Patents by Inventor Sven Paulsen
Sven Paulsen has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).
-
Publication number: 20240152870Abstract: In a method for determining an area milled by at least one construction machine or at least one mining machine by means of a milling drum (2) by means of working a predetermined area in several milling trajectories by at least one machine (1), determining the length of the milling trajectories along which a milling operation has taken place by evaluating the continuous machine positions, adding up the previously milled partial areas taking into account the length of the milling trajectory and the installed width of the milling drum (2), wherein the partial area currently milled along the milling trajectory is checked, either continuously or subsequently, for overlapping or multiple overlapping with any previously milled partial areas, and any partial areas which overlap are deducted, as overlapping areas, from the added-up previously milled partial areas, the total added-up partial areas milled minus the total overlapping areas established give the milled area.Type: ApplicationFiled: November 17, 2023Publication date: May 9, 2024Inventors: Sven Paulsen, Stefan Wagner, Cyrus Barimani
-
Publication number: 20240084529Abstract: A system is provided for determining a volume of material milled, or a surface area milled, by a construction machine having a milling drum. The volume of material milled is determined as a function of a cross-sectional area of material to be milled in front of the milling drum and a distance traveled by the construction machine while actively milling. The cross-sectional area is determined in part by direct machine observation of one or more profile characteristics of a ground surface in front of the milling drum. The surface area milled is determined as a function of the width of the area to be milled in front of the milling drum and a distance traveled by the construction machine while actively milling.Type: ApplicationFiled: September 28, 2023Publication date: March 14, 2024Inventors: Sven Paulsen, Stefan Wagner, Klaus Vollmann, Lothar Schwalbach, Cyrus Barimani
-
Patent number: 11823131Abstract: In a method for determining an area milled by at least one construction machine or at least one mining machine by means of a milling drum (2) by means of working a predetermined area in several milling trajectories by at least one machine (1), determining the length of the milling trajectories along which a milling operation has taken place by evaluating the continuous machine positions, adding up the previously milled partial areas taking into account the length of the milling trajectory and the installed width of the milling drum (2), wherein the partial area currently milled along the milling trajectory is checked, either continuously or subsequently, for overlapping or multiple overlapping with any previously milled partial areas, and any partial areas which overlap are deducted, as overlapping areas, from the added-up previously milled partial areas, the total added-up partial areas milled minus the total overlapping areas established give the milled area.Type: GrantFiled: August 27, 2021Date of Patent: November 21, 2023Inventors: Sven Paulsen, Stefan Wagner, Cyrus Barimani
-
Patent number: 11773544Abstract: A system is provided for determining a volume of material milled, or a surface area milled, by a construction machine having a milling drum. The volume of material milled is determined as a function of a cross-sectional area of material to be milled in front of the milling drum and a distance traveled by the construction machine while actively milling. The cross-sectional area is determined in part by direct machine observation of one or more profile characteristics of a ground surface in front of the milling drum. The surface area milled is determined as a function of the width of the area to be milled in front of the milling drum and a distance traveled by the construction machine while actively milling.Type: GrantFiled: January 9, 2020Date of Patent: October 3, 2023Inventors: Sven Paulsen, Stefan Wagner, Klaus Vollmann, Lothar Schwalbach, Cyrus Barimani
-
Publication number: 20230147600Abstract: A wear prognosis method and a maintenance method for an earth working machine are disclosed, along with an apparatus for performing the method. Provision is made that the current wear state of one or more earth working tools is sensed. The residual wear capacity until the wear limit is reached is then ascertained from the current wear state.Type: ApplicationFiled: November 15, 2022Publication date: May 11, 2023Inventors: Sven Paulsen, Stefan Wagner, Cyrus Barimani
-
Patent number: 11506585Abstract: A wear prognosis method and a maintenance method for an earth working machine are disclosed, along with an apparatus for performing the method. Provision is made that the current wear state of one or more earth working tools is sensed. The residual wear capacity until the wear limit is reached is then ascertained from the current wear state.Type: GrantFiled: September 12, 2019Date of Patent: November 22, 2022Inventors: Sven Paulsen, Stefan Wagner, Cyrus Barimani
-
Publication number: 20220051193Abstract: In a method for determining an area milled by at least one construction machine or at least one mining machine by means of a milling drum (2) by means of working a predetermined area in several milling trajectories by at least one machine (1), determining the length of the milling trajectories along which a milling operation has taken place by evaluating the continuous machine positions, adding up the previously milled partial areas taking into account the length of the milling trajectory and the installed width of the milling drum (2), wherein the partial area currently milled along the milling trajectory is checked, either continuously or subsequently, for overlapping or multiple overlapping with any previously milled partial areas, and any partial areas which overlap are deducted, as overlapping areas, from the added-up previously milled partial areas, the total added-up partial areas milled minus the total overlapping areas established give the milled area.Type: ApplicationFiled: August 27, 2021Publication date: February 17, 2022Inventors: Sven Paulsen, Stefan Wagner, Cyrus Barimani
