  • Patent number: 10222788
    Abstract: A production plan for a second base is generated that is suited to the circumstances of the second base while making use of a first base's know-how about adjusting a production plan. A storage unit is configured to store plan adjustment knowledge regarding a plan adjustment that has been made to a production plan for the first base. A generation unit is configured to generate production adjustment knowledge regarding a production adjustment that has been made at the second base, which has a production management level different from that of the first base, based on production capacity and production performance of the second base. A planning unit is configured to generate a production plan for the second base based on the plan adjustment knowledge stored in the storage unit and on the production adjustment knowledge generated by the generation unit.
    Type: Grant
    Filed: August 31, 2016
    Date of Patent: March 5, 2019
    Assignee: Hitachi, Ltd.
    Inventors: Tazu Nomoto, Masayasu Uozaki
  • Patent number: 10037018
    Abstract: Provided is a production planning apparatus including: a storage unit configured to store: actual performance information on a resource required for production; a planning master including a plan of a resource required for work of the production; and a planning parameter including a variable required for a production plan; a parameter generation processing unit configured to change the plan of the resource required for the work, which is included in the planning master, based on a difference between the plan of the resource, which is included in the planning master, and actual performance of the resource required for the production, which is included in the actual performance information, and change the planning parameter based on how greatly the planning master is changed; and a production plan processing unit configured to calculate a production plan that uses the planning master and the planning parameter.
    Type: Grant
    Filed: January 27, 2016
    Date of Patent: July 31, 2018
    Assignee: Hitachi, Ltd.
    Inventors: Tazu Nomoto, Masayasu Uozaki
  • Publication number: 20170154290
    Abstract: The objective of the present invention is to reduce the calculation time in an interregional supply adjustment plan.
    Type: Application
    Filed: November 21, 2014
    Publication date: June 1, 2017
    Inventors: Tazu NOMOTO, Masayasu UOZAKI, Keiji MATSUMOTO
  • Publication number: 20170097634
    Abstract: A production plan for a second base is generated that is suited to the circumstances of the second base while making use of a first base's know-how about adjusting a production plan. A storage unit is configured to store plan adjustment knowledge regarding a plan adjustment that has been made to a production plan for the first base. A generation unit is configured to generate production adjustment knowledge regarding a production adjustment that has been made at the second base, which has a production management level different from that of the first base, based on production capacity and production performance of the second base. A planning unit is configured to generate a production plan for the second base based on the plan adjustment knowledge stored in the storage unit and on the production adjustment knowledge generated by the generation unit.
    Type: Application
    Filed: August 31, 2016
    Publication date: April 6, 2017
    Applicant: HITACHI, LTD.
    Inventors: Tazu NOMOTO, Masayasu UOZAKI
  • Publication number: 20160282844
    Abstract: Provided is a production planning apparatus including: a storage unit configured to store: actual performance information on a resource required for production; a planning master including a plan of a resource required for work of the production; and a planning parameter including a variable required for a production plan; a parameter generation processing unit configured to change the plan of the resource required for the work, which is included in the planning master, based on a difference between the plan of the resource, which is included in the planning master, and actual performance of the resource required for the production, which is included in the actual performance information, and change the planning parameter based on how greatly the planning master is changed; and a production plan processing unit configured to calculate a production plan that uses the planning master and the planning parameter.
    Type: Application
    Filed: January 27, 2016
    Publication date: September 29, 2016
    Inventors: Tazu NOMOTO, Masayasu UOZAKI
  • Patent number: 7624043
    Abstract: In a physical distribution model of the circulation type, synchronization is established between a reuse plan and a delivery/fabrication plan to thereby reasonably reduce the excess and deficiency of inventory articles at a confluence point of regenerated reusable articles and newly delivered component parts. With regard to newly delivered lower-level items, predict a variation or fluctuation of stock quantity based on at least a delivery schedule of them and a present stock amount along with usage plans in manufacturing processes. As for lower-level items of regenerated articles, predict a delivery due date and an expected number of such regenerated lower-level items based on at least a stock quantity of recovered items collected for reuse purposes and a lead time for taking regenerated lower-level items out of the collected items, thereby controlling, based on the both prediction results, the stock quantity of the lower-level items in manufacturing processes.
    Type: Grant
    Filed: January 30, 2004
    Date of Patent: November 24, 2009
    Assignee: Hitachi, Ltd.
    Inventors: Toshiyuki Sakuma, Mitsuhiro Enomoto, Yuzo Hiroshige, Kunio Kumamoto, Hideyuki Sasaki, Masayasu Uozaki
  • Publication number: 20040254841
    Abstract: In a physical distribution model of the circulation type, synchronization is established between a reuse plan and a delivery/fabrication plan to thereby reasonably reduce the excess and deficiency of inventory articles at a confluence point of regenerated reusable articles and newly delivered component parts. With regard to newly delivered lower-level items, predict a variation or fluctuation of stock quantity based on at least a delivery schedule of them and a present stock amount along with usage plans in manufacturing processes. As for lower-level items of regenerated articles, predict a delivery due date and an expected number of such regenerated lower-level items based on at least a stock quantity of recovered items collected for reuse purposes and a lead time for taking regenerated lower-level items out of the collected items, thereby controlling, based on the both prediction results, the stock quantity of the lower-level items in manufacturing processes.
    Type: Application
    Filed: January 30, 2004
    Publication date: December 16, 2004
    Applicant: Hitachi, Ltd.
    Inventors: Toshiyuki Sakuma, Mitsuhiro Enomoto, Yuzo Hiroshige, Kunio Kumamoto, Hideyuki Sasaki, Masayasu Uozaki