Patents by Inventor Manchao He
Manchao He has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).
-
Patent number: 11679429Abstract: A processing method of NPR steel rebar coil is disclosed. The NPR steel rebar is cold processed and has a diameter of less than 14 mm, and has a yield strength of 800˜950 MPa, a tensile strength of 900˜1100 MPa, and a elongation of not less than 20%. The processing method comprises: an I-shaped placing step L20, an uncoiling step L30, a flattening step L40, a pointing step L50, a butt welding step L60, a hydraulic head-pushing step L70, a cold drawn smoothing step L80, a grit blasting step L90, an in-situ inline annealing step L10, an air-cooled tempering step L11, a coiling step L12, a placing step L13, a flattening step L14, a cold drawn spiral ribbing step L15, a straightening step L16, and a coiling step L17. The method can achieve full intelligence, meet the processing requirements and the automatic intelligent production requirements of NPR steel rebar coil.Type: GrantFiled: September 28, 2020Date of Patent: June 20, 2023Assignees: JING-JIN ELECTRIC TECHNOLOGIES CO., LTD.Inventors: Manchao He, Min Xia
-
Publication number: 20230175398Abstract: The present disclosure relates to the technical field of mine ventilation, and in particular, to a three-dimensional ventilation method and system for mining by 110 construction method in coal and gas outburst mines.Type: ApplicationFiled: April 30, 2021Publication date: June 8, 2023Inventors: Jiong Wang, Wenfei Li, Zimin Ma, Guangyuan Yu, Manchao He, Gonghua Chen, Guoqiang Xiao
-
Patent number: 11655595Abstract: An adjustable device for railway to cross active faults is provided to fix a rail and a sleeper, including: a fastener mounting base, disposed between the rail and sleeper; clamping pipes, disposed between the fastener mounting base and the sleeper, the sleeper is provided with a through groove, and the clamping pipes are detachably fixed inside the through groove; control parts, disposed on an inner wall of the clamping pipes, each of the control parts is configured to detect lateral pressures between the fastener mounting base and corresponding one of the clamping pipes, thereby to separate the corresponding one of the clamping pipes from the through groove, the device ensures that the rail will not produce bending deformations after the lateral dislocation of the bottom layer during earthquake events, and ensure that a train or rail repair vehicle can pass at a low speed after earthquake.Type: GrantFiled: August 24, 2022Date of Patent: May 23, 2023Assignee: INSTITUTE OF GEOLOGY AND GEOPHYSICS, CHINESE ACADEMY OF SCIENCESInventors: Songfeng Guo, Shengwen Qi, Manchao He, Hui Zhou, Yu Zou, Zhiqing Li, Lihui Li, Bowen Zheng, Jinxuan Li, Guangming Luo, Fengjiao Tang, Weiluan Wen
-
Publication number: 20230099008Abstract: Disclosed is a tunnel protection structure suitable for active fault areas and high ground stress areas, and relates to the technical field of tunnel engineering construction. The tunnel protection structure comprises at least one protection unit, wherein a plurality of protection units are sequentially connected and distributed along the axial direction of a tunnel, and the protection units comprise a radial protection ring and two axial protection rings which are fixedly arranged between a lining structure and surrounding rock and are distributed along the axial direction of the tunnel; the radial protection ring comprises a plurality of radial buffer energy consumption layers which are sequentially sleeved along the radial direction of the tunnel; and the axial protection ring comprises a plurality of axial buffer energy consumption layers which are sequentially and fixedly connected along the axial direction of the tunnel.Type: ApplicationFiled: August 17, 2022Publication date: March 30, 2023Applicant: Institute of Geology and Geophysics, Chinese Academy of SciencesInventors: Bowen ZHENG, Shengwen QI, Yongshuang ZHANG, Songfeng GUO, Manchao HE, Hui ZHOU
-
Patent number: 11598210Abstract: Disclosed is a tunnel protection structure suitable for active fault areas and high ground stress areas, and relates to the technical field of tunnel engineering construction. The tunnel protection structure comprises at least one protection unit, wherein a plurality of protection units are sequentially connected and distributed along the axial direction of a tunnel, and the protection units comprise a radial protection ring and two axial protection rings which are fixedly arranged between a lining structure and surrounding rock and are distributed along the axial direction of the tunnel; the radial protection ring comprises a plurality of radial buffer energy consumption layers which are sequentially sleeved along the radial direction of the tunnel; and the axial protection ring comprises a plurality of axial buffer energy consumption layers which are sequentially and fixedly connected along the axial direction of the tunnel.Type: GrantFiled: August 17, 2022Date of Patent: March 7, 2023Assignee: Institute of Geology and Geophysics, Chinese Academy of SciencesInventors: Bowen Zheng, Shengwen Qi, Yongshuang Zhang, Songfeng Guo, Manchao He, Hui Zhou
