, high replicability and low test cost.
    Type: Application
    Filed: October 8, 2021
    Publication date: April 11, 2024
    Inventors: Hua Wang, Longlin Wang, Tianzhi Hao, Zehua Xie, Mengsheng Yu, Xiaoli Zhuo, Yuhou Yang, Jiejun Ning, Xirui Wang, Xi Peng, Kainan Huang, Junhong Wu
  • Publication number: 20240003104
    Abstract: A fabricated rapid construction platform for a bridge, wherein the construction platform comprises a fixing frame, an upper-layer tubular pile position control structure (6), a lower-layer tubular pile position control structure (7), and a console; the fixing frame comprises a bottom rail platform (1), supporting posts (3), a top operation platform (2), and several supporting legs (4); the upper-layer tubular pile position control structure (6) and the lower-layer tubular pile position control structure (7) are provided between the bottom rail platform (1) and the top operation platform (2); the upper-layer tubular pile position control structure (6) comprises two sub-structures arranged symmetrically about the central axis of a second through hole, and each sub-structure comprises a braking device (61), a vertical control arm (63), and a horizontal control arm (62).
    Type: Application
    Filed: October 9, 2021
    Publication date: January 4, 2024
    Applicant: GUANGXI TRANSPORTATION SCIENCE AND TECHNOLOGY GROUP CO., LTD
    Inventors: Hua WANG, Longlin WANG, Xirui WANG, Tianzhi HAO, Gangrong WEI, Litao LI, Bo QIU, Jizhi LUO, Yuhou YANG, Shijian LIU, Mengsheng YU, Xiaoli ZHUO, Kainan HUANG, Jianheng CHEN, Zengke LI, Jipeng CHEN