Patents by Inventor Matthias WIMMER

Matthias WIMMER has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Publication number: 20240242544
    Abstract: The present invention relates to a system (100) for monitoring the processes performed by at least one machine (14, 16, 18, 20) and the process environment, the at least one machine (14, 16, 18, 20) being applicable on a construction site and/or in mining, the system (100) comprising: at least one sensor unit (10), the at least one sensor unit (10) being configured to determine information relating to the at least one machine (14, 16, 18, 20), the information determined by the at least one sensor unit (10) comprising at least one item of information from the following group: Position information of the machine (14, 16, 18, 20), at least one speed value in at least one direction, at least one acceleration value in at least one direction, at least one camera (22, 24, 26, 28) generating image data comprising at least a portion of the at least one machine (14, 16, 18, 20) and/or at least a section of the process environment of the at least one machine (14, 16, 18, 20), and at least one evaluation unit (12), the a
    Type: Application
    Filed: May 6, 2022
    Publication date: July 18, 2024
    Applicant: ABAUT GMBH
    Inventors: Markus Häupl, Matthias Wimmer, Sebastian Kaluza, Max-David Falkner
  • Publication number: 20230228193
    Abstract: The present invention relates to a Raise Caving mining method for mining ore from an ore body comprising developing at least two slots (3a, 3b) in a rock mass and leaving a pillar (9a) of rock mass to separate adjacent slots (3a, 3b) in order to create a favourable stress environment in the rock mass to provide protection for mining infrastructure, developing at least one production raise (6a) within the rock mass providing the favourable stress environment, mining by progressing upwards at least one production stope (13a) from the at least one production raise (6a), and drawing ore from the production stope (13a). The present invention also relates to a Raise Caving mining infrastructure, a machinery, a monitoring system, an automatic or semi-automatic control system of a Raise Caving mining infrastructure, and a data medium.
    Type: Application
    Filed: May 20, 2021
    Publication date: July 20, 2023
    Inventors: Horst WAGNER, Tobias LADINIG, Matthias WIMMER
  • Publication number: 20230203946
    Abstract: The present invention relates to an integrated raise caving mining method for mining deposits in rock mass comprising: developing at least one raise (102,102a-f,202,302a-g,402a-e) in the rock mass (10), developing a drawbell (100,100a-c, 200a-g,300a-f,400a-e) in the rock mass (10), wherein at least a portion of the drawbell is excavated from the at least one raise (102,102a-f,202,302a-g,402a-e), initiating caving through undercutting, wherein at least a part of an undercut is created by gradually expanding the drawbell (100,100a-c, 200a-g,300a-f,400a-e) in upwards direction by excavation, developing at least two drawpoints (106,206,406) into the drawbell (100,100a-c, 200a-g,300a-f,400a-e), wherein the drawpoints (106) are developed from drifts (115,207,407) arranged on different levels and progressively drawing fragmented rock (101) from the at least one drawbell through the drawpoints (106,206,406).
    Type: Application
    Filed: May 20, 2021
    Publication date: June 29, 2023
    Inventors: Horst WAGNER, Tobias LADINIG, Matthias WIMMER