Publication number: 20050080892
Abstract: A method for predicting a development over time of a system quantity (WP, 41, 42, 43, 44, 6) of a system (2), to which a number of system quantities (WP, 41, 42, 43, 44, 6) are assigned, a sequence of one of the system quantities (WP, 41, 42, 43, 44, 6) in each case being characterized by at least one event, wherein a delay of the at least one event is detected. On this basis, at least one actual value (I) over time for at least one event of at least one system quantity (WP, 41, 42, 43, 44, 6) is calculated within one measurement period to be predicted. The present invention makes it possible to provide a prediction of the system (2) or of one or a plurality of system quantities (WP, 41, 42, 43, 44, 6) based on flexible measurement periods. A future development of the system (2) or of the at least one system quantity (WP, 41, 42, 43, 44, 6) may not only be estimated roughly but instead may be calculated reliably under consideration of measurable data.
Type:
Application
Filed:
September 16, 2004
Publication date:
April 14, 2005
Inventors:
Manfred Moser, Sonja Fritze, Michael Pfeiffer