Patents by Inventor Masashi Egi
Masashi Egi has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).
-
Publication number: 20110153379Abstract: According to one embodiment of the present invention, a skill level of a staff member is discriminated from an actual job log of the staff member, productivity including the skill level, a salary, and combination efficiency with another staff member is calculated, and a staff arrangement plan maximizing a productive efficiency is outputted.Type: ApplicationFiled: July 30, 2009Publication date: June 23, 2011Inventors: Minako Toba, Yasuhide Mori, Ken Naono, Masashi Egi, Takao Sakurai
-
Patent number: 7958217Abstract: Provided is a job management system includes: a terminal for executing a job, and for collecting operation information corresponding to respective operations executed by an operator; and a management server for managing the operation information collected by the terminal, the management server being connected to the terminal via a network, in which: the terminal transmits, to the management server, operation log data including the operation information capable of identifying the respective operations executed by the operator; and the management server stores, in advance, information indicating categories for the operation information and combinations thereof which are used for interpreting the operation information transmitted from the terminal as the corresponding operation executed by the operator with respect to the terminal, and selects categories for the operation information and a combination thereof which minimize a data size of the operation log data to be transmitted by the terminal.Type: GrantFiled: May 23, 2007Date of Patent: June 7, 2011Assignee: Hitachi, Ltd.Inventors: Masashi Egi, Ken Naono, Takao Sakurai
-
Publication number: 20110093126Abstract: An environmental control system according to the present invention is a system for controlling environmental devices by which a work status and a behavior status are monitored and the environmental devices are finely controlled in accordance with the statuses to improve comfort. The environmental control system includes a communication unit, a unit for detecting environments, a unit for detecting a work status, a unit for obtaining power consumption, a unit for determining the control of a device, and a unit for transmitting a control signal, and enables fine control in accordance with a work type.Type: ApplicationFiled: October 20, 2010Publication date: April 21, 2011Applicant: Hitachi, Ltd.Inventors: Minako TOBA, Yasuhide MORI, Ken NAONO, Masashi EGI, Takao SAKURAI
-
Publication number: 20110016110Abstract: A trail management system acquires and manages operation contents in a PC that is provided with an operation function including a document transcription function. When a user performs a transcription operation, a server acquires operation information and stores it as chronological data. The operation information contains time of the transcription operation, a user name, a value transcribed by the transcription operation, document specification information for specifying a transcription origin document during the transcription operation, location specification information for specifying a transcription origin location in the transcription origin document, document specification information for specifying a transcription destination document during the transcription operation, and location specification information for specifying a transcription destination location in the transcription origin document.Type: ApplicationFiled: March 30, 2010Publication date: January 20, 2011Inventors: Masashi EGI, Takao Sakurai, Ken Naono
-
Patent number: 7739083Abstract: When a parameter for a numerical computation library is required, an optimum parameter reflecting a user policy is provided. A program calculates, based on a preset objective function, an optimum tuning parameter for executing a numerical computation library. The program reads the numerical computation library; reads the objective function; sets a user policy regarding speed performance and computational accuracy of the numerical computation library as plural policy parameters; reads, from preset execution histories of numerical computation libraries, execution histories of the numerical computation library; calculates, in a domain where the policy parameters are met and based on the execution histories having been read in, a tuning parameter for the numerical computation library by using the objective function; and outputs a calculation result of the objective function.Type: GrantFiled: July 5, 2006Date of Patent: June 15, 2010Assignee: Hitachi, Ltd.Inventors: Ken Naono, Masashi Egi
-
Patent number: 7707509Abstract: Collectively predicting input operations for plural operation object items (subwindows) belonging to a same window. A proposal window PG stores in a statistics information database and manages information about the input entity and an operation object of an input operation accepted from a user, and a window to which the operation object belongs, along with transition information indicating the transition of active windows concerned in previous input operations. When an active window transitions because of an input operation accepted from the user, it searches the statistics information database for information that contains information about a new active window and is associated with transition information matching the transition of active windows concerned in previous input operations.Type: GrantFiled: July 14, 2006Date of Patent: April 27, 2010Assignee: Hitachi, Ltd.Inventors: Ken Naono, Hiroaki Fujii, Masashi Egi, Shunji Takubo
-
Patent number: 7698423Abstract: A computer system comprising a plurality of first computers each operated by an operator and a second computer coupled via a network to the plurality of first computers. Each of the plurality of first computers executes at least one software, obtains operation information by the operator with respect to the at least one software to be executed, receives an input of information from the operator, displays a confirm window for the operator to check whether the received input information is correct or not, calculates operation time period about the displayed confirm window based on the obtained operation information; and sends the calculated operation time period about the confirm window to the second computer. The second computer receives the operation time period about the confirm window, and calculates the number of operations of which the received operation time period about the confirm window is shorter than a first threshold value.Type: GrantFiled: January 4, 2008Date of Patent: April 13, 2010Assignees: Hitachi, Ltd., Hitachi Systems & Services, Ltd.Inventors: Ken Naono, Masashi Egi, Takao Sakurai
