Patents by Inventor Naoyuki Nagafuchi
Naoyuki Nagafuchi has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).
-
Patent number: 11833467Abstract: A boiler plant includes a carbon dioxide capture system. The carbon dioxide capture system has an absorbing-liquid regeneration device and an absorber. The absorbing-liquid regeneration device includes a regenerator, a first circulation line in which the absorbing liquid is taken out from the regenerator and is returned to the regenerator, and a second circulation line in which the absorbing liquid is taken out from the regenerator and is returned to the regenerator, a heat exchanger, a heater, and a switcher. The heat exchanger heats the absorbing liquid by exchanging heat between the absorbing liquid flowing through the first circulation line and steam from the boiler. The heater heats the absorbing liquid flowing in the second circulation line. The switcher switches between a first heating state, in which the absorbing liquid flows in the first circulation line, and a second heating state, in which the absorbing liquid flows in the second circulation line.Type: GrantFiled: December 7, 2020Date of Patent: December 5, 2023Assignees: MITSUBISHI HEAVY INDUSTRIES, LTD., MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.Inventors: Atsushi Tsutsumi, Hiromi Ishii, Tetsuya Tanaka, Naoyuki Nagafuchi, Takashi Kamijo
-
Patent number: 11795843Abstract: A gas turbine plant includes a gas turbine, an exhaust line, an exhaust heat recovery boiler that generates steam due to heat of exhaust gas and guides the exhaust gas to the exhaust line, a carbon dioxide recovery device that recovers carbon dioxide contained in the exhaust gas, a heat exchanger that cools the exhaust gas to a temperature set in advance, and a circulation line that branches from a position between the carbon dioxide recovery device and the heat exchanger and is connected to an inlet of the gas turbine. The carbon dioxide recovery device has an absorption tower that absorbs carbon dioxide contained in the exhaust gas by causing the exhaust gas at the set temperature and an absorption liquid to come into contact with each other. The heat exchanger is formed of a material having higher corrosion resistance than a material forming the exhaust heat recovery boiler.Type: GrantFiled: July 22, 2020Date of Patent: October 24, 2023Assignees: MITSUBISHI HEAVY INDUSTRIES, LTD., MITSUBSHI HEAVY INDUSTRIES ENGINEERING, LTD.Inventors: Atsushi Tsutsumi, Tetsuya Tanaka, Naoyuki Nagafuchi, Takashi Kamijo
-
Publication number: 20230258124Abstract: A gas turbine plant provided with a gas turbine; a waste heat recovery boiler which generates steam by exchanging heat between exhaust gas from the gas turbine and water; an absorption tower which recovers carbon dioxide contained in the exhaust gas; an EGR line which bleeds a portion of the exhaust gas and guides the same to the intake side of the gas turbine; an exhaust gas heater which uses steam extracted from the waste heat recovery boiler as a heat medium to heat the exhaust gas that has passed through the absorption tower, by exchanging heat between the heat medium and the exhaust gas; and an EGR heater which is provided on the EGR line, and which heats the exhaust gas passing through the EGR line by exchanging heat between the exhaust gas passing through the EGR line and the heat medium discharged from the exhaust gas heater.Type: ApplicationFiled: July 20, 2021Publication date: August 17, 2023Inventors: Hideyuki UECHI, Takashi SONODA, Kazunori TSUJII, Naoyuki NAGAFUCHI
-
Publication number: 20230021855Abstract: This exhaust gas processing equipment is provided with an exhaust line through which exhaust gas discharged from a boiler circulates, a carbon dioxide recovering device for recovering carbon dioxide included in the exhaust gas, and an exhaust gas heating device provided downstream of the carbon dioxide recovering device to heat the exhaust gas. The carbon dioxide recovering device includes a first medium line through which a first medium circulates, and a second medium line through which a second medium higher in temperature than the first medium circulates. The exhaust gas heating device includes a first heating unit for heating the exhaust gas by means of heat exchange with the first medium, and a second heating unit for heating the exhaust gas passing through the first heating unit even more by heat exchange with the second medium.Type: ApplicationFiled: November 24, 2020Publication date: January 26, 2023Inventors: Takashi KAMIJO, Atsushi TSUTSUMI, Hiromi ISHII, Takahiro ARAYA, Tetsuya TANAKA, Kazunori TSUJII, Naoyuki NAGAFUCHI
-
