Patents by Inventor Taize ZHOU

Taize ZHOU has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 10233595
    Abstract: A hard pavement construction method for natural groundwater recharge, comprising the following steps: drilling to an underground shallow sand zone water storage layer on a flattened earth floor, filling holes with sand, inserting rod-shaped tools into the holes filled with the sand, pouring concrete to form a concrete foundation layer with a flat surface, removing the rod-shaped tools, filling the holes with the sand to be flush with a plane of the concrete foundation layer, sanding and compacting on the concrete foundation layer, directly arranging pavement bricks on a sand surface in an unbonded manner to form a hard pavement, and enabling rain and snow water on the hard pavement to pass through cracks of the pavement bricks, rapidly and naturally recharge to the underground shallow sand zone water storage layer via the holes and slowly permeate to an underground deep sand zone water storage layer.
    Type: Grant
    Filed: September 7, 2017
    Date of Patent: March 19, 2019
    Inventor: Taize Zhou
  • Publication number: 20170362779
    Abstract: The disclosure discloses a hard pavement construction method for natural groundwater recharge, comprising the following steps: drilling to an underground shallow sand zone water storage layer on a flattened earth floor, filling holes with sand, inserting rod-shaped tools into the holes filled with the sand, pouring concrete to form a concrete foundation layer with a flat surface, removing the rod-shaped tools, filling the holes with the sand to be flush with a plane of the concrete foundation layer, sanding and compacting on the concrete foundation layer, directly arranging pavement bricks on a sand surface in an unbonded manner to form a hard pavement, and enabling rain and snow water on the hard pavement to pass through cracks of the pavement bricks, rapidly and naturally recharge to the underground shallow sand zone water storage layer via the holes and slowly permeate to an underground deep sand zone water storage layer.
    Type: Application
    Filed: September 7, 2017
    Publication date: December 21, 2017
    Inventor: Taize ZHOU