Patents by Inventor Oluropo Rufus Ayodele

Oluropo Rufus Ayodele has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 9051829
    Abstract: A system for treating a subsurface formation includes a plurality of conduits at least partially located in a portion of a hydrocarbon containing formation. At least part of two of the conduits are aligned in relation to each other such that electrical current will flow from a first conduit to a second conduit. The first and second conduits include electrically conductive material and at least one of the first and second conduits is perforated or configured to be perforated. A power supply is coupled to the first and second conduits. The power supply electrically excites at least one of the conductive sections such that current flows between the first conduit and the second conduit in the formation and heats at least a portion of the formation between the two conduits.
    Type: Grant
    Filed: October 9, 2009
    Date of Patent: June 9, 2015
    Assignee: Shell Oil Company
    Inventors: Xueying Xie, Oluropo Rufus Ayodele, Harold J. Vinegar, Christopher Kelvin Harris, John Michael Karanikas, Chester Ledlie Sandberg, Dhruv Arora
  • Patent number: 8881806
    Abstract: A system for treating a subsurface formation includes a wellbore at least partially located in a hydrocarbon containing formation. The wellbore includes a substantially vertical portion and at least two substantially horizontal or inclined portions coupled to the vertical portion. A first conductor is at least partially positioned in a first of the two substantially horizontal or inclined portions of the wellbore. At least the first conductor includes electrically conductive material. A power supply electrically excites the electrically conductive materials of the first conductor such that current flows between the electrically conductive materials in the first conductor, through at least a portion of the formation, to a second conductor at least partially positioned in a second of the two substantially horizontal or inclined portions of the wellbore. The current resistively heats at least a portion of the formation between the two substantially horizontally oriented or inclined portions of the wellbore.
    Type: Grant
    Filed: October 9, 2009
    Date of Patent: November 11, 2014
    Assignee: Shell Oil Company
    Inventors: Xueying Xie, Oluropo Rufus Ayodele, Harold J. Vinegar, Christopher Kelvin Harris, John Michael Karanikas, Chester Ledlie Sandberg, Dhruv Arora
  • Patent number: 8851170
    Abstract: A method for treating a tar sands formation includes providing heat from a first heater located between a steam injection well and a production well in a hydrocarbon containing layer. The first heater, the steam injection well, and the production well are located substantially horizontally in the layer. Heat is provided from a second heater horizontally offset from the first heater. The second heater is located vertically above an injection/production well and substantially horizontally in the layer. Steam is injected into the layer through the steam injection well after a selected amount of heat is provided from the first heater. Hydrocarbons are produced from the layer through the production well. Steam is injected and hydrocarbons are produced alternately through the injection/production well after a selected amount of heat is provided from the second heater.
    Type: Grant
    Filed: April 9, 2010
    Date of Patent: October 7, 2014
    Assignee: Shell Oil Company
    Inventors: Oluropo Rufus Ayodele, Tulio Rafael Colmenares, Deniz Sumnu Dindoruk, John Michael Karanikas, Henry Eduardo Pino, Sr.
  • Publication number: 20100258309
    Abstract: A method for treating a tar sands formation includes providing heat from a first heater located between a steam injection well and a production well in a hydrocarbon containing layer. The first heater, the steam injection well, and the production well are located substantially horizontally in the layer. Heat is provided from a second heater horizontally offset from the first heater. The second heater is located vertically above an injection/production well and substantially horizontally in the layer. Steam is injected into the layer through the steam injection well after a selected amount of heat is provided from the first heater. Hydrocarbons are produced from the layer through the production well. Steam is injected and hydrocarbons are produced alternately through the injection/production well after a selected amount of heat is provided from the second heater.
    Type: Application
    Filed: April 9, 2010
    Publication date: October 14, 2010
    Inventors: Oluropo Rufus Ayodele, Tulio Rafael Colmenares, Deniz Sumnu Dindoruk, John Michael Karanikas, Henry Eduardo Pino, SR.
  • Publication number: 20100147521
    Abstract: A system for treating a subsurface formation includes a plurality of conduits at least partially located in a portion of a hydrocarbon containing formation. At least part of two of the conduits are aligned in relation to each other such that electrical current will flow from a first conduit to a second conduit. The first and second conduits include electrically conductive material and at least one of the first and second conduits is perforated or configured to be perforated. A power supply is coupled to the first and second conduits. The power supply electrically excites at least one of the conductive sections such that current flows between the first conduit and the second conduit in the formation and heats at least a portion of the formation between the two conduits.
    Type: Application
    Filed: October 9, 2009
    Publication date: June 17, 2010
    Inventors: Xueying Xie, Oluropo Rufus Ayodele, Harold J. Vinegar, Christopher Kelvin Harris, John Michael Karanikas, Chester Ledlie Sandberg, Dhruv Arora
  • Publication number: 20100147522
    Abstract: A system for treating a subsurface formation includes a wellbore at least partially located in a hydrocarbon containing formation. The wellbore includes a substantially vertical portion and at least two substantially horizontal or inclined portions coupled to the vertical portion. A first conductor is at least partially positioned in a first of the two substantially horizontal or inclined portions of the wellbore. At least the first conductor includes electrically conductive material. A power supply electrically excites the electrically conductive materials of the first conductor such that current flows between the electrically conductive materials in the first conductor, through at least a portion of the formation, to a second conductor at least partially positioned in a second of the two substantially horizontal or inclined portions of the wellbore. The current resistively heats at least a portion of the formation between the two substantially horizontally oriented or inclined portions of the wellbore.
    Type: Application
    Filed: October 9, 2009
    Publication date: June 17, 2010
    Inventors: Xueying Xie, Oluropo Rufus Ayodele, Harold J. Vinegar, Christopher Kelvin Harris, John Michael Karanikas, Chester Ledlie Sandberg, Dhruv Arora