Patent number: 11555429Abstract: A gas turbine plant includes an exhaust line, a carbon dioxide recovery device configured to recover carbon dioxide contained in an exhaust gas, a circulation line connected to a gas turbine, a first valve device, a bypass line bypassing the carbon dioxide recovery device, a second valve device provided on the bypass line, a third valve device provided at a position between the bypass line and the carbon dioxide recovery device, a densitometer configured to detect a carbon dioxide concentration in the exhaust gas, and a control device configured to adjust opening degrees of the first valve device, the second valve device, and the third valve device based on an operation state of the gas turbine and the carbon dioxide concentration.Type: GrantFiled: January 31, 2020Date of Patent: January 17, 2023Assignees: MITSUBISHI HEAVY INDUSTRIES, LTD., MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.Inventors: Naoyuki Nagafuchi, Atsushi Tsutsumi, Takashi Kamijo, Hiroaki Shigeta
-
Publication number: 20220410062Abstract: Provided is a boiler plant including a carbon dioxide capture system. The carbon dioxide capture system has an absorbing-liquid regeneration device and an absorber. The absorbing-liquid regeneration device includes a regenerator, a first circulation line in which the absorbing liquid is taken out from the regenerator and is returned to the regenerator, and a second circulation line in which the absorbing liquid is taken out from the regenerator and is returned to the regenerator, a heat exchanger, a heater, and a switcher. The heat exchanger heats the absorbing liquid by exchanging heat between the absorbing liquid flowing through the first circulation line and steam from the boiler. The heater heats the absorbing liquid flowing in the second circulation line. The switcher switches between a first heating state in which the absorbing liquid flows in the first circulation line and a second heating state in which the absorbing liquid flows in the second circulation line.Type: ApplicationFiled: December 7, 2020Publication date: December 29, 2022Inventors: Atsushi TSUTSUMI, Hiromi ISHII, Tetsuya TANAKA, Naoyuki NAGAFUCHI, Takashi KAMIJO
-
Publication number: 20220326674Abstract: An arithmetic operation device includes a performance calculation unit that is configured to calculate performance of a plant before introduction of a part and the performance of the plant after the introduction of the part for each of combinations of a plurality of loads in the plant and a plurality of atmospheric temperatures around the plant, a storage unit that is configured to store a data table indicating a percentage of an operating time of the plant for each of the combinations, and a performance improvement calculation unit that is configured to calculate, on the basis of a calculation result in the performance calculation unit and the data table, how much the performance of the plant is improved compared with the performance before the introduction of the part in a case where the part is introduced and the plant is operated at the percentage indicated by the data table.Type: ApplicationFiled: June 26, 2020Publication date: October 13, 2022Inventors: Wataru NAGASAKA, Masayuki MURAKAMI, Itaru ENDO, Naoyuki NAGAFUCHI
-
Publication number: 20220228515Abstract: A gas turbine plant includes a gas turbine, an exhaust line, an exhaust heat recovery boiler that generates steam due to heat of exhaust gas and guides the exhaust gas to the exhaust line, a carbon dioxide recovery device that recovers carbon dioxide contained in the exhaust gas, a heat exchanger that cools the exhaust gas to a temperature set in advance, and a circulation line that branches from a position between the carbon dioxide recovery device and the heat exchanger and is connected to an inlet of the gas turbine. The carbon dioxide recovery device has an absorption tower that absorbs carbon dioxide contained in the exhaust gas by causing the exhaust gas at the set temperature and an absorption liquid to come into contact with each other. The heat exchanger is formed of a material having higher corrosion resistance than a material forming the exhaust heat recovery boiler.Type: ApplicationFiled: July 22, 2020Publication date: July 21, 2022Inventors: Atsushi TSUTSUMI, Tetsuya TANAKA, Naoyuki NAGAFUCHI, Takashi KAMIJO
-
Publication number: 20220136416Abstract: A gas turbine plant includes an exhaust line, a carbon dioxide recovery device configured to recover carbon dioxide contained in an exhaust gas, a circulation line connected to a gas turbine, a first valve device, a bypass line bypassing the carbon dioxide recovery device, a second valve device provided on the bypass line, a third valve device provided at a position between the bypass line and the carbon dioxide recovery device, a densitometer configured to detect a carbon dioxide concentration in the exhaust gas, and a control device configured to adjust opening degrees of the first valve device, the second valve device, and the third valve device based on an operation state of the gas turbine and the carbon dioxide concentration.Type: ApplicationFiled: January 31, 2020Publication date: May 5, 2022Inventors: Naoyuki NAGAFUCHI, Atsushi TSUTSUMI, Takashi KAMIJO, Hiroaki SHIGETA
