Patents by Inventor Koray Dogan

Koray Dogan has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 10748096
    Abstract: Determining an inventory target for a node of a supply chain includes calculating a demand stock for satisfying a demand over supply lead time at the node of the supply chain, and calculating a demand variability stock for satisfying a demand variability of the demand over supply lead time at the node. A demand bias of the demand at the node is established. An inventory target for the node is determined based on the demand stock and the demand variability stock in accordance with the demand bias.
    Type: Grant
    Filed: January 9, 2018
    Date of Patent: August 18, 2020
    Assignee: Blue Yonder Group, Inc.
    Inventors: Koray Dogan, Adeel Najmi, Mehdi Sheikhzadeh, Ramesh Raman
  • Publication number: 20180130000
    Abstract: Determining an inventory target for a node of a supply chain includes calculating a demand stock for satisfying a demand over supply lead time at the node of the supply chain, and calculating a demand variability stock for satisfying a demand variability of the demand over supply lead time at the node. A demand bias of the demand at the node is established. An inventory target for the node is determined based on the demand stock and the demand variability stock in accordance with the demand bias.
    Type: Application
    Filed: January 9, 2018
    Publication date: May 10, 2018
    Inventors: Koray Dogan, Adeel Najmi, Mehdi Sheikhzadeh, Ramesh Raman
  • Patent number: 9870544
    Abstract: Determining an inventory target for a node of a supply chain includes calculating a demand stock for satisfying a demand over supply lead time at the node of the supply chain, and calculating a demand variability stock for satisfying a demand variability of the demand over supply lead time at the node. A demand bias of the demand at the node is established. An inventory target for the node is determined based on the demand stock and the demand variability stock in accordance with the demand bias.
    Type: Grant
    Filed: July 14, 2014
    Date of Patent: January 16, 2018
    Assignee: JDA Software Group, Inc.
    Inventors: Koray Dogan, Adeel Najmi, Mehdi Sheikhzadeh, Ramesh Raman
  • Publication number: 20150134397
    Abstract: Determining an inventory target for a node of a supply chain includes calculating a demand stock for satisfying a demand over supply lead time at the node of the supply chain, and calculating a demand variability stock for satisfying a demand variability of the demand over supply lead time at the node. A demand bias of the demand at the node is established. An inventory target for the node is determined based on the demand stock and the demand variability stock in accordance with the demand bias.
    Type: Application
    Filed: July 14, 2014
    Publication date: May 14, 2015
    Inventors: Koray Dogan, Adeel Najmi, Mehdi Sheikhzadeh, Ramesh Raman
  • Patent number: 8781868
    Abstract: Determining an inventory target for a node of a supply chain includes calculating a demand stock for satisfying a demand over supply lead time at the node of the supply chain, and calculating a demand variability stock for satisfying a demand variability of the demand over supply lead time at the node. A demand bias of the demand at the node is established. An inventory target for the node is determined based on the demand stock and the demand variability stock in accordance with the demand bias.
    Type: Grant
    Filed: May 27, 2013
    Date of Patent: July 15, 2014
    Assignee: JDA Software Group, Inc.
    Inventors: Koray Dogan, Adeel Najmi, Mehdi Sheikhzadeh, Ramesh Raman
  • Publication number: 20130262177
    Abstract: Determining an inventory target for a node of a supply chain includes calculating a demand stock for satisfying a demand over supply lead time at the node of the supply chain, and calculating a demand variability stock for satisfying a demand variability of the demand over supply lead time at the node. A demand bias of the demand at the node is established. An inventory target for the node is determined based on the demand stock and the demand variability stock in accordance with the demand bias.
    Type: Application
    Filed: May 27, 2013
    Publication date: October 3, 2013
    Applicant: JDA Software Group, Inc.
    Inventors: Koray Dogan, Adeel Najmi, Mehdi Sheikhzadeh, Ramesh Raman
  • Patent number: 8452627
    Abstract: Determining an inventory target for a node of a supply chain includes calculating a demand stock for satisfying a demand over supply lead time at the node of the supply chain, and calculating a demand variability stock for satisfying a demand variability of the demand over supply lead time at the node. A demand bias of the demand at the node is established. An inventory target for the node is determined based on the demand stock and the demand variability stock in accordance with the demand bias.
    Type: Grant
    Filed: June 18, 2011
    Date of Patent: May 28, 2013
    Assignee: JDA Software Group, Inc.
    Inventors: Koray Dogan, Adeel Najmi, Mehdi Sheikhzadeh, Ramesh Raman
  • Publication number: 20120158457
    Abstract: Determining an inventory target for a node of a supply chain includes calculating a demand stock for satisfying a demand over supply lead time at the node of the supply chain, and calculating a demand variability stock for satisfying a demand variability of the demand over supply lead time at the node. A demand bias of the demand at the node is established. An inventory target for the node is determined based on the demand stock and the demand variability stock in accordance with the demand bias.
