Patents by Inventor Wenkui GAO

Wenkui GAO has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 12252889
    Abstract: A construction method for a radiation-proof concrete hole reserved split bolt includes: 1) mounting a hole reserved sleeve; 2) mounting an inclined recoverable split bolt; 3) mounting an inclined split bolt; 4) fixing the inclined recoverable split bolt and an inclined split bolt main body; 5) pouring concrete, and dismantling related components; 6) plugging the inclined split bolt main body; and 7) plugging the hole reserved sleeve. According to the construction method, the hole reserved sleeve is obliquely arranged, the inner side of the hole reserved sleeve is sprayed with a radiation-proof coating with the functions of reducing radiation ray reflection and absorbing certain radiation rays, and in addition, after the construction of a pipeline or a line in the hole reserved sleeve is finished, the openings at both ends of the hole reserved sleeve are plugged with a radiation-proof mortar incorporated with a micro-expanding agent and a waterproof agent.
    Type: Grant
    Filed: June 21, 2022
    Date of Patent: March 18, 2025
    Assignees: China Railway The Third Engineering Group Construction and Installation Engineering Co., Ltd., The Third Engineering Group Co., Ltd. of China Railway
    Inventors: Zhiqiang Wang, Xiaofeng Wang, Huasong Yin, Wei Wu, Junyi Meng, Liangliang Lian, Xiuru Cheng, Zhipeng Yao, Wenkui Gao, Yuan Zhao, Ze Zhang, Le Ren, Yingbo Dong, Lin Li, Yajuan Zhang
  • Publication number: 20230020298
    Abstract: A construction method for a radiation-proof concrete hole reserved split bolt includes: 1) mounting a hole reserved sleeve; 2) mounting an inclined recoverable split bolt; 3) mounting an inclined split bolt; 4) fixing the inclined recoverable split bolt and an inclined split bolt main body; 5) pouring concrete, and dismantling related components; 6) plugging the inclined split bolt main body; and 7) plugging the hole reserved sleeve. According to the construction method, the hole reserved sleeve is obliquely arranged, the inner side of the hole reserved sleeve is sprayed with a radiation-proof coating with the functions of reducing radiation ray reflection and absorbing certain radiation rays, and in addition, after the construction of a pipeline or a line in the hole reserved sleeve is finished, the openings at both ends of the hole reserved sleeve are plugged with a radiation-proof mortar incorporated with a micro-expanding agent and a waterproof agent.
    Type: Application
    Filed: June 21, 2022
    Publication date: January 19, 2023
    Applicants: China Railway The Third Engineering Group Construction and Installation Engineering Co., Ltd., The Third Engineering Group Co., Ltd. of China Railway
    Inventors: Zhiqiang WANG, Xiaofeng WANG, Huasong YIN, Wei WU, Junyi MENG, Liangliang LIAN, Xiuru CHENG, Zhipeng YAO, Wenkui GAO, Yuan ZHAO, Ze ZHANG, Le REN, Yingbo DONG, Lin LI, Yajuan ZHANG