Patents by Inventor Mogens Bjerning

Mogens Bjerning has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 12612895
    Abstract: A method for controlling a renewable energy farm comprising a plurality of wind turbines and at least one central control unit is disclosed. The wind turbines of the renewable energy farm are connected to a power grid. The central control unit receives a request for change in operation of at least one of the wind turbines, where execution of the change in operation causes a change in power output of the wind turbine. The central control unit checks whether or not the change in power output is in conflict with at least one obligation of the renewable energy farm towards the power grid. In the case that the change in power output is in conflict with at least one obligation of the renewable energy farm towards the power grid, execution of the change in operation is deferred.
    Type: Grant
    Filed: January 12, 2022
    Date of Patent: April 28, 2026
    Assignee: VESTAS WIND SYSTEMS A/S
    Inventors: Kouroush Nayebi, Torsten Lund, Frank Ormel, Mogens Bjerning
  • Patent number: 11726232
    Abstract: A method for real-time prediction of wind conditions across a wind farm comprising a plurality of wind turbines, the wind farm being arranged at a wind farm site, is disclosed. A first library of site specific mean wind flow patterns related to the wind farm site, and a second library of non-site specific turbulence patterns, are provided. Weather data is measured at a plurality of positions within the wind farm site, and based on the measured weather data, a mean wind flow pattern is selected based on the first library and a turbulence pattern is selected based on the second library. A site specific wind flow field across the wind farm site is modelled, based on the selected mean wind flow pattern and the selected turbulence pattern, and wind conditions across the wind farm are predicted, based on the site specific wind flow field.
    Type: Grant
    Filed: December 14, 2022
    Date of Patent: August 15, 2023
    Assignee: VESTAS WIND SYSTEMS A/S
    Inventors: Ewan Machefaux, Kim Emil Andersen, Frank Ormel, Mogens Bjerning
  • Publication number: 20230184995
    Abstract: A method for real-time prediction of wind conditions across a wind farm comprising a plurality of wind turbines, the wind farm being arranged at a wind farm site, is disclosed. A first library of site specific mean wind flow patterns related to the wind farm site, and a second library of non-site specific turbulence patterns, are provided. Weather data is measured at a plurality of positions within the wind farm site, and based on the measured weather data, a mean wind flow pattern is selected based on the first library and a turbulence pattern is selected based on the second library. A site specific wind flow field across the wind farm site is modelled, based on the selected mean wind flow pattern and the selected turbulence pattern, and wind conditions across the wind farm are predicted, based on the site specific wind flow field.
    Type: Application
    Filed: December 14, 2022
    Publication date: June 15, 2023
    Inventors: Ewan Machefaux, Kim Emil Andersen, Frank Ormel, Mogens Bjerning
  • Publication number: 20220220938
    Abstract: A method for controlling a renewable energy farm comprising a plurality of wind turbines and at least one central control unit is disclosed. The wind turbines of the renewable energy farm are connected to a power grid. The central control unit receives a request for change in operation of at least one of the wind turbines, where execution of the change in operation causes a change in power output of the wind turbine. The central control unit checks whether or not the change in power output is in conflict with at least one obligation of the renewable energy farm towards the power grid. In the case that the change in power output is in conflict with at least one obligation of the renewable energy farm towards the power grid, execution of the change in operation is deferred.
    Type: Application
    Filed: January 12, 2022
    Publication date: July 14, 2022
    Inventors: Kouroush NAYEBI, Torsten Lund, Frank Ormel, Mogens Bjerning