-
Patent number: 11113668Abstract: In a method for determining an area milled by at least one construction machine or at least one mining machine with a milling drum (2) working a predetermined area in several milling trajectories by at least one machine (1), determining the length of the milling trajectories along which a milling operation has taken place by evaluating the continuous machine positions, adding up the previously milled partial areas taking into account the length of the milling trajectory and the installed width of the milling drum (2), wherein the partial area currently milled along the milling trajectory is checked, either continuously or subsequently, for overlapping or multiple overlapping with any previously milled partial areas, and any partial areas which overlap are deducted, as overlapping areas, from the added-up previously milled partial areas, the total added-up partial areas milled minus the total overlapping areas established give the milled area.Type: GrantFiled: July 8, 2019Date of Patent: September 7, 2021Inventors: Sven Paulsen, Stefan Wagner, Cyrus Barimani
-
Publication number: 20200217024Abstract: A system is provided for determining a volume of material milled, or a surface area milled, by a construction machine having a milling drum. The volume of material milled is determined as a function of a cross-sectional area of material to be milled in front of the milling drum and a distance traveled by the construction machine while actively milling. The cross-sectional area is determined in part by direct machine observation of one or more profile characteristics of a ground surface in front of the milling drum. The surface area milled is determined as a function of the width of the area to be milled in front of the milling drum and a distance traveled by the construction machine while actively milling.Type: ApplicationFiled: January 9, 2020Publication date: July 9, 2020Inventors: Sven Paulsen, Stefan Wagner, Klaus Vollmann, Lothar Schwalbach, Cyrus Barimani
-
Publication number: 20200064242Abstract: A wear prognosis method and a maintenance method for an earth working machine are disclosed, along with an apparatus for performing the method. Provision is made that the current wear state of one or more earth working tools is sensed. The residual wear capacity until the wear limit is reached is then ascertained from the current wear state.Type: ApplicationFiled: September 12, 2019Publication date: February 27, 2020Inventors: Sven Paulsen, Stefan Wagner, Cyrus Barimani
-
Publication number: 20200034793Abstract: In a method for determining an area milled by at least one construction machine or at least one mining machine by means of a milling drum (2) by means of working a predetermined area in several milling trajectories by at least one machine (1), determining the length of the milling trajectories along which a milling operation has taken place by evaluating the continuous machine positions, adding up the previously milled partial areas taking into account the length of the milling trajectory and the installed width of the milling drum (2), wherein the partial area currently milled along the milling trajectory is checked, either continuously or subsequently, for overlapping or multiple overlapping with any previously milled partial areas, and any partial areas which overlap are deducted, as overlapping areas, from the added-up previously milled partial areas, the total added-up partial areas milled minus the total overlapping areas established give the milled area.Type: ApplicationFiled: July 8, 2019Publication date: January 30, 2020Inventors: Sven Paulsen, Stefan Wagner, Cyrus Barimani
-
Patent number: 10416056Abstract: A wear prognosis method and a maintenance method for an earth working machine are disclosed, along with an apparatus for performing the method. Provision is made that the current wear state of one or more earth working tools is sensed. The residual wear capacity until the wear limit is reached is then ascertained from the current wear state.Type: GrantFiled: November 20, 2014Date of Patent: September 17, 2019Assignee: Wirtgen GmbHInventors: Sven Paulsen, Stefan Wagner, Cyrus Barimani
-
Patent number: 10354228Abstract: In a method for determining an area milled by at least one construction machine or at least one mining machine by means of a milling drum (2) by means of working a predetermined area in several milling trajectories by at least one machine (1), determining the length of the milling trajectories along which a milling operation has taken place by evaluating the continuous machine positions, adding up the previously milled partial areas taking into account the length of the milling trajectory and the installed width of the milling drum (2), wherein the partial area currently milled along the milling trajectory is checked, either continuously or subsequently, for overlapping or multiple overlapping with any previously milled partial areas, and any partial areas which overlap are deducted, as overlapping areas, from the added-up previously milled partial areas, the total added-up partial areas milled minus the total overlapping areas established give the milled area.Type: GrantFiled: February 21, 2017Date of Patent: July 16, 2019Assignee: Wirtgen GmbHInventors: Sven Paulsen, Stefan Wagner, Cyrus Barimani
-
Publication number: 20170293889Abstract: In a method for determining an area milled by at least one construction machine or at least one mining machine by means of a milling drum (2) by means of working a predetermined area in several milling trajectories by at least one machine (1), determining the length of the milling trajectories along which a milling operation has taken place by evaluating the continuous machine positions, adding up the previously milled partial areas taking into account the length of the milling trajectory and the installed width of the milling drum (2), wherein the partial area currently milled along the milling trajectory is checked, either continuously or subsequently, for overlapping or multiple overlapping with any previously milled partial areas, and any partial areas which overlap are deducted, as overlapping areas, from the added-up previously milled partial areas, the total added-up partial areas milled minus the total overlapping areas established give the milled area.Type: ApplicationFiled: February 21, 2017Publication date: October 12, 2017Inventors: Sven Paulsen, Stefan Wagner, Cyrus Barimani
