  • Publication number: 20250137476
    Abstract: The invention relates to a hydraulic system, method, and integrated valve block for a slewing mechanism, comprising a first and second cylinder. The rod cavity of the first cylinder connects to the rodless cavity of the second cylinder through the first oil circuit, first hydraulic control check valve, and fourth oil circuit. The rodless cavity of the first cylinder connects to the rod cavity of the second cylinder through the second oil circuit, second hydraulic control check valve, and third oil circuit. The first oil circuit is connected to the directional valve through the sixth oil circuit, and the second oil circuit is connected to the directional valve through the fifth oil circuit. The directional valve is connected to the hydraulic pump and oil tank. The first hydraulic control check valve is installed between the first and fourth oil circuits, and the second hydraulic control check valve is between the second and third oil circuits.
    Type: Application
    Filed: July 9, 2024
    Publication date: May 1, 2025
    Applicant: SHANDONG UNIVERSITY
    Inventors: Lei LI, Bin ZOU, Jikai LIU, Peizhi ZHUANG, Chengyu LI
  • Publication number: 20250092627
    Abstract: The present invention relates to pile foundations and provides an intelligent construction control method and system for jet grouting piles based on stratum information inversion. This method integrates multi-source sensing components and local transmission to perceive real-time drilling information to a data integration terminal. Using engineering soil layer data as training samples, a machine learning algorithm correlates perception information with geological conditions, judging and outputting stratum conditions in real time. An XGBoost model quickly and accurately identifies soil layers at the site. Based on big data matching of a cloud platform, an optimal construction parameter database is established, and the optimal combination of parameters is acquired through algorithm matching.
    Type: Application
    Filed: July 4, 2024
    Publication date: March 20, 2025
    Applicants: SHANDONG UNIVERSITY, SHANDONG JIANZHU UNIVERSITY
    Inventors: Peizhi ZHUANG, Kangxu WANG, He YANG, Jingjing YIN, Xiuguang SONG, Chaoji LI, Chong ZHOU, Yuanshun QIAN, Chao LI, Mingpeng LIU
  • Patent number: 11773560
    Abstract: A poor foundation reinforcement system and a reinforcement method based on underground concealed arch structures are provided. The system and the method belong to the technical field of poor foundation treatment. The reinforcement system includes multiple columns of pile foundations arranged along a bridge direction. Multiple arch sheets are set in parallel between each two adjacent columns of pile foundations. Each arch sheet includes multiple high-pressure rotary jet piles arranged along the bridge. Each two adjacent arch sheets of the multiple arch sheets are connected by a micro-bending slab disposed on the two adjacent arch sheets, the multiple arch sheets are connected by the micro-bending slabs to together form an arch ring, and a construction joint is disposed between each two adjacent micro-bending slabs of the micro-bending slabs.
    Type: Grant
    Filed: February 15, 2023
    Date of Patent: October 3, 2023
    Assignees: SHANDONG UNIVERSITY, SHANDONG HI-SPEED GROUP CO., LTD.
    Inventors: Renjuan Sun, Chuan Wang, Yanhua Guan, Yonghao Li, Peizhi Zhuang, Huaqiang Yuan, Hongzhi Zhang, Linglai Bu, Yifan Li, Yuhe Tian, Lin Wang
  • Publication number: 20230279632
    Abstract: A poor foundation reinforcement system and a reinforcement method based on underground concealed arch structures are provided. The system and the method belong to the technical field of poor foundation treatment. The reinforcement system includes multiple columns of pile foundations arranged along a bridge direction. Multiple arch sheets are set in parallel between each two adjacent columns of pile foundations. Each arch sheet includes multiple high-pressure rotary jet piles arranged along the bridge. Each two adjacent arch sheets of the multiple arch sheets are connected by a micro-bending slab disposed on the two adjacent arch sheets, the multiple arch sheets are connected by the micro-bending slabs to together form an arch ring, and a construction joint is disposed between each two adjacent micro-bending slabs of the micro-bending slabs.
    Type: Application
    Filed: February 15, 2023
    Publication date: September 7, 2023
    Inventors: Renjuan Sun, Chuan Wang, Yanhua Guan, Yonghao Li, Peizhi Zhuang, Huaqiang Yuan, Hongzhi Zhang, Linglai Bu, Yifan Li, Yuhe Tian, Lin Wang