Patents by Inventor Klara BERG

Klara BERG has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11655736
    Abstract: A CCPP includes a gas turbine, a HRSG, a steam turbine a flash tank and first and second supply lines. The gas turbine, the HRSG and the steam turbine are interconnected to generate power. The gas turbine may include an air preheating system to preheat the air supplied in the gas turbine to enable expedite combustion therein. The flash tank is fluidically connected at a cold end of the HRSG to extract waste hot water from the cold end. Further, the first supply line is configured to interconnect the flash tank and the steam turbine to supply of flash steam to the steam turbine. Furthermore, the second supply line is configured to interconnect the flash tank and the air preheating system to supply hot flash condensate thereto.
    Type: Grant
    Filed: February 8, 2021
    Date of Patent: May 23, 2023
    Assignee: GENERAL ELECTRIC TECHNOLOGY GMBH
    Inventors: Klara Berg, Mariah Couzzi-Carneiro, Paul Drouvot, Torbjörn Stenström
  • Publication number: 20210180473
    Abstract: A CCPP includes a gas turbine, a HRSG, a steam turbine a flash tank and first and second supply lines. The gas turbine, the HRSG and the steam turbine are interconnected to generate power. The gas turbine may include an air preheating system to preheat the air supplied in the gas turbine to enable expedite combustion therein. The flash tank is fluidically connected at a cold end of the HRSG to extract waste hot water from the cold end. Further, the first supply line is configured to interconnect the flash tank and the steam turbine to supply of flash steam to the steam turbine. Furthermore, the second supply line is configured to interconnect the flash tank and the air preheating system to supply hot flash condensate thereto.
    Type: Application
    Filed: February 8, 2021
    Publication date: June 17, 2021
    Inventors: Klara Berg, Mariah Couzzi-Carneiro, Paul Drouvot, Torbjörn Stenström
  • Patent number: 10914200
    Abstract: A CCPP includes a gas turbine, a HRSG, a steam turbine a flash tank and first and second supply lines. The gas turbine, the HRSG and the steam turbine are interconnected to generate power. The gas turbine may include an air preheating system to preheat the air supplied in the gas turbine to enable expedite combustion therein. The flash tank is fluidically connected at a cold end of the HRSG to extract waste hot water from the cold end. Further, the first supply line is configured to interconnect the flash tank and the steam turbine to supply of flash steam to the steam turbine. Furthermore, the second supply line is configured to interconnect the flash tank and the air preheating system to supply hot flash condensate thereto.
    Type: Grant
    Filed: October 24, 2014
    Date of Patent: February 9, 2021
    Assignee: GENERAL ELECTRIC TECHNOLOGY GMBH
    Inventors: Klara Berg, Mariah Couzzi-Carneiro, Paul Drouvot, Torbjörn Stenström
  • Patent number: 10865710
    Abstract: A method of operating a turbine unit, wherein recirculated exhaust gas is contacted with a cooling and absorption liquid in a packed bed. An exhaust gas treatment system for a turbine unit, wherein an exhaust gas recirculation line comprises a gas cooling and cleaning device having a packed bed for contacting the exhaust gas with a cooling and absorption liquid. A combined cycle power generating system, wherein an exhaust gas recirculation line comprises a gas cooling and cleaning device having a packed bed for contacting the exhaust gas from a gas turbine with a cooling and absorption liquid and wherein water utilized as a cooling medium for condensation of steam originating from a steam turbine, and the cooling and absorption liquid, are passed to a cooling tower.
    Type: Grant
    Filed: September 4, 2014
    Date of Patent: December 15, 2020
    Assignee: GENERAL ELECTRIC TECHNOLOGY GMBH
    Inventors: Wuyin Wang, Richard Joel Curran, Frank Sander, Klara Berg, Richard Carroni, Gian Luigi Agostinelli
  • Patent number: 10393369
    Abstract: A preheating system for preheating fluid medium to be fed into the HRSG is disclosed. The system includes a feed line and a recirculation line. The feed line is adapted to feed the fluid medium to a Low Pressure Economizer (LPE) of the HRSG. The feed line is adapted to be adjoined to an inlet of the LPE, and an outlet of the LPE enables therefrom the flow of the fluid medium in further portion of the HRSG. The recirculation line is adapted to be connected between the outlet and the inlet of the LPE, in parallel to LPE to recirculate the fluid medium to the LPE. A particular method of preheating using such a system is equally disclosed.
    Type: Grant
    Filed: March 27, 2015
    Date of Patent: August 27, 2019
    Assignee: General Electric Company
    Inventors: Paul Drouvot, Torbjorn Stenstrom, Klara Berg
  • Patent number: 10006313
    Abstract: The invention refers to a CCPP comprising a gas turbine, a water steam cycle with a steam turbine and a HRSG with at least two pressure levels, and a fuel preheater for preheating the fuel of the gas turbine. The fuel preheater includes a first heat exchanger for preheating the fuel to a first elevated temperature, which is connected to a feed water line from a pressure level of the HRSG, which is below the highest HRSG pressure level, and a second heat exchanger for further preheating the fuel gas to a second elevated temperature, which is connected to the high pressure feed water with the highest pressure level of the HRSG. The disclosure further refers to a method for operating a CCPP with such a fuel preheater.
