Patents by Inventor Tiberio Virgilio Nogueira Pereira

Tiberio Virgilio Nogueira Pereira has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 10875556
    Abstract: A support frame is disclosed for a temporary signal for a railroad. The railroad includes a track having two elongate rails, and the support frame comprises a post arranged to support a railroad signal, a base joined to the post, and at least one attachment for attaching the base to both rails of the track. The base comprises a first beam and a second beam, and the first beam and the second beam are each arranged to be attached to both of the rails.
    Type: Grant
    Filed: June 23, 2016
    Date of Patent: December 29, 2020
    Assignee: Technological Resources Pty. Limited
    Inventor: Tiberio Virgilio Nogueira Pereira
  • Patent number: 10836413
    Abstract: A control arrangement for a railroad level crossing is disclosed. The control arrangement comprises monitoring sensors for monitoring the level crossing, the monitoring sensors arranged to detect an obstruction within a restricted area at or near to the level crossing, and a processing unit associated with the monitoring sensors and arranged to generate an alarm warning when an obstruction is detected. The alarm warning is used to adjust a Movement Authority issued to a train approaching the level crossing.
    Type: Grant
    Filed: June 23, 2016
    Date of Patent: November 17, 2020
    Assignee: Technological Resources Pty. Limited
    Inventors: Ilidio Gouveia Da Costa, Tiberio Virgilio Nogueira Pereira
  • Patent number: 10384698
    Abstract: A rail crossover control system for a rail track section is disclosed. The rail track section has first and second rail tracks, a crossover track section extending between the first and second rail tracks, at least one first set of rail switches arranged to controllably determine whether a train continues on the first track or is diverted from the first track onto the crossover track section, and at least one second set of rail switches arranged to controllably determine whether a train continues on the second track or is diverted from the second track onto the crossover track section. The system comprises at least one interlocking control unit arranged to control the first and second sets of rail switches according to determined train routes, and an obstruction detector arranged to detect presence of an obstruction on the crossover track section and generate an obstruction signal when an obstruction is detected.
    Type: Grant
    Filed: June 16, 2015
    Date of Patent: August 20, 2019
    Assignee: Technological Resources Pty. Limited
    Inventors: Ilidio Gouveia Da Costa, Anthony Michael Godber, James Peter Kanakis, Arvind Maharaj, Tiberio Virgilio Nogueira Pereira
  • Publication number: 20180194377
    Abstract: A support frame is disclosed for a temporary signal for a railroad. The railroad includes a track having two elongate rails, and the support frame comprises a post arranged to support a railroad signal, a base joined to the post, and at least one attachment for attaching the base to both rails of the track. The base comprises a first beam and a second beam, and the first beam and the second beam are each arranged to be attached to both of the rails.
    Type: Application
    Filed: June 23, 2016
    Publication date: July 12, 2018
    Inventor: Tiberio Virgilio Nogueira PEREIRA
  • Publication number: 20180186392
    Abstract: A control arrangement for a railroad level crossing is disclosed. The control arrangement comprises monitoring sensors for monitoring the level crossing, the monitoring sensors arranged to detect an obstruction within a restricted area at or near to the level crossing, and a processing unit associated with the monitoring sensors and arranged to generate an alarm warning when an obstruction is detected. The alarm warning is used to adjust a Movement Authority issued to a train approaching the level crossing.
    Type: Application
    Filed: June 23, 2016
    Publication date: July 5, 2018
    Inventors: Ilidio Gouveia DA COSTA, Tiberio Virgilio Nogueira PEREIRA
  • Publication number: 20170120938
    Abstract: A rail crossover control system for a rail track section is disclosed. The rail track section has first and second rail tracks, a crossover track section extending between the first and second rail tracks, at least one first set of rail switches arranged to controllably determine whether a train continues on the first track or is diverted from the first track onto the crossover track section, and at least one second set of rail switches arranged to controllably determine whether a train continues on the second track or is diverted from the second track onto the crossover track section. The system comprises at least one interlocking control unit arranged to control the first and second sets of rail switches according to determined train routes, and an obstruction detector arranged to detect presence of an obstruction on the crossover track section and generate an obstruction signal when an obstruction is detected.
    Type: Application
    Filed: June 16, 2015
    Publication date: May 4, 2017
    Inventors: Ilidio Gouveia Da Costa, Anthony Michael Godber, James Peter Kanakis, Arvind Maharaj, Tiberio Virgilio Nogueira Pereira