Patents by Inventor Shuzhen Cui
Shuzhen Cui has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).
-
Patent number: 12281648Abstract: Fracturing equipment includes: a plunger pump, a main motor and a noise reduction device. The plunger pump is used for pressurizing liquid. The main motor is connected to the plunger pump by transmission for providing driving force to the plunger pump. The noise reduction device is constructed as a cabin structure and covers outside the main motor and isolates the main motor from the plunger pump. With the fracturing equipment according to the present disclosure, the fracturing equipment is driven by the main motor with relatively low noise during operation. The noise reduction device isolates the main motor from the outside, which can effectively reduce the noise intensity transmitted to the outside during operation, thereby achieve the effect of noise reduction. In addition, the plunger pump is isolated from the main motor by the noise reduction device, thus realizing isolation of high-pressure dangerous areas and ensuring safe operation.Type: GrantFiled: December 15, 2022Date of Patent: April 22, 2025Assignee: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.Inventors: Sheng Chang, Liang Lv, Shuzhen Cui, Chunqiang Lan, Jian Zhang, Xiaolei Ji, Huaizhi Zhang, Ruijie Du
-
Publication number: 20250118985Abstract: An electrically-driven pumping system and a driving method thereof. The electrically-driven pumping system includes: a power generation device, at least one energy storage system, a main motor, a pumping device, an auxiliary device, and a first transformer. The first transformer includes an input end, a first output end, and a second output end, the power generation device is connected to the energy storage unit, the input end of the first transformer is connected to the energy storage unit, the first output end of the first transformer is electrically connected to the main motor, and the second output end of the first transformer is electrically connected to the auxiliary device.Type: ApplicationFiled: December 17, 2024Publication date: April 10, 2025Inventors: Jifeng ZHONG, Liang LV, Shuzhen CUI, Yipeng WU, Xincheng LI
-
Patent number: 12272987Abstract: An electrically-driven pumping system and a driving method thereof. The electrically-driven pumping system includes: a power generation device, at least one energy storage system, a main motor, a pumping device, an auxiliary device, and a first transformer. The first transformer includes an input end, a first output end, and a second output end, the power generation device is connected to the energy storage unit, the input end of the first transformer is connected to the energy storage unit, the first output end of the first transformer is electrically connected to the main motor, and the second output end of the first transformer is electrically connected to the auxiliary device.Type: GrantFiled: February 15, 2022Date of Patent: April 8, 2025Assignee: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.Inventors: Jifeng Zhong, Liang Lv, Shuzhen Cui, Yipeng Wu, Xincheng Li
-
Publication number: 20250075604Abstract: A fracturing apparatus may include a first plunger pump including a first power end and a first hydraulic end; a prime mover including a first power output shaft; and a first clutch including a first connection portion and a second connection portion. The first power end of the first plunger pump includes a first power input shaft, the first connection portion is coupled to the first power input shaft, the second connection portion is coupled to the first power output shaft of the prime mover.Type: ApplicationFiled: November 19, 2024Publication date: March 6, 2025Inventors: Jifeng ZHONG, Liang LV, Xincheng LI, Shuzhen CUI, Rikui ZHANG, Sheng CHANG, Chunqiang LAN, Jian ZHANG, Xiaolei JI, Huaizhi ZHANG, Ruijie DU, Dawei ZHAO, Shouzhe LI
-
Patent number: 12215581Abstract: A fracturing apparatus includes a motor, a first plunger pump, a power supply platform, a gas turbine engine, a generator, and one or more rectifiers. At least two of the gas turbine engine, the generator, and the one or more rectifiers are arranged on the power supply platform. A first end of the generator is connected to the gas turbine engine. A second end of the generator is connected to the one or more rectifiers. The generator is configured to output a voltage to the one or more rectifiers. The one or more rectifiers are configured to provide power to the motor. The motor is configured to drive the first plunger pump.Type: GrantFiled: May 2, 2023Date of Patent: February 4, 2025Assignee: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.Inventors: Shuzhen Cui, Rikui Zhang, Dong Liu, Jifeng Zhong, Liang Lv, Xincheng Li, Sheng Chang, Chunqiang Lan, Jian Zhang, Xiaolei Ji, Huaizhi Zhang, Ruijie Du, Dawei Zhao, Shouzhe Li
