Patents by Inventor Keita SHOUJI
Keita SHOUJI has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).
-
Patent number: 11899476Abstract: A gas flow measuring method is provided. A first pressure of a gas in a first and a second flow path is measured. A gas is supplied to the first and the second flow paths by repeating gas supply and stop of the gas supply, and a gas supply time is measured. A second pressure and a temperature of the gas in the first and the second flow path is measured, a third pressure of the gas in the second flow path is measured after the gas is exhausted from the second flow path, and a fourth pressure of the gas in the first and the second flow path is measured. The gas flow supplied to the first and the second flow path is calculated based on the first to fourth pressures and the temperature, and corrected based on a theoretical gas supply time and a calculated average time.Type: GrantFiled: February 16, 2021Date of Patent: February 13, 2024Assignee: TOKYO ELECTRON LIMITEDInventors: Risako Matsuda, Shinichiro Hayasaka, Manabu Oie, Keita Shouji
-
Patent number: 11742228Abstract: A substrate processing method of processing a substrate using a gas supplied to a chamber includes: (a) setting a threshold value of a pressure of the gas, which is a control target in a flow rate controller configured to measure the pressure of the gas supplied to the chamber and control a flow rate of the gas; (b) supplying the gas into the chamber; (c) measuring the pressure of the gas by the flow rate controller; (d) stopping the supply of the gas into of the chamber; (e) calculating a time when the pressure of the gas measured in (c) becomes equal to or higher than the threshold value; and (f) calculating a total flow rate of the gas supplied into the chamber based on the pressure of the gas measured in (c) and the time calculated in (e).Type: GrantFiled: March 2, 2021Date of Patent: August 29, 2023Assignee: TOKYO ELECTRON LIMITEDInventors: Risako Matsuda, Shinobu Kinoshita, Manabu Oie, Keita Shouji
-
Patent number: 11585717Abstract: In a substrate processing system according to an exemplary embodiment, gas supply units are configured to supply gases to chambers through first gas flow channels thereof, respectively. Chamber pressure sensors are configured to measure pressures in the chambers. A second gas flow channel is connected to the first gas flow channel of each of the gas supply units. A reference pressure sensor is configured to measure a pressure in the second gas flow channel. In a method according to an exemplary embodiment, each of the chamber pressure sensors is calibrated by using a measurement value thereof and a measurement value of the reference pressure sensor which are obtained in a state where pressures in a corresponding chamber, the first gas flow channel of a corresponding gas supply unit, and the second gas flow channel are maintained.Type: GrantFiled: March 2, 2020Date of Patent: February 21, 2023Assignee: Tokyo Electron LimitedInventors: Risako Matsuda, Norihiko Amikura, Kazuyuki Miura, Keita Shouji
-
Publication number: 20230034399Abstract: A substrate processing system includes a chamber group including chambers configured to process a substrate in a desired process gas, a gas box group including gas boxes configured to supply the process gas to each of the chambers, a flow rate measuring device configured to measure a flow rate of the process gas supplied from the gas box group, and an exhaust device connected to the chamber group and the flow rate measuring device. The flow rate measuring device includes a measuring instrument and a measurement pipe connected to the gas box group and the measuring instrument and configured to flow the process gas through the gas box group and the measuring instrument. The measurement pipe includes branch pipes connected to each of the gas boxes, a main pipe connected to each of the branch pipes and the measuring instrument, and branch pipe valves provided in the branch pipes.Type: ApplicationFiled: July 26, 2022Publication date: February 2, 2023Inventors: Risako MATSUDA, Keita SHOUJI, Kazuaki TAKAAI
-
