Patents by Inventor Rainer Newald

Rainer Newald has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Publication number: 20140305132
    Abstract: A method for starting a gas and steam turbine system which includes a gas turbine system which includes at least one gas turbine, in addition to at least one steam turbine system which includes at least one steam turbine and at least one steam system is provided. Heat produced by the working fluid and which is released in the gas turbine is guided to the steam system in order to produce steam which drives the steam turbine. During starting, the gas turbine is started prior to the steam turbine and the steam turbine is started in the presence of the first steam in the system and is impinged upon by said steam.
    Type: Application
    Filed: June 26, 2014
    Publication date: October 16, 2014
    Inventors: Edwin Gobrecht, Rainer Newald, Erich Schmid
  • Patent number: 8800297
    Abstract: The invention relates to a method for starting a gas and steam turbine system which comprises a gas turbine system which comprises at least one gas turbine, in addition to at least one steam turbine system which comprises at least one steam turbine and at least one steam system. Heat produced by the working fluid and which is released in the gas turbine is guided to the steam system in order to produce steam which drives the steam turbine. According to the invention, during starting, the gas turbine is started prior to the steam turbine and the steam turbine is started in the presence of the first steam in the system and is impinged upon by said steam.
    Type: Grant
    Filed: March 31, 2006
    Date of Patent: August 12, 2014
    Assignee: Siemens Aktiengesellschaft
    Inventors: Edwin Gobrecht, Rainer Newald, Erich Schmid
  • Patent number: 8090545
    Abstract: A method for prior determination of a life consumption of individual components in a fossil-fuelled power generating installation, with respect to a load cycling process to be carried out is provided. An apparatus is also provided for prior determination of a life consumption of individual components in a fossil-fuelled power generating installation, with respect to a load cycling process to be carried out. Actual variables which characterize the state of the power generating installation before a load cycling process are determined. A driving gear of the power generating installation which creates the load cycling process is set in advance. The load cycle time is calculated based upon the driving gear and the characterizing variables. A predicted life consumption for at least one of the individual components for the selected driving gear is also calculated.
    Type: Grant
    Filed: September 21, 2006
    Date of Patent: January 3, 2012
    Assignee: Siemens Aktiengellschaft
    Inventors: Edwin Gobrecht, Rainer Newald, Eva Windecker
  • Publication number: 20090211259
    Abstract: The invention relates to a method for starting a gas and steam turbine system which comprises a gas turbine system which comprises at least one gas turbine, in addition to at least one steam turbine system which comprises at least one steam turbine and at least one steam system. Heat produced by the working fluid and which is released in the gas turbine is guided to the steam system in order to produce steam which drives the steam turbine. According to the invention, during starting, the gas turbine is started prior to the steam turbine and the steam turbine is started in the presence of the first steam in the system and is impinged upon by said steam.
    Type: Application
    Filed: March 31, 2006
    Publication date: August 27, 2009
    Inventors: Edwin Gobrecht, Rainer Newald, Erich Schmid
  • Publication number: 20090138211
    Abstract: There is described a method for prior determination of a life consumption of individual components in a fossil-fuelled power generating installation, with respect to a load cycling process to be carried out. An apparatus can be provided for prior determination of a life consumption of individual components in a fossil-fuelled power generating installation, with respect to a load cycling process to be carried out. Actual variables which characterize the state of the power generating installation before a load cycling process are determined. A driving gear of the power generating installation which creates the load cycling process is set in advance. The load cycle time is calculated based upon the driving gear and the characterizing variables. A predicted life consumption for at least one of the individual components for the selected driving gear is also calculated.
    Type: Application
    Filed: September 21, 2006
    Publication date: May 28, 2009
    Inventors: Edwin Gobrecht, Rainer Newald, Eva Windecker