    Type: Grant
    Filed: June 27, 2014
    Date of Patent: June 26, 2018
    Assignee: GENERAL ELECTRIC TECHNOLOGY GMBH
    Inventors: Paul Drouvot, François Droux, Klara Berg
  • Publication number: 20170074504
    Abstract: A preheating system for preheating fluid medium to be fed into the HRSG is disclosed. The system includes a feed line and a recirculation line. The feed line is adapted to feed the fluid medium to a Low Pressure Economizer (LPE) of the HRSG. The feed line is adapted to be adjoined to an inlet of the LPE, and an outlet of the LPE enables therefrom the flow of the fluid medium in further portion of the HRSG. The recirculation line is adapted to be connected between the outlet and the inlet of the LPE, in parallel to LPE to recirculate the fluid medium to the LPE. A particular method of preheating using such a system is equally disclosed.
    Type: Application
    Filed: March 27, 2015
    Publication date: March 16, 2017
    Inventors: Paul DROUVOT, Torbjorn STENSTROM, Klara BERG
  • Publication number: 20150113939
    Abstract: A CCPP includes a gas turbine, a HRSG, a steam turbine a flash tank and first and second supply lines. The gas turbine, the HRSG and the steam turbine are interconnected to generate power. The gas turbine may include an air preheating system to preheat the air supplied in the gas turbine to enable expedite combustion therein. The flash tank is fluidically connected at a cold end of the HRSG to extract waste hot water from the cold end. Further, the first supply line is configured to interconnect the flash tank and the steam turbine to supply of flash steam to the steam turbine. Furthermore, the second supply line is configured to interconnect the flash tank and the air preheating system to supply hot flash condensate thereto.
    Type: Application
    Filed: October 24, 2014
    Publication date: April 30, 2015
    Inventors: Klara BERG, Mariah Couzzi-Carneiro, Paul Drouvot, Torbjörn Stenström
  • Publication number: 20150007575
    Abstract: The invention refers to a CCPP comprising a gas turbine, a water steam cycle with a steam turbine and a HRSG with at least two pressure levels, and a fuel preheater for preheating the fuel of the gas turbine. The fuel preheater includes a first heat exchanger for preheating the fuel to a first elevated temperature, which is connected to a feed water line from a pressure level of the HRSG, which is below the highest HRSG pressure level, and a second heat exchanger for further preheating the fuel gas to a second elevated temperature, which is connected to the high pressure feed water with the highest pressure level of the HRSG. The disclosure further refers to a method for operating a CCPP with such a fuel preheater.
    Type: Application
    Filed: June 27, 2014
    Publication date: January 8, 2015
    Inventors: Paul Drouvot, François Droux, Klara Berg
  • Publication number: 20140366549
    Abstract: A method of operating a turbine unit, wherein recirculated exhaust gas is contacted with a cooling and absorption liquid in a packed bed. An exhaust gas treatment system for a turbine unit, wherein an exhaust gas recirculation line comprises a gas cooling and cleaning device having a packed bed for contacting the exhaust gas with a cooling and absorption liquid. A combined cycle power generating system, wherein an exhaust gas recirculation line comprises a gas cooling and cleaning device having a packed bed for contacting the exhaust gas from a gas turbine with a cooling and absorption liquid and wherein water utilized as a cooling medium for condensation of steam originating from a steam turbine, and the cooling and absorption liquid, are passed to a cooling tower.
    Type: Application
    Filed: September 4, 2014
    Publication date: December 18, 2014
    Inventors: Wuyin WANG, Richard Joel CURRAN, Frank SANDER, Klara BERG, Richard CARRONI, Gian Luigi AGOSTINELLI
  • Publication number: 20140250900
    Abstract: The invention relates to a gas turbine power plant, having a gas turbine, a waste heat steam generator following the gas turbine, an exhaust gas recooler, an exhaust gas blower, a carbon dioxide separation plant which separates the carbon dioxide contained in the exhaust gases from these and discharges it to a carbon dioxide outlet. A bypass chimney is arranged in the gas turbine power plant between the outlet of the waste heat steam generator and the exhaust gas blower and is connected to a fail-safe open connection both in the throughflow direction from the exhaust gas line to the bypass chimney and in the throughflow direction from the bypass chimney to the exhaust gas line. The invention relates, further, to a method for operating a gas turbine power plant of this type, in which the exhaust gas blower is regulated.
    Type: Application
    Filed: May 20, 2014
    Publication date: September 11, 2014
    Inventors: Richard CARRONI, Alexander ZAGORSKIY, Klara BERG, Sergey KHAYDAROV, Marcel RIEKER