Patent number: 11555755Abstract: There is provided a method of calibrating multiple chamber pressure sensors of a substrate processing system. The substrate processing system includes: multiple chambers; multiple chamber pressure sensors; multiple gas suppliers configured to supply a gas to an internal space of the multiple chambers; multiple exhausters connected to the internal spaces of the multiple chambers via multiple exhaust flow paths; and multiple first gas flow paths. The method includes: acquiring a third volume, which is a sum of a first volume and a second volume; acquiring a first pressure change rate of the internal space of a selected chamber; calculating a second pressure change rate of the internal space of the selected chamber; and calibrating the selected chamber pressure sensor such that a difference between the first pressure change rate and the second pressure change rate is within a preset range.Type: GrantFiled: March 9, 2021Date of Patent: January 17, 2023Assignee: TOKYO ELECTRON LIMITEDInventors: Risako Matsuda, Keita Shouji
-
Publication number: 20210302257Abstract: There is provided a method of calibrating multiple chamber pressure sensors of a substrate processing system. The substrate processing system includes: multiple chambers; multiple chamber pressure sensors; multiple gas suppliers configured to supply a gas to an internal space of the multiple chambers; multiple exhausters connected to the internal spaces of the multiple chambers via multiple exhaust flow paths; and multiple first gas flow paths. The method includes: acquiring a third volume, which is a sum of a first volume and a second volume; acquiring a first pressure change rate of the internal space of a selected chamber; calculating a second pressure change rate of the internal space of the selected chamber; and calibrating the selected chamber pressure sensor such that a difference between the first pressure change rate and the second pressure change rate is within a preset range.Type: ApplicationFiled: March 9, 2021Publication date: September 30, 2021Inventors: Risako MATSUDA, Keita SHOUJI
-
Publication number: 20210287922Abstract: A substrate processing method of processing a substrate using a gas supplied to a chamber includes: (a) setting a threshold value of a pressure of the gas, which is a control target in a flow rate controller configured to measure the pressure of the gas supplied to the chamber and control a flow rate of the gas; (b) supplying the gas into the chamber; (c) measuring the pressure of the gas by the flow rate controller; (d) stopping the supply of the gas into of the chamber; (e) calculating a time when the pressure of the gas measured in (c) becomes equal to or higher than the threshold value; and (f) calculating a total flow rate of the gas supplied into the chamber based on the pressure of the gas measured in (c) and the time calculated in (e).Type: ApplicationFiled: March 2, 2021Publication date: September 16, 2021Inventors: Risako MATSUDA, Shinobu KINOSHITA, Manabu OIE, Keita SHOUJI
-
Publication number: 20210263540Abstract: A gas flow measuring method is provided. A first pressure of a gas in a first and a second flow path is measured. A gas is supplied to the first and the second flow paths by repeating gas supply and stop of the gas supply, and a gas supply time is measured. A second pressure and a temperature of the gas in the first and the second flow path is measured, a third pressure of the gas in the second flow path is measured after the gas is exhausted from the second flow path, and a fourth pressure of the gas in the first and the second flow path is measured. The gas flow supplied to the first and the second flow path is calculated based on the first to fourth pressures and the temperature, and corrected based on a theoretical gas supply time and a calculated average time.Type: ApplicationFiled: February 16, 2021Publication date: August 26, 2021Applicant: TOKYO ELECTRON LIMITEDInventors: Risako Matsuda, Shinichiro Hayasaka, Manabu Oie, Keita Shouji
-
Publication number: 20200292403Abstract: In a substrate processing system according to an exemplary embodiment, gas supply units are configured to supply gases to chambers through first gas flow channels thereof, respectively. Chamber pressure sensors are configured to measure pressures in the chambers. A second gas flow channel is connected to the first gas flow channel of each of the gas supply units. A reference pressure sensor is configured to measure a pressure in the second gas flow channel. In a method according to an exemplary embodiment, each of the chamber pressure sensors is calibrated by using a measurement value thereof and a measurement value of the reference pressure sensor which are obtained in a state where pressures in a corresponding chamber, the first gas flow channel of a corresponding gas supply unit, and the second gas flow channel are maintained.Type: ApplicationFiled: March 2, 2020Publication date: September 17, 2020Applicant: Tokyo Electron LimitedInventors: Risako MATSUDA, Norihiko AMIKURA, Kazuyuki MIURA, Keita SHOUJI