-
Publication number: 20250027398Abstract: An electrically driven fracturing system is provided. The electrically driven fracturing system includes: one or more frequency converter apparatuses; and a plurality of electrically driven fracturing apparatuses configured to pressurize and output fluid. One of the one or more frequency converter apparatuses is connected with multiple ones of the plurality of electrically driven fracturing apparatuses, respectively, and the frequency converter apparatus is configured to adjust pressure and flow rate of fluid output by the multiple electrically driven fracturing apparatuses.Type: ApplicationFiled: October 3, 2024Publication date: January 23, 2025Inventors: Jifeng ZHONG, Shuzhen CUI, Shouzhe LI, Liang LV
-
Patent number: 12196066Abstract: A fracturing system includes an energy storage having a battery and a switch, a switch cabinet, a plurality of transformers, a plurality of rectifiers, and a plurality of inverters respectively corresponding to and connected with a plurality of fracturing apparatuses. The switch cabinet is connected with the plurality of transformers. The plurality of transformers are respectively connected with the plurality of rectifiers. Each of the plurality of rectifiers is directly connected with a DC bus and the energy storage. The DC bus is directed connected to the plurality of inverters. The energy storage is directly electrically connected with the DC bus or each of the plurality of inverters. The energy storage is configured to power the plurality of fracturing apparatuses.Type: GrantFiled: May 5, 2023Date of Patent: January 14, 2025Assignee: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.Inventors: Jifeng Zhong, Liang Lv, Shuzhen Cui, Shouzhe Li, Yipeng Wu
-
Patent number: 12180819Abstract: A fracturing apparatus may include a first plunger pump including a first power end and a first hydraulic end; a prime mover including a first power output shaft; and a first clutch including a first connection portion and a second connection portion. The first power end of the first plunger pump includes a first power input shaft, the first connection portion is coupled to the first power input shaft, the second connection portion is coupled to the first power output shaft of the prime mover.Type: GrantFiled: July 27, 2023Date of Patent: December 31, 2024Assignee: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.Inventors: Jifeng Zhong, Liang Lv, Xincheng Li, Shuzhen Cui, Rikui Zhang, Sheng Chang, Chunqiang Lan, Jian Zhang, Xiaolei Ji, Huaizhi Zhang, Ruijie Du, Dawei Zhao, Shouzhe Li
-
Patent number: 12173594Abstract: The present disclosure provides a fracturing system comprising fracturing equipment. The fracturing equipment comprises a power supply platform, a gas turbine engine, one or more rectifiers, and a power system comprising at least one of the following: a generator, an energy storage, and an electricity supplier. At least two of the gas turbine engine, the power system, and the one or more rectifiers are arranged on the power supply platform. A first end of the power system is connected to the gas turbine engine. A second end of the power system is connected to the one or more rectifiers. The power system is configured to output a voltage to the one or more rectifiers directly without passing through a rectifier transformer.Type: GrantFiled: August 15, 2022Date of Patent: December 24, 2024Assignee: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.Inventors: Shuzhen Cui, Rikui Zhang, Dong Liu, Jifeng Zhong, Liang Lv, Shouzhe Li, Yipeng Wu
-
Patent number: 12163510Abstract: A control method and a control device applied to an electric fracturing apparatus are provided. The electric fracturing apparatus includes a plunger pump and a first motor configured to drive the plunger pump, and the method includes: acquiring a preset displacement of the plunger pump; acquiring a rotation speed of the first motor and a discharge pressure of the plunger pump; determining a real-time displacement of the plunger pump based on the rotation speed of the first motor and the discharge pressure of the plunger pump and adjusting the real-time displacement; and upon the real-time displacement reaching the preset displacement, allowing the first motor to be kept in a stable operation state.Type: GrantFiled: July 6, 2021Date of Patent: December 10, 2024Assignee: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.Inventors: Kaishen Liu, Xiance Li, Zhuqing Mao, Shuzhen Cui, Song Zhang
