Patents by Inventor Robert Benjamin Donnally
Robert Benjamin Donnally has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).
-
Patent number: 12606423Abstract: A tower crane for performing a lifting a load includes an extendable tower assembly having a central axis and including a plurality of separate tower sections, a climbing assembly including a climbing frame positioned on the tower assembly and a latching assembly to transport the climbing assembly vertically along the tower assembly, and a boom assembly atop the tower assembly and including a crane floor, a boom supported on the crane floor, a lifting member coupled to the boom, and a slew bearing coupled to the crane floor and configured to permit the crane floor to rotate about a rotational axis, wherein the slew bearing includes a first bearing position and a second bearing position spaced from the first bearing position relative to the central axis of the tower assembly.Type: GrantFiled: April 6, 2023Date of Patent: April 21, 2026Assignee: National Oilwell Varco, L.P.Inventors: Anthony Jason Harms, Travis Miller, Robert Benjamin Donnally
-
Patent number: 12473783Abstract: A well system includes a rig floor, a first rig floor robot positioned on the rig floor, wherein the first rig floor robot is configured to guide a lower end of a pipe stand towards a setback position on the rig floor, a mast extending from the rig floor, the mast including a plurality of legs, a pipe transport assembly slidably coupled to one of the legs of the mast, wherein the pipe transport assembly includes an elevator configured to transport the pipe stand, and a winch coupled to the mast and configured to raise and lower the pipe transport assembly along the mast.Type: GrantFiled: March 5, 2024Date of Patent: November 18, 2025Assignee: National Oilwell Varco, L.P.Inventors: Robert Benjamin Donnally, Xilin Liu
-
Publication number: 20240209698Abstract: A well system includes a rig floor, a first rig floor robot positioned on the rig floor, wherein the first rig floor robot is configured to guide a lower end of a pipe stand towards a setback position on the rig floor, a mast extending from the rig floor, the mast including a plurality of legs, a pipe transport assembly slidably coupled to one of the legs of the mast, wherein the pipe transport assembly includes an elevator configured to transport the pipe stand, and a winch coupled to the mast and configured to raise and lower the pipe transport assembly along the mast.Type: ApplicationFiled: March 5, 2024Publication date: June 27, 2024Applicant: National Oilwell Varco, L.P.Inventors: Robert Benjamin Donnally, Xilin Liu
-
Patent number: 11952844Abstract: A well system includes a well platform including a rig floor, a first rig floor robot and a second rig floor robot positioned on the rig floor, wherein the first rig floor robot is configured to guide a lower end of a pipe stand towards a setback position on the rig floor and the second rig floor robot is configured to guide a first pipe joint of the pipe stand into a first mouse hole formed in the rig floor, a mast extending from the rig floor, a racking board coupled to the mast, the racking board configured to secure an upper end of the pipe stand between a pair of finger boards of the racking board, a racking board robot positioned on the racking board and configured to position the upper end of the pipe stand between the pair of finger boards.Type: GrantFiled: January 31, 2020Date of Patent: April 9, 2024Assignee: National Oilwell Varco, L.P.Inventors: Robert Benjamin Donnally, Xilin Liu
-
Patent number: 11891864Abstract: A drilling rig having a lift arm, which may be an auxiliary lift arm provided in addition to a primary lifting cable system of the drilling rig. The lift arm may be configured to hoist and/or manipulate drill collar, drill pipe, or other drilling pipe or conduit. The lift arm may be coupled to a mast of the drilling rig and may have a cantilevered boom extending therefrom. The boom may be configured to pivot between alignment, or near alignment, with well center and a racking board. The lift arm may additionally have a pipe engaging element coupled to the boom. The pipe engaging element may be configured to couple to stands or lengths of drilling pipe. The pipe engaging element may be raised and lowered together with or relative to the boom via a lift line controllable via a hydraulic cylinder, winch, or other suitable mechanism for withdrawing and releasing the line.Type: GrantFiled: December 11, 2019Date of Patent: February 6, 2024Assignee: NATIONAL OILWELL VARCO, L.P.Inventors: Robert Benjamin Donnally, Xi Lin Liu
-
Patent number: 11884520Abstract: A tower crane for assembling a wind turbine includes a boom assembly including a boom and a hoisting block coupled to the boom, an extendable tower assembly including a plurality of tower sections, and a transport assembly including a central support frame coupled to the tower assembly, a self-propelled transporter configured to transport the tower crane, and a diagonal brace extending between the central support frame and the transporter, wherein the diagonal brace includes a linear actuator configured to selectably extend and retract the diagonal brace.Type: GrantFiled: December 16, 2021Date of Patent: January 30, 2024Assignee: National Oilwell Varco, L.P.Inventors: Anthony Jason Harms, Travis Miller, Robert Benjamin Donnally
-