    Type: Application
    Filed: June 18, 2011
    Publication date: June 21, 2012
    Inventors: Koray Dogan, Adeel Najmi, Mehdi Sheikhzadeh, Ramesh Raman
  • Patent number: 7966211
    Abstract: Determining an inventory target for a node of a supply chain includes calculating a demand stock for satisfying a demand over supply lead time at the node of the supply chain, and calculating a demand variability stock for satisfying a demand variability of the demand over supply lead time at the node. A demand bias of the demand at the node is established. An inventory target for the node is determined based on the demand stock and the demand variability stock in accordance with the demand bias.
    Type: Grant
    Filed: April 29, 2004
    Date of Patent: June 21, 2011
    Assignee: i2 Technologies US, Inc.
    Inventors: Koray Dogan, Adeel Najmi, Mehdi Sheikhzadeh, Ramesh Raman
  • Patent number: 7941331
    Abstract: In one embodiment, determining order lead time for a supply chain includes generating probability distribution for expected order lead time options, where each probability distribution for expected order lead time option is associated with a category. A category that corresponds to a supply chain is identified. The supply chain has nodes, including a starting node and an ending node that supplies a customer, and designates a path from the starting node to the ending node. A probability distribution for expected order lead time option associated with the identified category is selected as a probability distribution for expected order lead time for the supply chain. The probability distribution for expected order lead time describes ending node demand for the ending node versus order lead time.
    Type: Grant
    Filed: April 29, 2004
    Date of Patent: May 10, 2011
    Assignee: i2 Technologies US, Inc.
    Inventors: Koray Dogan, Adeel Najmi, Ramesh Raman
  • Patent number: 7853462
    Abstract: Optimizing inventory targets for nodes of a supply chain to satisfy a target customer service level may include accessing a supply chain model that has an assumed value for each of a number of inputs. An optimized inventory target is calculated according to the supply chain model to satisfy the target customer service level, and a measured actual customer service level and a measured actual value for each input are accessed. If the measured actual customer service level fails to satisfy the target customer service level, deviations between the measured actual and assumed values for each input are determined. An input for which the deviation is significant is identified to be a root cause of the failure. For a subsequent time period, using the deviation for the identified input as feedback, the assumed value for the identified input is adjusted, and a reoptimized inventory target is calculated to satisfy the target customer service level.
    Type: Grant
    Filed: April 29, 2004
    Date of Patent: December 14, 2010
    Assignee: i2 Technologies US, Inc.
    Inventors: Koray Dogan, Adeel Najmi, Ramesh Raman
  • Patent number: 7827049
    Abstract: In one embodiment, estimating demand for a supply chain includes accessing a probability distribution for expected order lead time of the supply chain. The supply chain has nodes including a starting node and an ending node and a path from the starting node to the ending node. The probability distribution for expected order lead time describes ending node demand for the ending node versus order lead time. The path is divided into order lead time segments, and the order lead time segments are associated with the probability distribution for expected order lead time by associating each order lead home segment with a corresponding order lead time range of the probability distribution for expected order lead time. A demand percentage is estimated for each order lead time segment in accordance with the probability distribution for expected order lead time in order to estimate demand for the supply chain.
    Type: Grant
    Filed: April 29, 2004
    Date of Patent: November 2, 2010
    Assignee: i2 Technologies US, Inc.
    Inventors: Koray Dogan, Adeel Najmi, Ramesh Raman
  • Patent number: 7761903
    Abstract: Determining a policy parameter for an entity of a supply chain includes establishing attributes of the entities of the supply chain. Attribute segments are established for each attribute, where an attribute segment includes one or more values of the corresponding attribute. Rules are formulated using the attribute segments to define policy groups, and policy parameters are assigned to each policy group. A policy group corresponding to an entity is identified in accordance with the rules. The policy parameters assigned to the identified policy group are determined and selected for the entity.
    Type: Grant
    Filed: March 13, 2009
    Date of Patent: July 20, 2010
    Assignee: i2 Technologies US, Inc.
    Inventors: Koray Dogan, Adeel Najmi, Ramesh Raman, Praveen Upadhyay
  • Publication number: 20090177512
    Abstract: Determining a policy parameter for an entity of a supply chain includes establishing attributes of the entities of the supply chain. Attribute segments are established for each attribute, where an attribute segment includes one or more values of the corresponding attribute. Rules are formulated using the attribute segments to define policy groups, and policy parameters are assigned to each policy group. A policy group corresponding to an entity is identified in accordance with the rules. The policy parameters assigned to the identified policy group are determined and selected for the entity.