-
Patent number: 12134964Abstract: An electrically driven fracturing system is provided. The electrically driven fracturing system includes: one or more frequency converter apparatuses; and a plurality of electrically driven fracturing apparatuses configured to pressurize and output fluid. One of the one or more frequency converter apparatuses is connected with multiple ones of the plurality of electrically driven fracturing apparatuses, respectively, and the frequency converter apparatus is configured to adjust pressure and flow rate of fluid output by the multiple electrically driven fracturing apparatuses.Type: GrantFiled: June 23, 2023Date of Patent: November 5, 2024Assignee: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.Inventors: Jifeng Zhong, Shuzhen Cui, Shouzhe Li, Liang Lv
-
Publication number: 20240337179Abstract: A control system includes: a fracturing control device configured to acquire a target fracturing pressure of a fracturing unit, perform loop control on the fracturing unit by taking the target fracturing pressure as a control target, and set a target sand blending pressure for the sand blending unit; a sand blending control device configured to perform loop control on the sand blending unit by taking the target sand blending pressure as a control target.Type: ApplicationFiled: June 17, 2024Publication date: October 10, 2024Inventors: Kaishen LIU, Xiance LI, Shuzhen CUI, Zhuqing MAO, Weiwei LIU, Liang LI, Pengyuan ZHANG, Dawei ZHAO
-
Patent number: 12078044Abstract: The present disclosure relates to a fracturing system comprising a functional unit, an electricity supply unit and an energy storage unit. The functional unit is configured to perform procedures of fracturing operations. The electricity supply unit is electrically connected with the functional unit and is configured to supply electrical energy to the functional unit. The energy storage unit is respectively electrically connected with the electricity supply unit and the functional unit, and is configured to store electrical energy from the electricity supply unit and supply electrical energy to the functional unit.Type: GrantFiled: February 4, 2021Date of Patent: September 3, 2024Assignee: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTDInventors: Jifeng Zhong, Liang Lv, Shuzhen Cui, Shouzhe Li, Yipeng Wu
-
Publication number: 20240287972Abstract: A fracturing apparatus includes: a plunger pump having a hydraulic end and a power end, wherein the power end comprises a power end oil outlet and at least one power end oil inlet that are coupled to each other; a power end lubricating system, including a lubricating oil tank defining an accommodation space, at least one lubrication pump having a lubrication pump oil inlet and a lubrication pump oil outlet that are coupled to each other, and at least one lubrication motor configured to provide power for the at least one lubrication pump; a temperature detector disposed on any one of the oil return pipeline, the power end oil outlet, and the lubricating oil tank; and a control system connected to the temperature detector and the power end lubricating system and configured to control the power end lubricating system.Type: ApplicationFiled: April 30, 2024Publication date: August 29, 2024Inventors: Sheng CHANG, Shuzhen CUI, Liang LV, Jifeng ZHONG, Shanwu FU, Chunqiang LAN, Ruijie DU, Jian ZHANG
-
Patent number: 12071840Abstract: A wellsite system for electrically-driven fracturing may include a power supply system, one or more electrically-driven fracturing systems, one or more electrically-driven sand blenders, a sand supply system, a liquid supply system, and one or more manifolds. The power supply system includes a gas turbine generator set configured to provide power to the one or more electrically-driven fracturing systems and the one or more electrically-driven sand blenders respectively. The sand supply system and the liquid supply system are both connected to input ends of the electrically-driven sand blenders. Output ends of the electrically-driven sand blenders are connected to the electrically-driven fracturing systems through the one or more manifolds. The electrically-driven fracturing systems are connected to a wellhead through the one or more manifolds.Type: GrantFiled: March 24, 2022Date of Patent: August 27, 2024Assignee: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.Inventors: Shuzhen Cui, Rikui Zhang, Sheng Chang
