Patents by Inventor Said D. Sadykhov

Said D. Sadykhov has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11268914
    Abstract: Systems, tools, and methods for optimizing fracturing schedules located along a horizontal wellbore include obtaining drilling cuttings during a drilling operation representative of a predetermined interval of the horizontal wellbore, performing at least one analytical process on the obtained drilling cuttings to determine at least one geomechanical property of the interval of the obtained drilling cuttings for the interval, generating a formation analysis estimation for the interval from the, wherein the formation analysis estimation comprises at least one of (i) a brittleness of the formation at the interval or (ii) a minimum horizontal stress of the formation at the interval, and based on the formation analysis estimation, at least one of (i) configuring a super-stage for deployment to the interval to perform a fracturing operation or (ii) designing a fracturing schedule to be performed to frac the formation at the interval.
    Type: Grant
    Filed: January 13, 2017
    Date of Patent: March 8, 2022
    Assignee: BAKER HUGHES, A GE COMPANY, LLC
    Inventors: Umesh Prasad, Sergey Stolyarov, David Gadzhimirzaev, Robert Samuel Hurt, Eduardo Adrian Cazeneuve, Frank Walles, Geoffrey Cave, Said D. Sadykhov
  • Publication number: 20180202263
    Abstract: Systems, tools, and methods for optimizing fracturing schedules located along a horizontal wellbore include obtaining drilling cuttings during a drilling operation representative of a predetermined interval of the horizontal wellbore, performing at least one analytical process on the obtained drilling cuttings to determine at least one geomechanical property of the interval of the obtained drilling cuttings for the interval, generating a formation analysis estimation for the interval from the, wherein the formation analysis estimation comprises at least one of (i) a brittleness of the formation at the interval or (ii) a minimum horizontal stress of the formation at the interval, and based on the formation analysis estimation, at least one of (i) configuring a super-stage for deployment to the interval to perform a fracturing operation or (ii) designing a fracturing schedule to be performed to frac the formation at the interval.
    Type: Application
    Filed: January 13, 2017
    Publication date: July 19, 2018
    Applicant: Baker Hughes Incorporated
    Inventors: Umesh Prasad, Sergey Stolyarov, David Gadzhimirzaev, Robert Samuel Hurt, Eduardo Adrian Cazeneuve, Frank Walles, Geoffrey Cave, Said D. Sadykhov