-
Publication number: 20220123553Abstract: A system operator side computer includes: a supply amount acquirer configured to acquire a maximum suppliable power amount from a power generation operator at a predetermined time later; a demand specifier configured to specify a power demand at the predetermined time later; and a shortage amount calculator configured to calculate a power shortage amount based on the power demand and the maximum suppliable power amount.Type: ApplicationFiled: December 27, 2021Publication date: April 21, 2022Inventor: Naoyuki NAGAFUCHI
-
Patent number: 11274606Abstract: A control device for a two-shaft gas turbine power generation facility includes: a basic output calculation unit which obtains a basic output command value in accordance with a required output; a component separation unit which divides the basic output command value into high and low frequency components; an opening degree command output unit which obtains an opening degree of a fuel adjustment valve and outputs an opening degree command to the fuel adjustment valve; a basic power transmission and reception amount calculation unit which obtains a basic power transmission and reception amount of the electric power between an induction motor and a power system on the basis of the high-frequency component; and a power transmission and reception command output unit which outputs a power transmission and reception command indicating a power transmission and reception amount in accordance with the basic power transmission and reception amount to a frequency converter.Type: GrantFiled: February 22, 2019Date of Patent: March 15, 2022Assignee: MITSUBISHI POWER, LTD.Inventors: Kazuo Takahashi, Naoyuki Nagafuchi
-
Publication number: 20210398155Abstract: A computing device includes a fuel price identifying unit that is configured to identify, based on a load plan and information on prediction of weather conditions, a fuel price in a case where motive power of a cooling water cooling device is varied, and a balance identifying unit that is configured to identify, based on the selling price of the generated electric power and the fuel price, at least a balance that is greater than a balance obtained by generated electric power according to the load plan in a case where a current operation is continued.Type: ApplicationFiled: September 25, 2019Publication date: December 23, 2021Inventors: Hisashi SHIMO, Masayuki KATO, Michihiko IKEDA, Naoyuki NAGAFUCHI
-
Patent number: 11181045Abstract: Provided is a two-shaft gas turbine power generation equipment that includes: an induction motor which receives/transmits power from/to a power system; and a speed reducer that makes a rotational speed of a motor rotor of the induction motor lower than a rotational speed of a compressor rotor of a two-shaft gas turbine. The speed reducer includes: a compressor-side shaft; a motor-side shaft; a first compressor-side helical gear and a second compressor-side helical gear which are mounted on the compressor-side shaft; and a first motor-side helical gear and a second motor-side helical gear which are mounted on the motor-side shaft. The first compressor-side helical gear meshes with the first motor-side helical gear, and the second compressor-side helical gear meshes with the second motor-side helical gear.Type: GrantFiled: August 30, 2017Date of Patent: November 23, 2021Assignee: MITSUBISHI POWER, LTD.Inventors: Naoyuki Nagafuchi, Toshimitsu Morimoto, Kazuo Takahashi, Hironori Tsukidate
-
Patent number: 11174843Abstract: Solar thermal power generation equipment is equipped with a wind turbine, a compressor, a heat receiver that receives sunlight to heat a compressed medium from the compressor, a turbine driven by the compressed medium heated with the heat receiver, a power generator that performs power generation by driving of the turbine, a transmission mechanism that transmits the rotation of the wind turbine to the power generator, and a tower which supports these components. The wind turbine, the compressor, the turbine, and the power generator each constitute an array apparatus. The plurality of array apparatuses are arranged in a vertical direction.Type: GrantFiled: July 12, 2018Date of Patent: November 16, 2021Assignee: MITSUBISHI POWER, LTD.Inventors: Masahide Umaya, Masato Ota, Naoyuki Nagafuchi, Tadaharu Kishibe, Takahiro Marumoto, Masato Kurita
-
