Patents by Inventor Sachie ISHIBASHI

Sachie ISHIBASHI has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 9425028
    Abstract: A plasma processing apparatus includes an upper electrode arranged at a processing chamber and including a plurality of gas supplying zones, a branch pipe including a plurality of branch parts, an addition pipe connected to at least one of the branch parts, and a plurality of gas pipes that connect the branch parts to the gas supplying zones. The upper electrode supplies a processing gas including a main gas to the processing chamber via the gas supplying zones. The branch pipe divides the processing gas according to a predetermined flow rate ratio and supplies the divided processing gas to the gas supplying zones. The addition pipe adds an adjustment gas. A gas flow path of the gas pipe connected to the branch part to which the addition pipe is connected includes a bending portion for preventing a gas concentration variation according to an adjustment gas-to-main gas molecular weight ratio.
    Type: Grant
    Filed: October 21, 2013
    Date of Patent: August 23, 2016
    Assignee: Tokyo Electron Limited
    Inventors: Yusei Kuwabara, Nobuaki Shindo, Sachie Ishibashi, Takahiko Kato, Noboru Maeda
  • Publication number: 20140116620
    Abstract: A plasma processing apparatus includes an upper electrode arranged at a processing chamber and including a plurality of gas supplying zones, a branch pipe including a plurality of branch parts, an addition pipe connected to at least one of the branch parts, and a plurality of gas pipes that connect the branch parts to the gas supplying zones. The upper electrode supplies a processing gas including a main gas to the processing chamber via the gas supplying zones. The branch pipe divides the processing gas according to a predetermined flow rate ratio and supplies the divided processing gas to the gas supplying zones. The addition pipe adds an adjustment gas. A gas flow path of the gas pipe connected to the branch part to which the addition pipe is connected includes a bending portion for preventing a gas concentration variation according to an adjustment gas-to-main gas molecular weight ratio.
    Type: Application
    Filed: October 21, 2013
    Publication date: May 1, 2014
    Applicant: Tokyo Electron Limited
    Inventors: Yusei KUWABARA, Nobuaki SHINDO, Sachie ISHIBASHI, Takahiko KATO, Noboru MAEDA