Patents by Inventor Qinghong Dong

Qinghong Dong has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11753935
    Abstract: A directional drilling-exploring-monitoring integrated method for guaranteeing safety of an underwater shield tunnel includes: drilling a small-diameter borehole below a water area, and establishing an initial geological model; reaming the small-diameter borehole into a large-diameter borehole, placing a parallel electrical method (PEM) power cable and a monitoring optical fiber cable into the large-diameter borehole, acquiring zero field data, primary field data and secondary field data through carbon rod measurement electrodes before tunnel excavation, and processing the data with an existing inversion method to form an inversion image, thereby obtaining a refined geological model of a stratum; starting the tunnel excavation, and respectively acquiring a disturbance condition of rock and soil and a sedimentation and deformation condition of rock and soil around the tunnel during the excavation, thereby implementing safety excavation of the tunnel; and continuously monitoring the tunnel and the surrounding r
    Type: Grant
    Filed: October 4, 2021
    Date of Patent: September 12, 2023
    Assignee: China University of Mining and Technology
    Inventors: Bo Wang, Xiaozhao Li, Guanqun Zhou, Fuqing Li, Qinghong Dong, Ziwei Qian, Siyuan Hu, Hongyun Chen
  • Publication number: 20230051333
    Abstract: A directional drilling-exploring-monitoring integrated method for guaranteeing safety of an underwater shield tunnel includes: drilling a small-diameter borehole below a water area, and establishing an initial geological model; reaming the small-diameter borehole into a large-diameter borehole, placing a parallel electrical method (PEM) power cable and a monitoring optical fiber cable into the large-diameter borehole, acquiring zero field data, primary field data and secondary field data through carbon rod measurement electrodes before tunnel excavation, and processing the data with an existing inversion method to form an inversion image, thereby obtaining a refined geological model of a stratum; starting the tunnel excavation, and respectively acquiring a disturbance condition of rock and soil and a sedimentation and deformation condition of rock and soil around the tunnel during the excavation, thereby implementing safety excavation of the tunnel; and continuously monitoring the tunnel and the surrounding r
    Type: Application
    Filed: October 4, 2021
    Publication date: February 16, 2023
    Inventors: Bo Wang, Xiaozhao Li, Guanqun Zhou, Fuqing Li, Qinghong Dong, Ziwei Qian, Siyuan Hu, Hongyun Chen