Publication number: 20230322529Abstract: A tower crane for performing a lifting a load includes an extendable tower assembly having a central axis and including a plurality of separate tower sections, a climbing assembly including a climbing frame positioned on the tower assembly and a latching assembly to transport the climbing assembly vertically along the tower assembly, and a boom assembly atop the tower assembly and including a crane floor, a boom supported on the crane floor, a lifting member coupled to the boom, and a slew bearing coupled to the crane floor and configured to permit the crane floor to rotate about a rotational axis, wherein the slew bearing includes a first bearing position and a second bearing position spaced from the first bearing position relative to the central axis of the tower assembly.Type: ApplicationFiled: April 6, 2023Publication date: October 12, 2023Applicant: National Oilwell Varco, L.P.Inventors: Anthony Jason Harms, Travis Miller, Robert Benjamin Donnally
-
Patent number: 11754048Abstract: Tower erection systems and methods utilizing a load-sharing support member (LS support member) are disclosed. The LS support member can have a first end coupled to a crane tower and a second end configured to repeatably couple to the upper-most tower section of a partially assembled tower stack during assembly. During lifting, a portion of the vertical load is transferred to the partially assembled tower stack.Type: GrantFiled: March 25, 2021Date of Patent: September 12, 2023Assignee: NATIONAL OILWELL VARCO, L.P.Inventors: Farzad Azizi, Travis James Miller, Anthony Jason Harms, Robert Benjamin Donnally
-
Patent number: 11613940Abstract: The present disclosure relates to systems and methods for automated drill pipe handling operations, such as trip in, trip out, and stand building operations. A pipe handling system of the present disclosure may include a lifting system for handling a load of a pipe stand, a pipe handling robot configured for engaging with the pipe stand and manipulating a position of the pipe stand, and a feedback device configured to provide information about a condition of the pipe stand, the lifting system, or the pipe handling robot. In some embodiments, the pipe handling robot may be a first robot configured for engaging with and manipulating a first end of the pipe stand, and the system may include a second pipe handling robot configured for engaging with and manipulating a second end of the pipe stand.Type: GrantFiled: June 4, 2019Date of Patent: March 28, 2023Assignee: NATIONAL OILWELL VARCO, L.P.Inventors: Andrew Ian McKenzie, Robert Benjamin Donnally
-
Publication number: 20220307478Abstract: Tower erection systems and methods utilizing a load-sharing support member (LS support member) are disclosed. The LS support member can have a first end coupled to a crane tower and a second end configured to repeatably couple to the upper-most tower section of a partially assembled tower stack during assembly. During lifting, a portion of the vertical load is transferred to the partially assembled tower stack.Type: ApplicationFiled: March 25, 2021Publication date: September 29, 2022Inventors: Farzad Azizi, Travis James Miller, Anthony Jason Harms, Robert Benjamin Donnally
-
Publication number: 20220194753Abstract: A tower crane for assembling a wind turbine includes a boom assembly including a boom and a hoisting block coupled to the boom, an extendable tower assembly including a plurality of tower sections, and a transport assembly including a central support frame coupled to the tower assembly, a self-propelled transporter configured to transport the tower crane, and a diagonal brace extending between the central support frame and the transporter, wherein the diagonal brace includes a linear actuator configured to selectably extend and retract the diagonal brace.Type: ApplicationFiled: December 16, 2021Publication date: June 23, 2022Applicant: National Oilwell Varco, L.P.Inventors: Anthony Jason Harms, Travis Miller, Robert Benjamin Donnally
-
Publication number: 20220178215Abstract: A drilling rig having a lift arm, which may be an auxiliary lift arm provided in addition to a primary lifting cable system of the drilling rig. The lift arm may be configured to hoist and/or manipulate drill collar, drill pipe, or other drilling pipe or conduit. The lift arm may be coupled to a mast of the drilling rig and may have a cantilevered boom extending therefrom. The boom may be configured to pivot between alignment, or near alignment, with well center and a racking board. The lift arm may additionally have a pipe engaging element coupled to the boom. The pipe engaging element may be configured to couple to stands or lengths of drilling pipe. The pipe engaging element may be raised and lowered together with or relative to the boom via a lift line controllable via a hydraulic cylinder, winch, or other suitable mechanism for withdrawing and releasing the line.Type: ApplicationFiled: December 11, 2019Publication date: June 9, 2022Inventors: Robert Benjamin Donnally, Xi Lin Liu
-
Publication number: 20220127917Abstract: A well system includes a well platform including a rig floor, a first rig floor robot and a second rig floor robot positioned on the rig floor, wherein the first rig floor robot is configured to guide a lower end of a pipe stand towards a setback position on the rig floor and the second rig floor robot is configured to guide a first pipe joint of the pipe stand into a first mouse hole formed in the rig floor, a mast extending from the rig floor, a racking board coupled to the mast, the racking board configured to secure an upper end of the pipe stand between a pair of finger boards of the racking board, a racking board robot positioned on the racking board and configured to position the upper end of the pipe stand between the pair of finger boards.Type: ApplicationFiled: January 31, 2020Publication date: April 28, 2022Applicant: National Oilwell Varco, L.P.Inventors: Robert Benjamin Donnally, Xilin Liu
-
