Patents by Inventor Xiangjun ZENG
Xiangjun ZENG has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).
-
Patent number: 12088082Abstract: An integrated circuit-based nano-relay, comprising: an integrated circuit system of the nano-relay constructed according to an integrated circuit module built from a combinational logic circuit. An integrated power data processing algorithm is called by means of the integrated circuit module to perform signal processing on an input power signal, and power service data is output, that is, an integrated circuit is mainly constructed by means of the combinational logic circuit, the protection logic of the nano-relay is achieved by means of a hardware circuit module, and a response speed of the relay is improved.Type: GrantFiled: March 11, 2022Date of Patent: September 10, 2024Assignee: Digital Grid Research Institute, China Southern Power GridInventors: Peng Li, Xiangjun Zeng, Wei Xi, Xiaobo Li, Hao Yao, Yang Yu, Tiantian Cai
-
Publication number: 20240178648Abstract: An integrated circuit-based nano-relay, comprising: an integrated circuit system of the nano-relay constructed according to an integrated circuit module built from a combinational logic circuit. An integrated power data processing algorithm is called by means of the integrated circuit module to perform signal processing on an input power signal, and power service data is output, that is, an integrated circuit is mainly constructed by means of the combinational logic circuit, the protection logic of the nano-relay is achieved by means of a hardware circuit module, and a response speed of the relay is improved.Type: ApplicationFiled: March 11, 2022Publication date: May 30, 2024Applicant: DIGITAL GRID RES. INST., CHINA SOUTHERN PWR. GRIDInventors: Peng LI, Xiangjun ZENG, Wei XI, Xiaobo LI, Hao YAO, Yang YU, Tiantian CAI
-
Publication number: 20240006891Abstract: Provided is a two-stage self-organizing optimized aggregation method and system for distributed resources of a virtual power plant.Type: ApplicationFiled: June 28, 2023Publication date: January 4, 2024Inventors: Dongqi LIU, Xiangjun ZENG, Yongpeng SHEN, Yong XU, Hao YAO, Kai DING, Wei DENG
-
Publication number: 20230280386Abstract: A method and a system for locating a fault of a complex power line are provided. Several monitoring points on the complex power line can be obtained by providing several traveling wave head monitoring sensors on the complex power line. The complex power line is transformed into coordinates in conjunction with an arrival moment and a location corresponding to the monitoring points, thereby establishing a trunk line fault-locating equation related to a line location, the arrival moment, and a traveling wave propagation speed, from which a first fault point can thus be derived simply and quickly. If a fault point is located on a branch line, a branch line fault-locating equation is then established to derive a second fault point. Furthermore, the first fault point and the second fault point serve as a basis for deriving a target fault point of the complex power line.Type: ApplicationFiled: March 1, 2023Publication date: September 7, 2023Applicant: Electric Power Research Institute of Yunnan Power Grid Co., LtdInventors: Hongwen Liu, Xiangjun Zeng, Jindong Yang, Hao Bai, Ding Nie, Jisheng Huang, Lijun Tang, Guochao Qian, Dexu Zou, Xincui Tian
-
Patent number: 11368017Abstract: The present invention discloses a safe operation method for voltage reduction arc suppression of a ground fault phase of a non-effective ground system, for use in ground fault safety operation of a neutral point non-effective ground generator or distribution network. When a single-phase ground fault occurs, an external voltage source is applied at a non-effective ground system side between a bus and the ground, or between a line and the ground, or between a neutral point and the ground, or between a shunting tap of a non-effective ground system side winding of a transformer and the ground, to reduce the fault phase voltage to be lower than the continuous burning voltage of a ground arc, thereby meeting the requirements of long-term non-stop safe operation. The operation means and control method effectively prevent power outages, and improve the reliability and security of power supply.Type: GrantFiled: July 4, 2018Date of Patent: June 21, 2022Assignee: CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGYInventor: Xiangjun Zeng
-
Patent number: 11098585Abstract: A hydraulic end die of a tunnel secondary lining trolley, comprises a trolley side die-end die assembly (6) and a trolley top die-end die assembly (10). The trolley side die-end die assembly is fixed at an outer ring of a trolley side die assembly (2) by means of a trolley side die-end die fixing device (3); the trolley top die-end die assembly is fixed at an outer ring of a trolley top die assembly (11) by means of a trolley top die-end die fixing device (8); and the trolley side die-end die assembly and the trolley top die-end die assembly are connected to a hydraulic control system by means of a trolley side die-end die hydraulic telescopic device (4) and a trolley top die-end die hydraulic telescopic device (9) respectively. Further disclosed is a construction method for a hydraulic end die of a tunnel secondary lining trolley.Type: GrantFiled: March 21, 2019Date of Patent: August 24, 2021Assignees: NO. 3 ENGINEERING COMPANY OF CHINA RAILWAY NO 8 ENGINEERING GROUP CO., LTD., CHINA RAILWAY NO. 8 ENGINEERING GROUP CO., LTD.Inventors: Jianlin Mu, Luwei Feng, Bochuan Zeng, Jian Hu, Lianfang Li, Deli Feng, Yong Lan, Zifa Zhou, Hongbo Song, Xiangjun Zeng, Shangbang Wang