Patent number: 11060424Abstract: Provided is a solar thermal power generation facility that includes: a compressor; a medium heating heat receiver that receives sunlight and heats a compressed medium from the compressor; a turbine that is driven by the compressed medium heated by the medium heating heat receiver; a power generator that generates electric power by driving of the turbine; and a tower that supports these components. The compressor, the turbine, and the power generator are formed as arranged devices. A plurality of the arranged devices are aligned in a vertical direction.Type: GrantFiled: July 4, 2018Date of Patent: July 13, 2021Assignee: MITSUBISHI POWER, LTD.Inventors: Masahide Umaya, Masato Ota, Naoyuki Nagafuchi, Tadaharu Kishibe, Takahiro Marumoto, Masato Kurita
-
Publication number: 20200400079Abstract: A control device for a two-shaft gas turbine power generation facility includes: a basic output calculation unit which obtains a basic output command value in accordance with a required output; a component separation unit which divides the basic output command value into high and low frequency components; an opening degree command output unit which obtains an opening degree of a fuel adjustment valve and outputs an opening degree command to the fuel adjustment valve; a basic power transmission and reception amount calculation unit which obtains a basic power transmission and reception amount of the electric power between an induction motor and a power system on the basis of the high-frequency component; and a power transmission and reception command output unit which outputs a power transmission and reception command indicating a power transmission and reception amount in accordance with the basic power transmission and reception amount to a frequency converter.Type: ApplicationFiled: February 22, 2019Publication date: December 24, 2020Inventors: Kazuo TAKAHASHI, Naoyuki NAGAFUCHI
-
Publication number: 20200389025Abstract: A system operator side computer includes: a supply amount acquirer configured to acquire a maximum suppliable power amount from a power generation operator at a predetermined time later; a demand specifier configured to specify a power demand at the predetermined time later; and a shortage amount calculator configured to calculate a power shortage amount based on the power demand and the maximum suppliable power amount.Type: ApplicationFiled: November 19, 2018Publication date: December 10, 2020Inventor: Naoyuki NAGAFUCHI
-
Publication number: 20200277935Abstract: Solar thermal power generation equipment is equipped with a wind turbine, a compressor, a heat receiver that receives sunlight to heat a compressed medium from the compressor, a turbine driven by the compressed medium heated with the heat receiver, a power generator that performs power generation by driving of the turbine, a transmission mechanism that transmits the rotation of the wind turbine to the power generator, and a tower which supports these components. The wind turbine, the compressor, the turbine, and the power generator each constitute an array apparatus. The plurality of array apparatuses are arranged in a vertical direction.Type: ApplicationFiled: July 12, 2018Publication date: September 3, 2020Inventors: Masahide UMAYA, Masato OTA, Naoyuki NAGAFUCHI, Tadaharu KISHIBE, Takahiro MARUMOTO, Masato KURITA
-
Publication number: 20200182094Abstract: Provided is a solar thermal power generation facility that includes: a compressor; a medium heating heat receiver that receives sunlight and heats a compressed medium from the compressor; a turbine that is driven by the compressed medium heated by the medium heating heat receiver; a power generator that generates electric power by driving of the turbine; and a tower that supports these components. The compressor, the turbine, and the power generator are formed as arranged devices. A plurality of the arranged devices are aligned in a vertical direction.Type: ApplicationFiled: July 4, 2018Publication date: June 11, 2020Applicant: Mitsubishi Hitachi Power Systems, Ltd.Inventors: Masahide Umaya, Masato Ota, Naoyuki Nagafuchi, Tadaharu Kishibe, Takahiro Marumoto, Masato Kurita
-
Patent number: 10637341Abstract: A two-shaft gas turbine facility includes a two-shaft gas turbine, an induction motor connected to a compressor of the two-shaft gas turbine, a secondary battery, a first frequency converter that controls power transmission and reception between a power system and the induction motor, and a second frequency converter that controls charging and discharging of power between the secondary battery and the power system. A first control unit of a control device causes power transmission and reception to be performed between the induction motor and the power system by the first frequency converter if a required output change rate is higher than a maximum output change rate. A second control unit causes the secondary battery to be charged and discharged by the second frequency converter if power to be transmitted to and received from the induction motor has reached maximum allowable power.Type: GrantFiled: July 21, 2017Date of Patent: April 28, 2020Assignee: MITSUBISHI POWER SYSTEMS, LTD.Inventors: Naoyuki Nagafuchi, Toshimitsu Morimoto, Kazuo Takahashi, Atsushi Tsutsumi