Patents by Inventor Qingxi ZENG

Qingxi ZENG has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 10557248
    Abstract: The present application relates to the field of immersed tube jointing, and more particularly relates to a post-grouting method for an immersed tube joint base. The post-grouting method includes the following steps: before locked backfilling of immersed tubes to be implanted, disposing a grouting tube capable of outputting solidifiable slurry in a furrow below immersed tubes; and after the locked backfilling, grouting the immersed tubes by using the grouting tube. For the purposes of adjusting postures and heights of the immersed tubes in case of abnormal settlement during installation, solving the problems on the stabilities and the service lives of immersed tube joints due to settlement of gravel mattresses or a geologic structure thereunder after installation, and enabling the immersed tubes to achieve a better bearing effect on a load during use, the present application provides the post-grouting method for the immersed tube joint base.
    Type: Grant
    Filed: January 12, 2018
    Date of Patent: February 11, 2020
    Assignees: CCCC Highway Consultants Co. Ltd., China Communication 2nd Navigational Bureau 2nd Engineering Co., Ltd., The Second Harbor Engineering Company
    Inventors: Wei Lin, Jibing Gao, Heng Liang, Kexin Liu, Li Wang, Changcheng Wei, Yu Liu, Bin Wu, Chao Liu, Yuwen Li, Qingxi Zeng, Wei Feng, Kaikai Li
  • Publication number: 20190063031
    Abstract: The present application relates to the field of immersed tube jointing, and more particularly relates to a post-grouting method for an immersed tube joint base. The post-grouting method includes the following steps: before locked backfilling of immersed tubes to be implanted, disposing a grouting tube capable of outputting solidifiable slurry in a furrow below immersed tubes; and after the locked backfilling, grouting the immersed tubes by using the grouting tube. For the purposes of adjusting postures and heights of the immersed tubes in case of abnormal settlement during installation, solving the problems on the stabilities and the service lives of immersed tube joints due to settlement of gravel mattresses or a geologic structure thereunder after installation, and enabling the immersed tubes to achieve a better bearing effect on a load during use, the present application provides the post-grouting method for the immersed tube joint base.
    Type: Application
    Filed: January 12, 2018
    Publication date: February 28, 2019
    Inventors: Wei LIN, Jibing GAO, Heng LIANG, Kexin LIU, Li WANG, Changcheng WEI, Yu LIU, Bin WU, Chao LIU, Yuwen LI, Qingxi ZENG, Wei FENG, Kaikai LI