Patent number: 11035183Abstract: Systems and methods for clearing a top drive from an operational area of the mast such that operations may be performed along the rail without interference from the top drive. Systems and methods of the present disclosure provide for arranging the top drive in a parked configuration outside of, or generally behind, the mast. A guide rail may be arranged within an operational area of a mast and may have a pair of interchangeable rail sections, each of which may be configured for arrangement in either an operating configuration, where the rail section may be positioned within the operational area of the mast to form part of the rail, or a parked configuration, where the rail section may be positioned outside of the operational area. Each interchangeable rail section may be pivotable about an axis and may be arranged on a pivotable gate of the mast.Type: GrantFiled: June 4, 2019Date of Patent: June 15, 2021Assignee: NATIONAL OILWELL VARCO, L.P.Inventors: Robert Benjamin Donnally, Xi Lin Liu, Jay John Thiessen
-
Patent number: 10961780Abstract: A mast erection system includes a first mast erection apparatus that is adapted to pivotably raise a drilling rig mast of a drilling rig assembly to an intermediate raised position wherein the drilling rig mast is oriented at a first acute angle relative to a horizontal plane, and a second mast erection apparatus that is adapted to further pivotably raise the drilling rig mast from the intermediate raised position at the first acute angle to a fully raised position wherein the drilling rig mast is oriented at a second angle relative to the horizontal plane that is greater than the first acute angle.Type: GrantFiled: May 9, 2016Date of Patent: March 30, 2021Assignee: NATIONAL OILWELL VARCO, L.P.Inventors: Fuquan Chen, Robert Benjamin Donnally, Hua Jiang
-
Patent number: 10851595Abstract: A center drill floor assembly of a drilling rig structure includes a center floor structure and a drilling rig mast section that is at least partially nested within the center floor structure, wherein the center drill floor assembly is adapted to be transported to a drilling site as a single modular assembly and removably attached as a single modular assembly to a drilling rig substructure during assembly of the drilling rig structure.Type: GrantFiled: June 26, 2018Date of Patent: December 1, 2020Assignee: NATIONAL OILWELL VARCO, L.P.Inventors: Robert Benjamin Donnally, Colin Guo
-
Publication number: 20200048965Abstract: A mast erection system includes a first mast erection apparatus that is adapted to pivotably raise a drilling rig mast of a drilling rig assembly to an intermediate raised position wherein the drilling rig mast is oriented at a first acute angle relative to a horizontal plane, and a second mast erection apparatus that is adapted to further pivotably raise the drilling rig mast from the intermediate raised position at the first acute angle to a fully raised position wherein the drilling rig mast is oriented at a second angle relative to the horizontal plane that is greater than the first acute angle.Type: ApplicationFiled: May 9, 2016Publication date: February 13, 2020Inventors: Fuquan Chen, Robert Benjamin Donnally, Hua Jiang
-
Publication number: 20200040673Abstract: Systems and methods for clearing a top drive from an operational area of the mast such that operations may be performed along the rail without interference from the top drive. Systems and methods of the present disclosure provide for arranging the top drive in a parked configuration outside of, or generally behind, the mast. A guide rail may be arranged within an operational area of a mast and may have a pair of interchangeable rail sections, each of which may be configured for arrangement in either an operating configuration, where the rail section may be positioned within the operational area of the mast to form part of the rail, or a parked configuration, where the rail section may be positioned outside of the operational area. Each interchangeable rail section may be pivotable about an axis and may be arranged on a pivotable gate of the mast.Type: ApplicationFiled: June 4, 2019Publication date: February 6, 2020Inventors: Robert Benjamin Donnally, Xi Lin Liu, Jay John Thiessen
-
Publication number: 20200040674Abstract: The present disclosure relates to systems and methods for automated drill pipe handling operations, such as trip in, trip out, and stand building operations. A pipe handling system of the present disclosure may include a lifting system for handling a load of a pipe stand, a pipe handling robot configured for engaging with the pipe stand and manipulating a position of the pipe stand, and a feedback device configured to provide information about a condition of the pipe stand, the lifting system, or the pipe handling robot. In some embodiments, the pipe handling robot may be a first robot configured for engaging with and manipulating a first end of the pipe stand, and the system may include a second pipe handling robot configured for engaging with and manipulating a second end of the pipe stand.Type: ApplicationFiled: June 4, 2019Publication date: February 6, 2020Inventors: Andrew Ian McKenzie, Robert Benjamin Donnally
-
Publication number: 20190368279Abstract: A center drill floor assembly of a drilling rig structure includes a center floor structure and a drilling rig mast section that is at least partially nested within the center floor structure, wherein the center drill floor assembly is adapted to be transported to a drilling site as a single modular assembly and removably attached as a single modular assembly to a drilling rig substructure during assembly of the drilling rig structure.Type: ApplicationFiled: June 26, 2018Publication date: December 5, 2019Inventors: Robert Benjamin Donnally, Colin Guo