-
Patent number: 11596991Abstract: A processing method of NPR steel rebar rod is disclosed. The NPR steel rebar is cold processed and has a yield strength of 800˜950 MPa, a tensile strength of 900˜1100 MPa, and a percentage elongation at maximum force of not less than 10˜40%. The processing method comprises the following steps: a I-shaped placing step L20, an uncoiling step L30, a flattening step L40, a butt welding step L50, a sandblasting step L60, a straightening step L70, a pointing step L80, a hydraulic head-pushing step L90, a cold drawn spiral ribbing step L10, a straight forward continuous wire drawing and traction step L11, a pre-straightening step L12, a fine straightening step L13, and a cutting-off step L14. The processing method can meet the automatic intelligent production requirements of NPR steel rebar, cold rolled spiral NPR steel rebar, and pre-stressed NPR steel rebar.Type: GrantFiled: September 28, 2020Date of Patent: March 7, 2023Assignee: Min XiaInventors: Manchao He, Min Xia
-
Patent number: 11578597Abstract: An underground longwall mining method includes drilling a main shaft and an auxiliary shaft from a ground to a coal bed and exploiting in the coal bed first and second connection laneways. The first connection laneway is in communication with the main shaft, and the second connection laneway is in communication with the auxiliary shaft. The method further includes communicating the first and second connection laneways, and using a communication part between the first connection laneway and the second connection laneway as a first open-off cut; and by using a direction of the first open-off cut further away from the connecting line connecting the main shaft and the auxiliary shaft as a first direction, and exploiting by cutting a coal wall in the first direction using a coal mining machine.Type: GrantFiled: July 22, 2019Date of Patent: February 14, 2023Assignee: Beijing Zhongkuang Innovation Alliance Energy Environment Science AcademyInventors: Manchao He, Yajun Wang, Jun Yang
-
Patent number: 11578598Abstract: A coal mining method is provided without coal-pillar leaving and without laneway excavation in a full mining area. The coal mining method includes drilling a main shaft, an auxiliary shaft and a return air shaft from a ground to a coal mining layer; by a coal mining machine, forming a first mining face with a first direction as an advance direction; by the coal mining machine, cutting out a first haulageway and a first return airway while cutting the coal wall at the first mining face, and preserving the first haulageway and the first return airway. In this method, the first haulageway and the first return airway are located on two sides of the first mining face, the first haulageway is in communication with both of the main and auxiliary shafts, and the first return airway is in communication with the return air shaft.Type: GrantFiled: July 22, 2019Date of Patent: February 14, 2023Assignee: Beijing Zhongkuang Innovation Alliance Energy Environment Science AcademyInventors: Manchao He, Yubing Gao, Qiang Fu, Yajun Wang
-
Publication number: 20220314291Abstract: A processing method of NPR steel rebar coil is disclosed. The NPR steel rebar is cold processed and has a diameter of less than 14 mm, and has a yield strength of 800˜950 MPa, a tensile strength of 900˜1100 MPa, and a elongation of not less than 20%. The processing method comprises: a I-shaped placing step L20, an uncoiling step L30, a flattening step L40, a pointing step L50, a butt welding step L60, a hydraulic head-pushing step L70, a cold drawn smoothing step L80, a grit blasting step L90, an in-situ inline annealing step L10, an air-cooled tempering step L11, a coiling step L12, a placing step L13, a flattening step L14, a cold drawn spiral ribbing step L15, a straightening step L16, and a coiling step L17. The method can achieve full intelligence, meet the processing requirements and the automatic intelligent production requirements of NPR steel rebar coil.Type: ApplicationFiled: September 28, 2020Publication date: October 6, 2022Inventors: Manchao HE, Min XIA
-
Patent number: 11434558Abstract: An NPR non-magnetic steel material for rock bolt and a production method thereof are disclosed. The NPR non-magnetic steel material for rock bolt has a composition, in weight percent, consisting of: C: 0.4-0.7%, MN: 15-20%, Cr: 1-18%, Si: 0.3-3%, Ca: 0.05-0.15%, Cu: ?0.03%, Ni: ?0.02%, S: ?0.001%, P: ?0.001%, and the rest being Fe and unavoidable impurity elements. The NPR non-magnetic steel material for rock bolt and the production method thereof effectively solve the problems of steel materials for rock bolt in the prior art such as strong magnetism, low tensile strength and low effective elongation. The NPR non-magnetic steel material for rock bolt has a fully-austenitized structure and is non-magnetic, its yield strength is adjustable in the range of 600-1000 MPa, and its elongation is adjustable in the range of 20-60%.Type: GrantFiled: May 23, 2018Date of Patent: September 6, 2022Inventors: Manchao He, Min Xia