-
Publication number: 20080255847Abstract: Voice of plural participants during a meeting is obtained and dialogue situations of the participants that change every second are displayed in real time, so that it is possible to provide a meeting visualization system for triggering more positive discussions. Voice data collected from plural voice collecting units associated with plural participants is processed by a voice processing server to extract speech information. The speech information is sequentially input to an aggregation server. A query process is performed for the speech information by a stream data processing unit of the aggregation server, so that activity data such as the accumulation value of speeches of the participants in the meeting is generated. A display processing unit visualizes and displays dialogue situations of the participants by using the sizes of circles and the thicknesses of lines on the basis of the activity data.Type: ApplicationFiled: April 1, 2008Publication date: October 16, 2008Inventors: Norihiko Moriwaki, Nobuo Sato, Tsuneyuki Imaki, Toshihiko Kashiyama, Itaru Nishizawa, Masashi Egi
-
Publication number: 20080177877Abstract: A computer system comprising a plurality of first computers each operated by an operator and a second computer coupled via a network to the plurality of first computers. Each of the plurality of first computers executes at least one software, obtains operation information by the operator with respect to the at least one software to be executed, receives an input of information from the operator, displays a confirm window for the operator to check whether the received input information is correct or not, calculates operation time period about the displayed confirm window based on the obtained operation information; and sends the calculated operation time period about the confirm window to the second computer. The second computer receives the operation time period about the confirm window, and calculates the number of operations of which the received operation time period about the confirm window is shorter than a first threshold value.Type: ApplicationFiled: January 4, 2008Publication date: July 24, 2008Inventors: Ken Naono, Masashi Egi, Takao Sakurai
-
Publication number: 20070288443Abstract: An object of this invention is to analyze history information for each of a plurality of instances, and generate a time series pattern for each of a plurality of business processes. A time series pattern generating system analyzes the history information of an instance generated upon each execution of a class that defines a series of processes and is constituted by components having a defined order, and generates a time series pattern. The history information is generated upon each execution of the components, stored in chronological order, and includes a class identifier, a component identifier, an instance identifier, and component processing time information. Information relating to the processing order of the components that are executed in each instance is created, dependence relationships between the components are estimated, and a time series pattern including a component processing order is generated.Type: ApplicationFiled: June 4, 2007Publication date: December 13, 2007Inventors: Takao Sakurai, Ken Naono, Masashi Egi
-
Publication number: 20070282920Abstract: Provided is a job management system includes: a terminal for executing a job, and for collecting operation information corresponding to respective operations executed by an operator; and a management server for managing the operation information collected by the terminal, the management server being connected to the terminal via a network, in which: the terminal transmits, to the management server, operation log data including the operation information capable of identifying the respective operations executed by the operator; and the management server stores, in advance, information indicating categories for the operation information and combinations thereof which are used for interpreting the operation information transmitted from the terminal as the corresponding operation executed by the operator with respect to the terminal, and selects categories for the operation information and a combination thereof which minimize a data size of the operation log data to be transmitted by the terminal.Type: ApplicationFiled: May 23, 2007Publication date: December 6, 2007Inventors: Masashi Egi, Ken Naono, Takao Sakurai
-
Publication number: 20070265898Abstract: To readily understand contents of business operations without burdening an operator, this invention provides a business analysis method including: obtaining information on operations of a user with respect to software programs selected by the user among the plurality of software programs operated by a computer; estimating one business content that is executed by the computer in each of time spans based on a combination of exploited identification information of the plurality of software programs.Type: ApplicationFiled: May 10, 2007Publication date: November 15, 2007Inventors: Ken Naono, Masashi Egi, Takao Sakurai
-
Patent number: 7231299Abstract: The amount of risk in weather derivatives is calculated properly by taking into account a correlation between weather observation sites and a correlation between meteorological elements. A weather prediction method by creating a weather scenario from historical weather data includes a first step of estimating parameters of a weather time-series model based on historical weather data including past plural meteorological elements, a meteorological element correlation between sites, and a correlation between meteorological elements, and a second step of converting random numbers into meteorological elements based on the estimated parameters. The second step is executed a given number of times to create a plurality of weather scenarios.Type: GrantFiled: July 28, 2004Date of Patent: June 12, 2007Assignee: Hitachi, Ltd.Inventor: Masashi Egi
