  • Patent number: 7197469
    Abstract: A method and system for resource rationing which employs decision rules for the optimal allocation of supply and capacity over time that satisfy two key requirements (a) being consistent with accepted operational objectives (e.g. low inventory, short lead times, prioritized allocation of supply and capacity) and (b) allowing for the timely computation of a feasible production schedule. The method and system is generally characterized in that it is able to divide each of the priority ranked scheduled releases (Material Requirements Planning (MRP)) into “N” separate and smaller sized scheduled releases where the priority of each of the “N” releases may be equal to the priority of the original release. The “N” separate and smaller sized scheduled releases are sorted according to priority and then used to determine an optimal supply schedule for allocating resources including component supply and assembly capacity.
    Type: Grant
    Filed: June 26, 2001
    Date of Patent: March 27, 2007
    Assignee: International Business Machines Corporation
    Inventors: Sanjay R. Hegde, Robert John Milne, Robert A. Orzell, Mahesh Chandra Pati, Shivakumar P. Patil
  • Publication number: 20020198757
    Abstract: A method and system for resource rationing which employs decision rules for the optimal allocation of supply and capacity over time that satisfy two key requirements (a) being consistent with accepted operational objectives (e.g. low inventory, short lead times, prioritized allocation of supply and capacity) and (b) allowing for the timely computation of a feasible production schedule. The method and system is generally characterized in that it is able to divide each of the priority ranked scheduled releases (Material Requirements Planning (MRP)) into “N” separate and smaller sized scheduled releases where the priority of each of the “N” releases may be equal to the priority of the original release. The “N” separate and smaller sized scheduled releases are sorted according to priority and then used to determine an optimal supply schedule for allocating resources including component supply and assembly capacity.
    Type: Application
    Filed: June 26, 2001
    Publication date: December 26, 2002
    Applicant: International Business Machines Corporation
    Inventors: Sanjay R. Hegde, Robert John Milne, Robert A. Orzell, Mahesh Chandra Pati, Shivakumar P. Patil