  • Publication number: 20220228486
    Abstract: A hypergravity model test device for simulating a progressive failure of a shield tunnel face, including a model box, a shield tunnel model, a servo loading control system and a data acquisition system. The servo loading control system includes a servo motor, a planetary roller screw electric cylinder and a loading rod. The data acquisition system includes a displacement transducer, an axial force meter, a pore pressure transducer, an earth pressure transducer and an industrial camera. The servo loading control system is connected to an excavation plate through the loading rod to control the excavation plate to move back and forth along an axial direction of the shield tunnel model at a set speed to simulate failure of the shield tunnel face. A method for simulating a progressive failure of a shield tunnel face is also provided.
    Type: Application
    Filed: April 7, 2022
    Publication date: July 21, 2022
    Inventors: Xiaowei YE, Zhixiong LIU, Siyuan MA, Junchao LI, Yunmin CHEN, Jing HOU, Weijiang CHU, Can WANG
  • Patent number: 10378172
    Abstract: The present invention provides a yieldable construction method for early releasing surrounding rock deformation on a weak toppling slope, thereby reducing surrounding rock toppling deformation risk in and after an excavation process and ensuring overall slope stability and safety of a supporting structure. A technical solution of the present invention is as follows: loosing a rock mass through controlled blasting; inducing toppling deformation of the slope by injecting water and softening a blasting relaxation part of the rock mass; determining timing of water injection by monitoring slope surface displacement characteristics of the slope; and performing a normal excavation process of the toppling deformation slope after injecting is completed. The present invention is applicable to design and construction of high slope engineering of a special kind of rocks, i.e., a toppling deformation slope composed of weak rock masses.
    Type: Grant
    Filed: June 14, 2017
    Date of Patent: August 13, 2019
    Assignee: PowerChina Huadong Engineering Corporation Limited
    Inventors: Weijiang Chu, Chunsheng Zhang, Jing Hou, Jiayao Wu, Yong Zhou
  • Patent number: 9995139
    Abstract: The present invention relates to a surrounding rock pretreatment method for a TBM (tunnel boring machine) passing through a round tunnel section with high rock-burst risk. A technical solution of the present invention is as follows: the surrounding rock pretreatment method includes the following steps: 1. determining a pretreatment area, wherein an area in which a clear spacing between a to-be-constructed tunnel and an adjacent existing tunnel in a TBM tunneling direction is less than 2 times that of a tunnel diameter of the TBM to-be-constructed tunnel is the pretreatment area: 2. performing controlled blasting; 3. injecting high pressure water, and selecting part of blast holes I to perform cyclic water injection pressurizing; and 4, performing normal tunneling by the TBM.
    Type: Grant
    Filed: June 23, 2017
    Date of Patent: June 12, 2018
    Inventors: Weijiang Chu, Chunsheng Zhang, Jing Hou, Yong Zhou, Pingzhi Chen
  • Publication number: 20180010316
    Abstract: The present invention provides a yieldable construction method for early releasing surrounding rock deformation on a weak toppling slope, thereby reducing surrounding rock toppling deformation risk in and after an excavation process and ensuring overall slope stability and safety of a supporting structure. A technical solution of the present invention is as follows: loosing a rock mass through controlled blasting; inducing toppling deformation of the slope by injecting water and softening a blasting relaxation part of the rock mass; determining timing of water injection by monitoring slope surface displacement characteristics of the slope; and performing a normal excavation process of the toppling deformation slope after injecting is completed. The present invention is applicable to design and construction of high slope engineering of a special kind of rocks, i.e., a toppling deformation slope composed of weak rock masses.
    Type: Application
    Filed: June 14, 2017
    Publication date: January 11, 2018
    Inventors: Weijiang CHU, Chunsheng ZHANG, Jing HOU, Jiayao WU, Yong ZHOU
  • Publication number: 20180010452
    Abstract: The present invention relates to a surrounding rock pretreatment method for a TBM (tunnel boring machine) passing through a round tunnel section with high rock-burst risk. A technical solution of the present invention is as follows: the surrounding rock pretreatment method includes the following steps: 1. determining a pretreatment area, wherein an area in which a clear spacing between a to-be-constructed tunnel and an adjacent existing tunnel in a TBM tunneling direction is less than 2 times that of a tunnel diameter of the TBM to-be-constructed tunnel is the pretreatment area: 2. performing controlled blasting; 3. injecting high pressure water, and selecting part of blast holes I to perform cyclic water injection pressurizing; and 4, performing normal tunneling by the TBM.
    Type: Application
    Filed: June 23, 2017
    Publication date: January 11, 2018
    Inventors: Weijiang CHU, Chunsheng ZHANG, Jing HOU, Yong ZHOU, Pingzhi CHEN