Patents by Inventor Wenfeng TU

Wenfeng TU has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11919884
    Abstract: A method for preparing voriconazole L-camphorsulphonate and voriconazole. The method for preparing voriconazole L-camphorsulphonate comprises: method 1: dissolving (2R,3S)/(2S,3R) isomer mixture and L-camphor sulphonic acid in water and acetone, and performing crystallisation filtration to obtain voriconazole L-camphorsulphonate; method 2: (a) dissolving a mixture of isomer mixture and L-camphor sulphonic acid in a first solvent and then performing crystallisation filtration; or (a?) dissolving L-camphorsulphonate of the isomer mixture in a first solvent and then performing crystallisation filtration; (b) concentrating the filtrate obtained in step (a) or (a?) into a solid; and (c) dissolving the solid obtained in step (b) in a second solvent and performing crystallisation filtration to obtain voriconazole L-camphorsulphonate. Adjusting the resolution solvent effectively reduces production costs and facilitates recycling of the resolution solvent.
    Type: Grant
    Filed: November 10, 2016
    Date of Patent: March 5, 2024
    Assignee: Zhejiang Huahai Pharmaceutical Co., Ltd.
    Inventors: Hu Huang, Wenfeng Huang, Guoliang Tu, Zhongming Xu, Qianghui Wu, Zhaoyang Meng, Yuling Fang
  • Publication number: 20220284152
    Abstract: A peridynamics method and system for tunnel rock mass failure water inrush catastrophe simulation. A calculation model is discretized into material points, and a virtual boundary layers is set on an outer side of a boundary of the calculation model as an object to which boundary conditions are applied; a size of a horizon of the material points is selected to form a neighborhood matrix; a crustal stress is made equivalent to a stress boundary condition of the calculation model, a karst cave water pressure is made equivalent to a normal pressure, and a displacement constraint and tunnel support are converted into a displacement boundary condition; a speed and a displacement of the material point are solved, and local damage situations are recorded; and a tunnel construction process is simulated by material point dormancy after initial balance calculation is stable.
    Type: Application
    Filed: October 22, 2020
    Publication date: September 8, 2022
    Applicant: SHANDONG UNIVERSITY
    Inventors: Shucai LI, Liping LI, Zongqing ZHOU, Chenglu GAO, Shaoshuai SHI, Shuai CHENG, Zhuohui LI, Daosheng ZHANG, Wenfeng TU, Meixia WANG
  • Patent number: 10768083
    Abstract: A test device and a test method of fractured rock mass collapse and blockfall and fracture water inrush includes a fractured rock mass preparation device, a water source loading device, a surrounding rock pressurization device and a slide rail, wherein the fractured rock mass preparation device is fixed at one end of the slide rail, and the water source loading device is fixed on the other side of the slide rail. An opening is formed in the rock mass water storage structure, and the size of the opening is adapted to the size of the fractured rock mass; the surrounding rock pressurization device includes one bracket and a pressurization structure arranged below the bracket, and a space for accommodating the fractured rock mass is reserved below the pressurization structure; and the bottom support and the bracket are both movably installed on the slide rail.
    Type: Grant
    Filed: September 13, 2017
    Date of Patent: September 8, 2020
    Assignee: SHANDONG UNIVERSITY
    Inventors: Shucai Li, Liping Li, Shaoshuai Shi, Zongqing Zhou, Hongliang Liu, Jie Hu, Shangqu Sun, Jing Wang, Wenfeng Tu, Zhijie Wen
  • Publication number: 20190285525
    Abstract: A test device and a test method of fractured rock mass collapse and blockfall and fracture water inrush includes a fractured rock mass preparation device, a water source loading device, a surrounding rock pressurization device and a slide rail, wherein the fractured rock mass preparation device is fixed at one end of the slide rail, and the water source loading device is fixed on the other side of the slide rail. An opening is formed in the rock mass water storage structure, and the size of the opening is adapted to the size of the fractured rock mass; the surrounding rock pressurization device includes one bracket and a pressurization structure arranged below the bracket, and a space for accommodating the fractured rock mass is reserved below the pressurization structure; and the bottom support and the bracket are both movably installed on the slide rail.
    Type: Application
    Filed: September 13, 2017
    Publication date: September 19, 2019
    Applicant: SHANDONG UNIVERSITY
    Inventors: Shucai LI, Liping LI, Shaoshuai SHI, Zongqing ZHOU, Hongliang LIU, Jie HU, Shangqu SUN, Jing WANG, Wenfeng TU, Zhijie WEN