Patents by Inventor Mark Triska

Mark Triska has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 7404449
    Abstract: A pile driving control apparatus for a pile driving system includes a hydraulic control system that controls a throttle of a pile driving hammer, and thereby controls an impact velocity of the hammer with a pile. A controller provides a control signal to the hydraulic control system. Based on the control signal, the hydraulic control system controls an impact velocity of the hammer during a subsequent hammer stroke. The controller may determine one or more control parameters such as sound pressure at a sound control location during a hammer stroke, vibration at a vibration control location during a hammer stroke, an impact force imparted to the pile during a hammer stroke, and/or actual pile capacity of the pile, and provide to the hydraulic control system a control signal based on the determined control parameter(s).
    Type: Grant
    Filed: November 20, 2006
    Date of Patent: July 29, 2008
    Assignee: Bermingham Construction Limited
    Inventors: Patrick Donald Bermingham, Mark Triska, Michael Justason, David Hoover, Stefano Gabaldo, Peter Middendorp, William Codd
  • Publication number: 20070074881
    Abstract: A pile driving control apparatus for a pile driving system includes a hydraulic control system that controls a throttle of a pile driving hammer, and thereby controls an impact velocity of the hammer with a pile. A controller provides a control signal to the hydraulic control system. Based on the control signal, the hydraulic control system controls an impact velocity of the hammer during a subsequent hammer stroke. The controller may determine one or more control parameters such as sound pressure at a sound control location during a hammer stroke, vibration at a vibration control location during a hammer stroke, an impact force imparted to the pile during a hammer stroke, and/or actual pile capacity of the pile, and provide to the hydraulic control system a control signal based on the determined control parameter(s).
    Type: Application
    Filed: November 20, 2006
    Publication date: April 5, 2007
    Applicant: Bermingham Construction Limited
    Inventors: Patrick Bermingham, Mark Triska, Michael Justason, David Hoover, Stefano Gabaldo, Peter Middendorp, William Codd
  • Patent number: 7156188
    Abstract: A pile driver comprises a hammer for impacting a pile, a velocity sensor for measuring the velocity at impact, and a control system for adjusting the hammer stroke in accordance with the readings from the velocity sensor so that the optimal impact energy is imparted to the head of the pile. Optionally, the system further comprises a pile driving analyzer (including at least one strain gauge and/or an accelerometer) mounted on the side of the pile itself to determine whether the impact loading on the pile is below the maximum allowable stress. If the pile driving analyzer senses an overload of stress on the pile, the control system will reduce the velocity of the subsequent hammer stroke so that it no longer exceeds the maximum allowable stress.
    Type: Grant
    Filed: May 12, 2004
    Date of Patent: January 2, 2007
    Assignee: Bermingham Construction Limited
    Inventors: Patrick Bermingham, Mark Triska, Michael Justason, Grant Bearss, David Hoover, Stefano Gabaldo, Tim Rosenberger
  • Publication number: 20050023014
    Abstract: A pile driver comprises a hammer for impacting a pile, a velocity sensor for measuring the velocity at impact, and a control system for adjusting the hammer stroke in accordance with the readings from the velocity sensor so that the optimal impact energy is imparted to the head of the pile. Optionally, the system further comprises a pile driving analyzer (including at least one strain gauge and/or an accelerometer) mounted on the side of the pile itself to determine whether the impact loading on the pile is below the maximum allowable stress. If the pile driving analyzer senses an overload of stress on the pile, the control system will reduce the velocity of the subsequent hammer stroke so that it no longer exceeds the maximum allowable stress.
    Type: Application
    Filed: May 12, 2004
    Publication date: February 3, 2005
    Applicant: Bermingham Construction Limited
    Inventors: Patrick Bermingham, Mark Triska, Michael Justason, Grant Bearss, David Hoover, Stefano Gabaldo, Tim Rosenberger