Patents by Inventor Mitchell Wills

Mitchell Wills has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Publication number: 20070260497
    Abstract: A method of optimizing the movement of plural trains using a front end cost function that evaluates the costs of each railcar in the consist of a train.
    Type: Application
    Filed: May 2, 2006
    Publication date: November 8, 2007
    Inventors: Wolfgang Daum, Randall Markley, Paul Julich, Mitchell Wills, John Hershey
  • Publication number: 20070260369
    Abstract: A method of planning the movement of plural trains through a rail network using a database of dynamic planning attributes reflecting the current conditions of the train and rail network.
    Type: Application
    Filed: May 2, 2006
    Publication date: November 8, 2007
    Inventors: Joseph Philp, Mitchell Wills, Joanne Maceo, Joel Kickbusch, Randall Markley
  • Publication number: 20070260367
    Abstract: A method of planning the movement of plural trains over a train network utilizing route protection for the route immediately ahead of a train to avoid undesirable changes to the planned route of the train.
    Type: Application
    Filed: May 2, 2006
    Publication date: November 8, 2007
    Inventors: Mitchell Wills, Joanne Maceo, Randall Markley, Joel Kickbusch, Erdem Telatar
  • Publication number: 20070260368
    Abstract: A scheduling system and method for identifying and planning for the linked movement of two or more trains.
    Type: Application
    Filed: May 2, 2006
    Publication date: November 8, 2007
    Inventors: Joseph Philp, Mitchell Wills
  • Publication number: 20070005200
    Abstract: A system and method for generating a computer-aided rail yard plan for the movement of plural railcars through a rail yard, the rail yard having tracks that are used as receiving tracks, classification tracks and departure tracks and the plural railcars arriving on inbound trains and departing on outbound trains, the plural railcars required to undergo a sequence of tasks to move through the rail yard, the yard plan providing (a) a schedule for receiving trains, (b) a schedule for inspecting cars on receiving tracks, (c) a schedule for humping cars from receiving tracks into classification tracks, (d) a schedule for pulling trains onto departure tracks, (e) a schedule for testing trains, and (f) a schedule for departing trains.
    Type: Application
    Filed: March 14, 2006
    Publication date: January 4, 2007
    Inventors: Mitchell Wills, Srinivas Bollapragada, Joanne Maceo, Prescott Logan
  • Publication number: 20060212190
    Abstract: A scheduling system and method for moving plural objects through a system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system. Train location reports used in the automatic updating of the movement plans are selectively disabled for individual trains as a function of the activity scheduled for that train.
    Type: Application
    Filed: January 31, 2006
    Publication date: September 21, 2006
    Inventors: Joseph Philp, Mitchell Wills, Darren Griffith
  • Publication number: 20060212188
    Abstract: A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system. Alternative routes through congested areas are automatically selected using congestion prediction metrics.
    Type: Application
    Filed: January 31, 2006
    Publication date: September 21, 2006
    Inventors: Joel Kickbusch, Joseph Philp, Mitchell Wills
  • Publication number: 20060212186
    Abstract: A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system, and is particularly useful in optimizing the value of trains moved against the penalty for postponement of maintenance of the right of way.
    Type: Application
    Filed: January 31, 2006
    Publication date: September 21, 2006
    Inventors: Joseph Philp, Mitchell Wills, Joanne Maceo
  • Publication number: 20060212187
    Abstract: A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system, and is particularly useful in managing the unpredictable movement of local industry trains.
    Type: Application
    Filed: January 31, 2006
    Publication date: September 21, 2006
    Inventors: Mitchell Wills, Joseph Philp, Joanne Maceo, Joel Kickbusch
  • Publication number: 20060212185
    Abstract: A scheduling system and method for moving plural objects through a system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system. The actual location where an activity is to be performed is automatically selected as a function of one or more specified criteria.
    Type: Application
    Filed: January 31, 2006
    Publication date: September 21, 2006
    Inventors: Joseph Philp, Mitchell Wills
  • Publication number: 20060212184
    Abstract: A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system. Similar movement planners exist for moving trains in yards or terminals. Coordination is achieved and system efficiency improved by interfacing the line of road and yard planners.
    Type: Application
    Filed: January 31, 2006
    Publication date: September 21, 2006
    Inventors: Joseph Philp, Mitchell Wills, Joanne Maceo
  • Publication number: 20060212183
    Abstract: A scheduling system and method for moving plural objects through a system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system. The estimation of the location of trains in track warranty locations where track sensor and GPS indications are not available is made based on the movement planners and the form-based movement authorities issued to each trains. Certain user interactions are interpreted as a specific train location.
    Type: Application
    Filed: January 31, 2006
    Publication date: September 21, 2006
    Inventors: Mitchell Wills, Brian Smith, Joanne Maceo, Randall Markley
  • Publication number: 20060212189
    Abstract: A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system. Deadlock is avoided by controlling the entry of trains into congested areas, and may be automatically implemented by the use of traffic flow analysis algorithms.
    Type: Application
    Filed: January 31, 2006
    Publication date: September 21, 2006
    Inventors: Joel Kickbusch, Randall Markley, Mitchell Wills, Joseph Philp