-
Patent number: 11001604Abstract: A method for preparing tulathromycin, and two intermediate compounds shown in formula V and formula VI are provided.Type: GrantFiled: February 5, 2018Date of Patent: May 11, 2021Assignee: WISDOM PHARMACEUTICAL CO., LTD.Inventors: Ping Zou, LingLing Chu, Xiaolong Qiu, Lin Hu, ChengLiang Zhang, XiangJun Zeng, ShaoHua Gou, ZhongPing Wu, Wei Shen, Jian Fu, Ming Xu, Ping Wang, XinGang Zhang, GuangHao Shi, JunQiang Wang, Jun Chen, Lei Cao
-
Publication number: 20210126450Abstract: The present invention discloses a safe operation method for voltage reduction arc suppression of a ground fault phase of a non-effective ground system, for use in ground fault safety operation of a neutral point non-effective ground generator or distribution network. When a single-phase ground fault occurs, an external voltage source is applied at a non-effective ground system side between a bus and the ground, or between a line and the ground, or between a neutral point and the ground, or between a shunting tap of a non-effective ground system side winding of a transformer and the ground, to reduce the fault phase voltage to be lower than the continuous burning voltage of a ground arc, thereby meeting the requirements of long-term non-stop safe operation. The operation means and control method effectively prevent power outages, and improve the reliability and security of power supply.Type: ApplicationFiled: July 4, 2018Publication date: April 29, 2021Applicant: CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGYInventor: Xiangjun ZENG
-
Publication number: 20210108515Abstract: A hydraulic end die of a tunnel secondary lining trolley, comprises a trolley side die-end die assembly (6) and a trolley top die-end die assembly (10). The trolley side die-end die assembly is fixed at an outer ring of a trolley side die assembly (2) by means of a trolley side die-end die fixing device (3); the trolley top die-end die assembly is fixed at an outer ring of a trolley top die assembly (11) by means of a trolley top die-end die fixing device (8); and the trolley side die-end die assembly and the trolley top die-end die assembly are connected to a hydraulic control system by means of a trolley side die-end die hydraulic telescopic device (4) and a trolley top die-end die hydraulic telescopic device (9) respectively. Further disclosed is a construction method for a hydraulic end die of a tunnel secondary lining trolley.Type: ApplicationFiled: March 21, 2019Publication date: April 15, 2021Inventors: Jianlin MU, Luwei FENG, Bochuan ZENG, Jian HU, Lianfang LI, Deli FENG, Yong LAN, Zifa ZHOU, Hongbo SONG, Xiangjun ZENG, Shangbang WANG
-
Patent number: 10892616Abstract: The proposed invention discloses a safe processing method for active voltage reduction of a ground fault phase of a non-effective ground system, for use in safe processing of a ground fault of a neutral point non-effective ground generator or distribution network. Non-effective ground system side windings of a transformer are equipped with a plurality of shunting taps. When a single-phase ground fault occurs, the shunting tap of the fault phase winding is selected to be short-circuited to ground directly or through an impedance to reduce the fault phase voltage to ensure that the fault point voltage is less than the continuous burning voltage of a ground arc to meet a long-term non-stop safe operation requirements. The proposed method can eliminate the instantaneous single-phase ground fault, suppress the permanent single-phase ground fault current, and limit the rising amplitude of non-fault phase voltage and the risk of non-fault phase insulation breakdown.Type: GrantFiled: July 4, 2018Date of Patent: January 12, 2021Assignee: CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGYInventor: Xiangjun Zeng
-
Publication number: 20200354396Abstract: A method for preparing tulathromycin, and two intermediate compounds shown in formula V and formula VI are provided.Type: ApplicationFiled: February 5, 2018Publication date: November 12, 2020Applicant: WISDOM PHARMACEUTICAL CO., LTDInventors: Ping ZOU, LingLing CHU, XiaoLong QIU, Lin HU, ChengLiang ZHANG, XiangJun ZENG, ShaoHua GOU, ZhongPing WU, Wei SHEN, Jian FU, Ming XU, Ping WANG, XinGang ZHANG, GuangHao SHI, JunQiang WANG, Jun CHEN, Lei CAO
-
Publication number: 20200083702Abstract: The proposed invention discloses a safe processing method for active voltage reduction of a ground fault phase of a non-effective ground system, for use in safe processing of a ground fault of a neutral point non-effective ground generator or distribution network. Non-effective ground system side windings of a transformer are equipped with a plurality of shunting taps. When a single-phase ground fault occurs, the shunting tap of the fault phase winding is selected to be short-circuited to ground directly or through an impedance to reduce the fault phase voltage to ensure that the fault point voltage is less than the continuous burning voltage of a ground arc to meet a long-term non-stop safe operation requirements. The proposed method can eliminate the instantaneous single-phase ground fault, suppress the permanent single-phase ground fault current, and limit the rising amplitude of non-fault phase voltage and the risk of non-fault phase insulation breakdown.Type: ApplicationFiled: July 4, 2018Publication date: March 12, 2020Applicant: CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGYInventor: Xiangjun ZENG