Patents by Inventor Lijuan Hu

Lijuan Hu has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 10922452
    Abstract: A digital simulation system of a power distribution network, comprising: a client and a server end. The server end is a simulation server cluster composed of several simulation servers; the simulation server cluster and the client are mutually connected through a communication bus, wherein the client is configured to use a DCOM component to invoke a simulation service provided by the server end, and the server end is configured to distribute a task to be processed to each cluster node. Constructing the above-mentioned digital simulation system facilitates an optimal planning and operation of a smart power distribution network, thereby improving the utilization efficiency and reliability of the smart power distribution network and reducing the loss of a power outage.
    Type: Grant
    Filed: June 30, 2016
    Date of Patent: February 16, 2021
    Assignees: CHINA ELECTRIC POWER RESEARCH INSTITUTE COMPANY LIMITED, STATE GRID CORPORATION OF CHINA
    Inventors: Keyan Liu, Wanxing Sheng, Yinglong Diao, Jiangang Tang, Xueshun Ye, Kaiyuan He, Dongli Jia, Lijuan Hu
  • Patent number: 10825112
    Abstract: A method of predicting the operation reliability of a distribution network, the method being based on an ARIMA model. By establishing an ARIMA model predict a user monthly power outage count; convert a non-smooth element outage count time series to a smooth time series; perform regression on only lagged values of a dependent variable, and on current values and lagged values of a stochastic error term, so as to establish a user monthly power outage count model; according to a prediction result sample an outage point, and at the same time, taking into account a real time load operating state, establish a failure mode effects table based on TLOC criteria and PLOC criteria; and calculate a system recovery time for each instance of device outage, and finally obtain a whole-year reliability index.
    Type: Grant
    Filed: June 30, 2016
    Date of Patent: November 3, 2020
    Assignee: CHINA ELECTRIC POWER RESEARCH INSTITUTE COMPANY LIMITED
    Inventors: Wanxing Sheng, Yinglong Diao, Keyan Liu, Xiaoli Meng, Lijuan Hu, Kaiyuan He, Dongli Jia, Xueshun Ye, Weijie Dong, Jiangang Tang
  • Patent number: 10826292
    Abstract: An embodiment provides a multi-time-scale Digital/Analog (D/A) hybrid simulation system and simulation method therefor for a complex power distribution network and a computer storage medium, and is intended to solve existing problems about multi-time-scale modeling and simulation of the complex power distribution network and simulation accuracy and efficiency of the complex power distribution network.
    Type: Grant
    Filed: June 28, 2017
    Date of Patent: November 3, 2020
    Assignees: CHINA ELECTRIC POWER RESEARCH INSTITUTE CO. LTD., STATE GRID CORPORATION OF CHINA
    Inventors: Wanxing Sheng, Keyan Liu, Xiaoli Meng, Weijie Dong, Yajie Li, Xueshun Ye, Yongmei Liu, Yinglong Diao, Dongli Jia, Lijuan Hu, Kaiyuan He
  • Publication number: 20190067939
    Abstract: An embodiment provides a multi-time-scale Digital/Analog (D/A) hybrid simulation system and simulation method therefor for a complex power distribution network and a computer storage medium, and is intended to solve existing problems about multi-time-scale modeling and simulation of the complex power distribution network and simulation accuracy and efficiency of the complex power distribution network.
    Type: Application
    Filed: June 28, 2017
    Publication date: February 28, 2019
    Inventors: Wanxing Sheng, Keyan Liu, Xiaoli Meng, Weijie Dong, Yajie Li, Xueshun Ye, Yongmei Liu, Yinglong Diao, Dongli Jia, Lijuan Hu, Kaiyuan He
  • Publication number: 20180247001
    Abstract: A digital simulation system of a power distribution network, comprising: a client and a server end. The server end is a simulation server cluster composed of several simulation servers; the simulation server cluster and the client are mutually connected through a communication bus, wherein the client is configured to use a DCOM component to invoke a simulation service provided by the server end, and the server end is configured to distribute a task to be processed to each cluster node. Constructing the above-mentioned digital simulation system facilitates an optimal planning and operation of a smart power distribution network, thereby improving the utilization efficiency and reliability of the smart power distribution network and reducing the loss of a power outage.
    Type: Application
    Filed: June 30, 2016
    Publication date: August 30, 2018
    Inventors: Keyan LIU, Wanxing Sheng, Yinglong Diao, Jiangang Tang, Xueshun Ye, Kaiyuan He, Dongli Jia, Lijuan Hu
  • Publication number: 20180240202
    Abstract: A method of predicting the operation reliability of a distribution network, the method being based on an ARIMA model. By establishing an ARIMA model predict a user monthly power outage count; convert a non-smooth element outage count time series to a smooth time series; perform regression on only lagged values of a dependent variable, and on current values and lagged values of a stochastic error term, so as to establish a user monthly power outage count model; according to a prediction result sample an outage point, and at the same time, taking into account a real time load operating state, establish a failure mode effects table based on TLOC criteria and PLOC criteria; and calculate a system recovery time for each instance of device outage, and finally obtain a whole-year reliability index.
    Type: Application
    Filed: June 30, 2016
    Publication date: August 23, 2018
    Inventors: Wanxing Sheng, Yinglong Diao, Keyan Liu, Xiaoli Meng, Lijuan Hu, Kaiyuan He, Dongli Jia, Xueshun Ye, Weijie Dong, Jiangang Tang