-
Publication number: 20220275726Abstract: The present disclosure relates to a technical field of coal mining, particularly to a method of no-pillar mining with gob-entry retaining adapted for fully-mechanized top coal caving in a thick coal seam, which comprises the following steps: reinforcing support on a roof and two sides of a roadway; performing roof slitting blasting to form a pre-splitting slit; erecting a temporary support device and a gangue retaining device in the roadway along the retained entry; performing no caving within a range of a preset distance at an end of the working face near the retained entry side; and removing the temporary support device in the roadway after entry forming stabilizes, and closing the goaf to complete entry retaining.Type: ApplicationFiled: April 15, 2020Publication date: September 1, 2022Applicant: China University of Mining and Technology, BeijingInventors: Jiong WANG, Manchao HE, Guangyuan YU, Han SUN
-
Patent number: 11427899Abstract: An NPR steel material for rock bolt and a production method thereof are disclosed. The NPR steel material for rock bolt has a composition, in weight percent, consisting of: C: 0.4-0.7%, Mn: 15-20%, Si: ?0.1%, Cu: ?0.03%, Cr: ?0.01%, Ni: ?0.02%, S: ?0.001%, P: ?0.001%, and the rest being Fe and unavoidable impurity elements. The NPR steel material for rock bolt and the production method thereof effectively solve the problem that rock bolts in the prior art have low tensile strength and low effective elongation. The NPR steel material for rock bolt has a yield strength adjustable in the range of 500-1100 MPa, and an elongation adjustable in the range of 10-80%.Type: GrantFiled: May 23, 2018Date of Patent: August 30, 2022Assignee: XIA, MINInventors: Manchao He, Min Xia
-
Publication number: 20220266394Abstract: A processing method of NPR steel rebar rod is disclosed. The NPR steel rebar is cold processed and has a yield strength of 800˜950 MPa, a tensile strength of 900˜1100 MPa, and a percentage elongation at maximum force of not less than 10˜40%. The processing method comprises the following steps: a I-shaped placing step L20, an uncoiling step L30, a flattening step L40, a butt welding step L50, a sandblasting step L60, a straightening step L70, a pointing step L80, a hydraulic head-pushing step L90, a cold drawn spiral ribbing step L10, a straight forward continuous wire drawing and traction step L11, a pre-straightening step L12, a fine straightening step L13, and a cutting-off step L14. The processing method can meet the automatic intelligent production requirements of NPR steel rebar, cold rolled spiral NPR steel rebar, and pre-stressed NPR steel rebar.Type: ApplicationFiled: September 28, 2020Publication date: August 25, 2022Inventors: Manchao HE, Min XIA
-
Publication number: 20220251952Abstract: A pit designing method is provided without coal-pillar leaving and laneway excavation. The method includes drilling a main shaft and an auxiliary shaft from a ground to a coal bed and exploiting in the coal bed first and second connection laneways. The first connection laneway is in communication with the main shaft, and the second connection laneway is in communication with the auxiliary shaft. The method further includes communicating the first and second connection laneways, and using a communication part between the first connection laneway and the second connection laneway as a first open-off cut; and by using a direction of the first open-off cut further away from the connecting line connecting the main shaft and the auxiliary shaft as a first direction, and exploiting by cutting a coal wall in the first direction using a coal mining machine.Type: ApplicationFiled: July 22, 2019Publication date: August 11, 2022Inventors: Manchao HE, Yajun WANG, Jun YANG
-
Publication number: 20220251953Abstract: A coal mining method is provided without coal-pillar leaving and without laneway excavation in a full mining area. The coal mining method includes drilling a main shaft, an auxiliary shaft and a return air shaft from a ground to a coal mining layer; by a coal mining machine, forming a first mining face with a first direction as an advance direction; by the coal mining machine, cutting out a first haulageway and a first return airway while cutting the coal wall at the first mining face, and preserving the first haulageway and the first return airway. In this method, the first haulageway and the first return airway are located on two sides of the first mining face, the first haulageway is in communication with both of the main and auxiliary shafts, and the first return airway is in communication with the return air shaft.Type: ApplicationFiled: July 22, 2019Publication date: August 11, 2022Inventors: Manchao HE, Yubing GAO, Qiang FU, Yajun WANG
-