-
Patent number: 9581441Abstract: In a method for determining an area milled by at least one construction machine or at least one mining machine by means of a milling drum (2) by means of working a predetermined area in several milling trajectories by at least one machine (1), determining the length of the milling trajectories along which a milling operation has taken place by evaluating the continuous machine positions, adding up the previously milled partial areas taking into account the length of the milling trajectory and the installed width of the milling drum (2), wherein the partial area currently milled along the milling trajectory is checked, either continuously or subsequently, for overlapping or multiple overlapping with any previously milled partial areas, and any partial areas which overlap are deducted, as overlapping areas, from the added-up previously milled partial areas, the total added-up partial areas milled minus the total overlapping areas established give the milled area.Type: GrantFiled: June 4, 2012Date of Patent: February 28, 2017Assignee: WIRTGEN GMBHInventors: Sven Paulsen, Stefan Wagner, Cyrus Barimani, Günter Hähn
-
Publication number: 20160040370Abstract: A system is provided for determining a volume of material milled, or a surface area milled, by a construction machine having a milling drum. The volume of material milled is determined as a function of a cross-sectional area of material to be milled in front of the milling drum and a distance traveled by the construction machine while actively milling. The cross-sectional area is determined in part by direct machine observation of one or more profile characteristics of a ground surface in front of the milling drum. The surface area milled is determined as a function of the width of the area to be milled in front of the milling drum and a distance traveled by the construction machine while actively milling.Type: ApplicationFiled: August 24, 2015Publication date: February 11, 2016Inventors: Sven Paulsen, Stefan Wagner, Klaus Vollmann, Lothar Schwalbach, Cyrus Barimani, Günter Hähn
-
Patent number: 9121146Abstract: A system is provided for determining a volume of material milled, or a surface area milled, by a construction machine having a milling drum. The volume of material milled is determined as a function of a cross-sectional area of material to be milled in front of the milling drum and a distance traveled by the construction machine while actively milling. The cross-sectional area is determined in part by direct machine observation of one or more profile characteristics of a ground surface in front of the milling drum. The surface area milled is determined as a function of the width of the area to be milled in front of the milling drum and a distance traveled by the construction machine while actively milling.Type: GrantFiled: October 8, 2012Date of Patent: September 1, 2015Assignee: Wirtgen GmbHInventors: Sven Paulsen, Stefan Wagner, Klaus Vollmann, Lothar Schwalbach, Cyrus Barimani, Günter Hähn
-
Publication number: 20150149027Abstract: A wear prognosis method and a maintenance method for an earth working machine are disclosed, along with an apparatus for performing the method. Provision is made that the current wear state of one or more earth working tools is sensed. The residual wear capacity until the wear limit is reached is then ascertained from the current wear state.Type: ApplicationFiled: November 20, 2014Publication date: May 28, 2015Inventors: Sven Paulsen, Stefan Wagner, Cyrus Barimani, Günter Hähn
-
Publication number: 20140244208Abstract: In a method for determining an area milled by at least one construction machine or at least one mining machine by means of a milling drum (2) by means of working a predetermined area in several milling trajectories by at least one machine (1), determining the length of the milling trajectories along which a milling operation has taken place by evaluating the continuous machine positions, adding up the previously milled partial areas taking into account the length of the milling trajectory and the installed width of the milling drum (2), wherein the partial area currently milled along the milling trajectory is checked, either continuously or subsequently, for overlapping or multiple overlapping with any previously milled partial areas, and any partial areas which overlap are deducted, as overlapping areas, from the added-up previously milled partial areas, the total added-up partial areas milled minus the total overlapping areas established give the milled area.Type: ApplicationFiled: June 4, 2012Publication date: August 28, 2014Applicant: WIRTGEN GMBHInventors: Sven Paulsen, Stefan Wagner, Cyrus Barimani, Günter Hähn
-
Publication number: 20140097665Abstract: A system is provided for determining a volume of material milled, or a surface area milled, by a construction machine having a milling drum. The volume of material milled is determined as a function of a cross-sectional area of material to be milled in front of the milling drum and a distance traveled by the construction machine while actively milling. The cross-sectional area is determined in part by direct machine observation of one or more profile characteristics of a ground surface in front of the milling drum. The surface area milled is determined as a function of the width of the area to be milled in front of the milling drum and a distance traveled by the construction machine while actively milling.Type: ApplicationFiled: October 8, 2012Publication date: April 10, 2014Applicant: WIRTGEN GMBHInventors: Sven Paulsen, Stefan Wagner, Klaus Vollmann, Lothar Schwalbach, Cyrus Barimani, Günter Hähn