-
Publication number: 20240271516Abstract: The present disclosure provides a fracturing system comprising fracturing equipment. The fracturing equipment comprises a power supply platform, a gas turbine engine, one or more rectifiers, and a power system comprising at least one of the following: a generator, an energy storage, and an electricity supplier. At least two of the gas turbine engine, the power system, and the one or more rectifiers are arranged on the power supply platform. A first end of the power system is connected to the gas turbine engine. A second end of the power system is connected to the one or more rectifiers. The power system is configured to output a voltage to the one or more rectifiers directly without passing through a rectifier transformer.Type: ApplicationFiled: April 23, 2024Publication date: August 15, 2024Inventors: Shuzhen CUI, Rikui ZHANG, Dong LIU, Jifeng ZHONG, Liang LV, Shouzhe LI, Yipeng WU
-
Publication number: 20240254870Abstract: The present disclosure provides a fracturing device driven by a variable-frequency adjustable-speed integrated machine (VFASIM), including the VFASIM and a plunger pump. The VFASIM includes a driving device for providing a driving force and an inverting device integrally installed on the driving device. The inverting device supplies power to the driving device. The plunger pump is integrally installed together with the VFASIM, the plunger pump is mechanically connected to the driving device of the VFASIM and driven by the driving device. According to the present disclosure, it is possible to achieve an overall layout with a high degree of integration. The present disclosure also provides a well site layout including a plurality of fracturing devices described above.Type: ApplicationFiled: April 8, 2024Publication date: August 1, 2024Inventors: Shuzhen CUI, Sheng CHANG, Dawei ZHAO, Shouzhe LI, Liang LV, Xincheng LI
-
Patent number: 12044114Abstract: A control system includes: a fracturing control device configured to acquire a target fracturing pressure of a fracturing unit, perform loop control on the fracturing unit by taking the target fracturing pressure as a control target, and set a target sand blending pressure for the sand blending unit; a sand blending control device configured to perform loop control on the sand blending unit by taking the target sand blending pressure as a control target.Type: GrantFiled: June 6, 2023Date of Patent: July 23, 2024Assignee: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.Inventors: Kaishen Liu, Xiance Li, Shuzhen Cui, Zhuqing Mao, Weiwei Liu, Liang Li, Pengyuan Zhang, Dawei Zhao
-
Patent number: 12044112Abstract: The present disclosure relates to a high and low pressure manifold fluid supply system for fracturing units, including: a trailer, a high and low pressure manifold arranged on the trailer, a support frame arranged on a platform of the trailer, and a power distribution switch cabinet arranged on the support frame, which is configured to be electrically connected to the electrically-driven fracturing units and configured to distribute electricity to the electrically-driven fracturing units. Through the high and low pressure manifold fluid supply system integrated with electricity supply facilities therein according to the present disclosure, the electrically-driven fracturing units are powered, in this way, the electricity supply and distribution system in the well site can be effectively simplified, the connection distance of the cables can be shorten, and further the time spent on connection can be saved, thereby improving the well site layout efficiency.Type: GrantFiled: January 11, 2023Date of Patent: July 23, 2024Assignee: Yantai Jereh Petroleum Equipment & Technologies Co., Ltd.Inventors: Shuzhen Cui, Yibo Jiang, Chunqiang Lan, Kun Zhang
-
Publication number: 20240226832Abstract: A full-electric drive cementing control system is disclosed.Type: ApplicationFiled: March 16, 2022Publication date: July 11, 2024Applicant: YANTAI JEREH PETROLEUM EQUIPMENT & TECHNOLOGIES CO., LTD.Inventors: Pengyuan ZHANG, Kai WANG, Jihua WAN, Ren LIU, Jun WANG, Song ZHANG, Kaishen LIU, Shuzhen CUI, Zhuqing MAO, Weiwei LIU