Publication number: 20220228487Abstract: An NPR rock bolt according to the present disclosure comprises a bolt body (1), a tray (2) and a lock (3). The bolt body (1) is an NPR spiral steel bar, an outer surface of the NPR spiral steel bar is provided with a number of convex spiral ribs, and the spiral ribs have a spiral structure. The tray (2) and the lock (3) are directly sleeved on a tail of the NPR spiral steel bar. The NPR bolt according to the present disclosure can effectively solve the problem in the prior art that conventional rock bolts have a low elongation and cannot meet the requirement of large deformation of the surrounding rock.Type: ApplicationFiled: September 27, 2020Publication date: July 21, 2022Inventors: Manchao HE, Min XIA
-
Mine vertical shaftlifting apparatus, mine vertical shaft lifting system and control method therefor
Patent number: 11390489Abstract: A hoisting apparatus for a mine vertical shaft, a hoisting system for a mine vertical shaft and a controlling method thereof are provided. The hoisting apparatus includes a driving device provided at a wellhead and a guiding device provided in a vertical shaft. A position of the guiding device corresponds to a position of the driving device and a transmission rope is wound around the driving device and the guiding device. Moreover, the driving device is drivingly connected to the guiding device via the transmission rope; and a tension regulating device is provided in the vertical shaft. The guiding device is movably provided at the tension regulating device that is for regulating a distance between the driving device and the guiding device. The tension regulating device controls a tension of the transmission rope by regulating the distance between the driving device and the guiding device.Type: GrantFiled: October 31, 2018Date of Patent: July 19, 2022Assignee: CHINA UNIVERSITY OF MINING & TECHNOLOGY, BEIJINGInventors: Manchao He, Guohua Cao, Xiaoming Sun, Jun Yang -
Patent number: 11333590Abstract: An experimental system for simulating creep and stick-slip dislocations of a fault in a tunnel structure includes a box structure, a supporting device and a fault dislocation loading system. A friction effect layer, a first surrounding rock layer, a tunnel structure model, a second surrounding rock layer and an overburden pressure layer are sequentially arranged in the box structure from bottom to top. The bottom of the box structure is provided with a through hole. A plate assembly is provided on the through hole, and includes a first guide plate, a second guide plate and a loading plate. Inner sides of the first guide plate and the second guide plate are respectively provided with a first slide rail and a second slide rail. The loading plate moves along the first slide rail and the second slide rail under the action of the fault dislocation loading system.Type: GrantFiled: January 29, 2022Date of Patent: May 17, 2022Assignee: INSTITUTE OF GEOLOGY AND GEOPHYSICS, CHINESE ACADEMY OF SCIENCESInventors: Guangming Luo, Shengwen Qi, Bowen Zheng, Yu Zou, Manchao He, Hui Zhou, Xiaolin Huang, Songfeng Guo, Ning Liang
-
MINE VERTICAL SHAFTLIFTING APPARATUS, MINE VERTICAL SHAFT LIFTING SYSTEM AND CONTROL METHOD THEREFOR
Publication number: 20210309489Abstract: A hoisting apparatus for a mine vertical shaft, a hoisting system for a mine vertical shaft and a controlling method thereof are provided. The hoisting apparatus includes a driving device provided at a wellhead and a guiding device provided in a vertical shaft. A position of the guiding device corresponds to a position of the driving device and a transmission rope is wound around the driving device and the guiding device. Moreover, the driving device is drivingly connected to the guiding device via the transmission rope; and a tension regulating device is provided in the vertical shaft. The guiding device is movably provided at the tension regulating device that is for regulating a distance between the driving device and the guiding device. The tension regulating device controls a tension of the transmission rope by regulating the distance between the driving device and the guiding device.Type: ApplicationFiled: October 31, 2018Publication date: October 7, 2021Inventors: Manchao HE, Guohua CAO, Xiaoming SUN, Jun YANG -
Patent number: 11085859Abstract: An experimental system for simulating the effect of a fault stick-slip displacement on a tunnel engineering includes a model box system and a stick-slip loading system. The model box system is configured to simulate an interaction between two walls of a fault. The stick-slip loading system includes a first loading assembly, a second loading assembly and a bearing assembly. The first loading assembly includes a first loading device, and a first sample frame configured to place a main loading rock mass sample. The bearing assembly is arranged on two sides of the first sample frame. Sub-loading rock mass samples borne by the bearing assembly are configured to abut against the main loading rock mass sample under the action of the second loading assembly. A method for simulating the effect of a fault stick-slip displacement on a tunnel engineering based on the above system is further provided.Type: GrantFiled: April 9, 2021Date of Patent: August 10, 2021Assignee: INSTITUTE OF GEOLOGY AND GEOPHYSICS, CHINESE ACADEMY OF SCIENCESInventors: Yu Zou, Guangming Luo, Bowen Zheng, Shengwen Qi, Hui Zhou, Manchao He