Patents by Inventor Shinichirou Shimoi

Shinichirou Shimoi has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Publication number: 20210295275
    Abstract: The present invention includes: a condition information acquisition unit (131) that acquires, for each facility (201) in a facility group (200), a plurality of pieces of condition information that indicate a condition of the corresponding facility (201); a current failure risk calculation unit (132) that calculates, for each of the facilities (201), a current facility failure risk by using a plurality of pieces of the condition information; a future failure risk estimation unit (133) that estimates, for each of the facilities (201), a future facility failure risk by using the current facility failure risk; a maintenance merit calculation unit (136) that calculates, for each of the facilities (201), a maintenance merit based on a reduction amount of a facility stop prediction time based on the future facility failure risk and based on a maintenance prediction time based on the future facility failure risk; and an optimal maintenance timing setting unit (137) that sets an optimal maintenance timing of the facil
    Type: Application
    Filed: July 31, 2019
    Publication date: September 23, 2021
    Applicant: NIPPON STEEL TEXENG. CO., LTD.
    Inventors: Shinichirou SHIMOI, Manabu KUNINAGA
  • Patent number: 8527315
    Abstract: For each of tasks performed in an operation of manufacturing equipment, a proficiency of a worker with respect to a task to be performed is obtained from a proficiency DB (120) storing proficiencies of workers with respect to the tasks. A guidance base time (314) determined based on a manufacturing schedule is controlled corresponding to the proficiency of the worker, a guidance control time (334) corresponding to the proficiency of the worker is determined, and guidance is outputted at the guidance control time (334). The proficiency of the worker with respect to the task is corrected based on task record information (340) including a task content and a task time of a task performed by the worker and on the guidance control time (334), and the proficiency of the worker with respect to the task stored in the proficiency DB (120) is updated.
    Type: Grant
    Filed: December 2, 2010
    Date of Patent: September 3, 2013
    Assignee: Nippon Steel & Sumitomo Metal Corporation
    Inventors: Shinichirou Shimoi, Hideto Nakamura, Isao Oshita
  • Publication number: 20120059834
    Abstract: An acquisition unit acquires operation process data (including first process data operable by an operator and second process data different from the first process data) of a manufacturing facility from a facility management apparatus. A search unit searches past operation process data similar to current operation process data based on the first or second process data. A search unit searches action data related to the past operation process data searched by the search unit from action data determined by an action determination unit based on the first process data. An evaluation unit uses the second process data to evaluate the action data searched by the search unit. As a result, the operator can determine what kind of an operation related to an operation of the manufacturing facility should be performed in the future.
    Type: Application
    Filed: July 7, 2009
    Publication date: March 8, 2012
    Inventors: Shinichirou Shimoi, Hideto Nakamura, Isao Oshita
  • Publication number: 20120004952
    Abstract: For each of tasks performed in an operation of manufacturing equipment, a proficiency of a worker with respect to a task to be performed is obtained from a proficiency DB (120) storing proficiencies of workers with respect to the tasks. A guidance base time (314) determined based on a manufacturing schedule is controlled corresponding to the proficiency of the worker, a guidance control time (334) corresponding to the proficiency of the worker is determined, and guidance is outputted at the guidance control time (334). The proficiency of the worker with respect to the task is corrected based on task record information (340) including a task content and a task time of a task performed by the worker and on the guidance control time (334), and the proficiency of the worker with respect to the task stored in the proficiency DB (120) is updated.
    Type: Application
    Filed: December 2, 2010
    Publication date: January 5, 2012
    Inventors: Shinichirou Shimoi, Hideto Nakamura, Isao Oshita