    Type: Application
    Filed: March 13, 2009
    Publication date: July 9, 2009
    Applicant: I2 TECHNOLOGIES US, INC.
    Inventors: Koray Dogan, Adeel Najmi, Ramesh Raman, Praveen Upadhyay
  • Patent number: 7523483
    Abstract: Determining a policy parameter for an entity of a supply chain includes establishing attributes of the entities of the supply chain. Attribute segments are established for each attribute, where an attribute segment includes one or more values of the corresponding attribute. Rules are formulated using the attribute segments to define policy groups, and policy parameters are assigned to each policy group. A policy group corresponding to an entity is identified in accordance with the rules. The policy parameters assigned to the identified policy group are determined and selected for the entity.
    Type: Grant
    Filed: April 29, 2004
    Date of Patent: April 21, 2009
    Assignee: i2 Technologies US, Inc.
    Inventors: Koray Dogan, Adeel Najmi, Ramesh Raman, Praveen Upadhyay
  • Publication number: 20040243460
    Abstract: Determining an inventory target for a node of a supply chain includes calculating a demand stock for satisfying a demand over supply lead time at the node of the supply chain, and calculating a demand variability stock for satisfying a demand variability of the demand over supply lead time at the node. A demand bias of the demand at the node is established. An inventory target for the node is determined based on the demand stock and the demand variability stock in accordance with the demand bias.
    Type: Application
    Filed: April 29, 2004
    Publication date: December 2, 2004
    Applicant: i2 Technologies US, Inc.
    Inventors: Koray Dogan, Adeel Najmi, Mehdi Sheikhzadeh, Ramesh Raman
  • Publication number: 20040230475
    Abstract: Optimizing inventory targets for nodes of a supply chain to satisfy a target customer service level may include accessing a supply chain model that has an assumed value for each of a number of inputs. An optimized inventory target is calculated according to the supply chain model to satisfy the target customer service level, and a measured actual customer service level and a measured actual value for each input are accessed. If the measured actual customer service level fails to satisfy the target customer service level, deviations between the measured actual and assumed values for each input are determined. An input for which the deviation is significant is identified to be a root cause of the failure. For a subsequent time period, using the deviation for the identified input as feedback, the assumed value for the identified input is adjusted, and a reoptimized inventory target is calculated to satisfy the target customer service level.
    Type: Application
    Filed: April 29, 2004
    Publication date: November 18, 2004
    Applicant: i2 Technologies US, Inc.
    Inventors: Koray Dogan, Adeel Najmi, Ramesh Raman
  • Publication number: 20040230473
    Abstract: In one embodiment, estimating demand for a supply chain includes accessing a probability distribution for expected order lead time of the supply chain. The supply chain has nodes including a starting node and an ending node and a path from the starting node to the ending node. The probability distribution for expected order lead time describes ending node demand for the ending node versus order lead time. The path is divided into order lead time segments, and the order lead time segments are associated with the probability distribution for expected order lead time by associating each order lead home segment with a corresponding order lead time range of the probability distribution for expected order lead time. A demand percentage is estimated for each order lead time segment in accordance with the probability distribution for expected order lead time in order to estimate demand for the supply chain.
    Type: Application
    Filed: April 29, 2004
    Publication date: November 18, 2004
    Inventors: Koray Dogan, Adeel Najmi, Ramesh Raman
  • Publication number: 20040230474
    Abstract: In one embodiment, determining order lead time for a supply chain includes generating probability distribution for expected order lead time options, where each probability distribution for expected order lead time option is associated with a category. A category that corresponds to a supply chain is identified. The supply chain has nodes, including a starting node and an ending node that supplies a customer, and designates a path from the starting node to the ending node. A probability distribution for expected order lead time option associated with the identified category is selected as a probability distribution for expected order lead time for the supply chain. The probability distribution for expected order lead time describes ending node demand for the ending node versus order lead time.
    Type: Application
    Filed: April 29, 2004
    Publication date: November 18, 2004
    Applicant: i2 Technologies US, Inc.
    Inventors: Koray Dogan, Adeel Najmi, Ramesh Raman
  • Publication number: 20040230829
    Abstract: Determining a policy parameter for an entity of a supply chain includes establishing attributes of the entities of the supply chain. Attribute segments are established for each attribute, where an attribute segment includes one or more values of the corresponding attribute. Rules are formulated using the attribute segments to define policy groups, and policy parameters are assigned to each policy group. A policy group corresponding to an entity is identified in accordance with the rules. The policy parameters assigned to the identified policy group are determined and selected for the entity.
    Type: Application
    Filed: April 29, 2004
    Publication date: November 18, 2004
    Applicant: i2 Technologies US, Inc.
    Inventors: Koray Dogan, Adeel Najmi, Ramesh Raman, Praveen Upadhyay