Patents by Inventor Mikhail Yurevich Zotov

Mikhail Yurevich Zotov has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 10668550
    Abstract: The invention relates to the field of construction, particularly to welding of above- and underground high-strength pipelines with controlled heat input. Application of the invention will increase the load-bearing capacity of the pipelines made with the use of butt-welded pipes, pipe spools, pipe strings. The method includes joining of two or more cylindrical metal pipes, pipe spools and pipe strings by the welded ring butt with the use of the arc welding for the whole perimeter of the pipe. Criteria for a high-quality welded joint include optimal selection of parameters of the welding thermic cycle. The suggested welding method allows to have the optimal structure, high strength and viscoplastic properties in areas of the welded joint, to provide for the required load-bearing capacity of the pipeline and its reliability during operation.
    Type: Grant
    Filed: August 4, 2016
    Date of Patent: June 2, 2020
    Assignees: Public Joint Stock Company “Transneft”, Joint-Stock Company “Transneft Siberia”, L.L.C. Transneft Research and Development Institute for Oil and Oil Products Transportation
    Inventors: Pavel Aleksandrovich Revel-Muroz, Alexander Nikolaevich Chentsov, Oleg Igorevich Kolesnikov, Nikolay Georgievich Goncharov, Mikhail Yurevich Zotov, Pavel Ivanovich Shoter
  • Patent number: 10100486
    Abstract: A method for installing pile foundations for power transmission towers or the like in different types of soil prone to frost heaving provides piles with bearing capacity against horizontal loads, reduced labor content and installation cost, and increased reliability against the impact of frost heaving forces of the soil on the pile. A casing pipe is driven in and then the pile is inserted into it, while installing rigid elements on the pile shaft by welding. When driving the pile, when a mark indicating a point of installation for a rigid element reaches the top of the casing pipe, a geometric measurement of gaps is made between the casing pipe and the pile. Based on the measurement, rigid elements are sized and welded in pairs on the opposite side in a vertical plane. The operation of placing and welding is then repeated during the pipe inserting.
    Type: Grant
    Filed: August 2, 2016
    Date of Patent: October 16, 2018
    Assignees: Public Joint Stock Company “Transneft”, Joint-Stock Company “Transneft Siberia”, L.L.C. “Transneft Research and Development Institute for Oil and Oil Products Transportation”
    Inventors: Pavel Aleksandrovich Revel-Muroz, Nikolai Vladimirovich Smirnov, Vitaly Aleksandrovich Kumallagov, Evgenii Evgenievich Semin, Alexandr Vladimirovich Ivakin, Yury Vasilevich Bogatenkov, Mikhail Yurevich Zotov
  • Publication number: 20160375518
    Abstract: The invention relates to the field of construction, particularly to welding of above- and underground high-strength pipelines with controlled heat input. Application of the invention will increase the load-bearing capacity of the pipelines made with the use of butt-welded pipes, pipe spools, pipe strings. The method includes joining of two or more cylindrical metal pipes, pipe spools and pipe strings by the welded ring butt with the use of the arc welding for the whole perimeter of the pipe. Criteria for a high-quality welded joint include optimal selection of parameters of the welding thermic cycle. The suggested welding method allows to have the optimal structure, high strength and viscoplastic properties in areas of the welded joint, to provide for the required load-bearing capacity of the pipeline and its reliability during operation.
    Type: Application
    Filed: August 4, 2016
    Publication date: December 29, 2016
    Inventors: Pavel Aleksandrovich Revel-Muroz, Alexander Nikolaevich Chentsov, Oleg Igorevich Kolesnikov, Nikolay Georgievich Goncharov, Mikhail Yurevich Zotov, Pavel Ivanovich Shoter
  • Publication number: 20160340858
    Abstract: A method for installing pile foundations for power transmission towers or the like in different types of soil prone to frost heaving provides piles with bearing capacity against horizontal loads, reduced labor content and installation cost, and increased reliability against the impact of frost heaving forces of the soil on the pile. A casing pipe is driven in and then the pile is inserted into it, while installing rigid elements on the pile shaft by welding. When driving the pile, when a mark indicating a point of installation for a rigid element reaches the top of the casing pipe, a geometric measurement of gaps is made between the casing pipe and the pile. Based on the measurement, rigid elements are sized and welded in pairs on the opposite side in a vertical plane. The operation of placing and welding is then repeated during the pipe inserting.
    Type: Application
    Filed: August 2, 2016
    Publication date: November 24, 2016
    Inventors: Pavel Aleksandrovich Revel-Muroz, Nikolai Vladimirovich Smirnov, Vitaly Aleksandrovich Kumallagov, Evgenii Evgenievich Semin, Alexandr Vladimirovich Ivakin, Yury Vasilevich Bogatenkov, Mikhail Yurevich Zotov