-
Publication number: 20070050725Abstract: Collectively predicting input operations for plural operation object items (subwindows) belonging to a same window. A proposal window PG stores in a statistics information database and manages information about the input entity and an operation object of an input operation accepted from a user, and a window to which the operation object belongs, along with transition information indicating the transition of active windows concerned in previous input operations. When an active window transitions because of an input operation accepted from the user, it searches the statistics information database for information that contains information about a new active window and is associated with transition information matching the transition of active windows concerned in previous input operations.Type: ApplicationFiled: July 14, 2006Publication date: March 1, 2007Inventors: Ken Naono, Hiroaki Fujii, Masashi Egi, Shunji Takubo
-
Publication number: 20070021849Abstract: When a parameter for a numerical computation library is required, an optimum parameter reflecting a user policy is provided. A program calculates, based on a preset objective function, an optimum tuning parameter for executing a numerical computation library. The program reads the numerical computation library; reads the objective function; sets a user policy regarding speed performance and computational accuracy of the numerical computation library as plural policy parameters; reads, from preset execution histories of numerical computation libraries, execution histories of the numerical computation library; calculates, in a domain where the policy parameters are met and based on the execution histories having been read in, a tuning parameter for the numerical computation library by using the objective function; and outputs a calculation result of the objective function.Type: ApplicationFiled: July 5, 2006Publication date: January 25, 2007Inventors: Ken Naono, Masashi Egi
-
Publication number: 20060150191Abstract: A symptom state shifting from a low load state to a high load state is detected. A measured value collection unit 131 stores measured values of a queue length measured by a queue length measurement unit 31 of each server 3, into a measured value storage unit 14. A fluctuation calculation unit 132 calculates a fluctuation of measured values that have been measured in a given time for each server. A symptom state judgment unit 133 compares the calculated fluctuation with a threshold to judge whether the server 3 for which the fluctuation has been calculated is in the symptom state or the high load state.Type: ApplicationFiled: February 22, 2005Publication date: July 6, 2006Inventors: Mineyoshi Masuda, Masashi Egi, Toshiaki Tarui
-
Publication number: 20050254424Abstract: An IT system is operated reflecting a management policy accurately. In a method for determining allocation of IT resources of an IT system shared by divisional operations of an organization based on management resources allocation among divisions in the organization, the method comprises a first and a second steps of resource allocation. In the first step, management resource allocation for each of the divisional operations is determined so as to optimize a value of an operational objective based on the assumption that IT resource allocation is equal among the divisional operations and based on the management resource allocation among the divisions of the organization. In the second step, IT resource allocation for each of the divisional operations is determined so as to optimize the operational objective value based on the management resource allocation for each of the divisional operations determined in the first step.Type: ApplicationFiled: January 13, 2005Publication date: November 17, 2005Inventors: Ken Naono, Shunji Takubo, Masashi Egi
-
Publication number: 20050197774Abstract: The amount of risk in weather derivatives is calculated properly by taking into account a correlation between weather observation sites and a correlation between meteorological elements. A weather prediction method by creating a weather scenario from historical weather data includes a first step of estimating parameters of a weather time-series model based on historical weather data including past plural meteorological elements, a meteorological element correlation between sites, and a correlation between meteorological elements, and a second step of converting random numbers into meteorological elements based on the estimated parameters. The second step is executed a given number of times to create a plurality of weather scenarios.Type: ApplicationFiled: July 28, 2004Publication date: September 8, 2005Inventor: Masashi Egi
-
Publication number: 20050125249Abstract: Provided is a method of measuring the effect of investment in an IT system by calculating the correlation between data on profit derived from an IT system. Various time-series data collected from a business system are classified into a profit indicator (104), a business process progress status indicator (105), and a system operation status indicator (106), and the correlation between those data is found. From the correlation, a contribution ratio indicative of the influence of the IT system operation status on the profit is calculated, and the effect of investment in the IT system is measured based on this contribution ratio.Type: ApplicationFiled: November 10, 2004Publication date: June 9, 2005Inventors: Shunji Takubo, Ken Naono, Masashi Egi
-
Patent number: 6778929Abstract: Estimation method for obtaining estimation results of meteorological quantities in a specified area during a specified future period, including steps of: provisionally creating a meteorological time-series model from historical data of the meteorological quantities observed in the specified area; adjusting parameters of the created time-series model on the basis of long-range weather forecast data for wider area, which contains future meteorological tendency relative to normal years, to adjust the created time-series model; and conducting simulation using the adjusted time-series model to obtain the estimation results.Type: GrantFiled: May 20, 2003Date of Patent: August 17, 2004Assignee: Hitachi, Ltd.Inventor: Masashi Egi