Patents by Inventor Xiaofei Qian

Xiaofei Qian has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 10401840
    Abstract: A method and a system for scheduling parallel machines based on hybrid shuffled frog leaping algorithm and variable neighborhood search algorithm are provided to solve collaborative production and processing of jobs on a plurality of unrelated batch processing machines. The jobs are distributed to machines based on the normal processing time and deterioration situation of the jobs on different machines and are arranged. An effective multi-machine heuristic rule is designed according to the structural properties of an optimal solution for the single-machine problem, and the improved rule is applied to the improved shuffled frog leaping algorithm to solve this problem. The improvement strategy for the traditional shuffled frog leaping algorithm is to improve the local search procedure of the traditional frog leaping algorithm by introducing the variable neighborhood search algorithm. The convergence rate and optimization capacity of the original algorithm are thus improved.
    Type: Grant
    Filed: April 20, 2018
    Date of Patent: September 3, 2019
    Assignee: Hefei University of Technology
    Inventors: Xinbao Liu, Jun Pei, Min Kong, Shaojun Lu, Xiaofei Qian, Zhiping Zhou
  • Publication number: 20190080270
    Abstract: The present invention disclose a parallel machine batch scheduling method and system based on an improved artificial bee colony algorithm in a deterioration situation. With this method, a near-optimal solution for the parallel machine batch scheduling problem with deteriorating jobs and maintenance consideration can be obtained. The model of the present invention is derived from an actual production process with considerations of machine maintenance and batching as well as additional processing and maintenance time for jobs and machines over time in actual production. According to the present invention, the settlement of this problem is conducive to providing reliable decision support for the production and maintenance of an enterprise in complex real production conditions, thus reducing enterprise operation costs, increasing enterprise productivity, and promoting building of a modern smart factory of the enterprise.
    Type: Application
    Filed: September 10, 2018
    Publication date: March 14, 2019
    Inventors: Xinbao Liu, Jun Pei, Shaojun Lu, Min Kong, Xiaofei Qian, Zhiping Zhou
  • Publication number: 20180356803
    Abstract: A method and system for batch scheduling uniform parallel machines with different capacities based on an improved genetic algorithm are provided. The method is to solve the batch scheduling problem of uniform parallel machines with different capacities. Jobs are distributed to machines by an improved genetic algorithm, and a corresponding batching strategy and a batch scheduling strategy are proposed according to the natural of the problem to obtain a fitness value of a corresponding individual; then, the quality of the solution is improved by a local search strategy; and, a crossover operation is performed on a population based on the fitness of the solution, and the population is continuously updated by repetitive iteration to eventually obtain an optimal solution.
    Type: Application
    Filed: June 12, 2018
    Publication date: December 13, 2018
    Inventors: Xinbao LIU, Jun PEI, Lu JIANG, Shaojun LU, Min KONG, Xiaofei QIAN, Zhiping ZHOU, Mei XUE
  • Publication number: 20180356802
    Abstract: A method and a system for scheduling parallel machines based on hybrid shuffled frog leaping algorithm and variable neighborhood search algorithm are provided to solve collaborative production and processing of jobs on a plurality of unrelated batch processing machines. The jobs are distributed to machines based on the normal processing time and deterioration situation of the jobs on different machines and are arranged. An effective multi-machine heuristic rule is designed according to the structural properties of an optimal solution for the single-machine problem, and the improved rule is applied to the improved shuffled frog leaping algorithm to solve this problem. The improvement strategy for the traditional shuffled frog leaping algorithm is to improve the local search procedure of the traditional frog leaping algorithm by introducing the variable neighborhood search algorithm. The convergence rate and optimization capacity of the original algorithm are thus improved.
    Type: Application
    Filed: April 20, 2018
    Publication date: December 13, 2018
    Inventors: Xinbao Liu, Jun Pei, Min Kong, Shaojun Lu, Xiaofei Qian, Zhiping Zhou
  • Publication number: 20180357610
    Abstract: A method and system for collaborative scheduling of production and transportation based on shuffled frog leaping and path relinking algorithms. The method includes the following steps: 1. setting algorithm parameters; 2. generating an initial population; 3. calculating fitness values; 4. grouping the population; 5. performing local search on all groups and updating individuals in groups; 6. performing global search on all groups and updating individuals in groups; 7. gathering all groups to obtain a new population; 8. performing a greedy path relinking algorithm on elegant solutions in the population to obtain an updated population; and, 9. determining termination conditions of algorithms; if so, ending; or otherwise, returning to the step 3.
    Type: Application
    Filed: June 12, 2018
    Publication date: December 13, 2018
    Inventors: Xinbao LIU, Jun PEI, Min KONG, Zhanhui WEI, Shaojun LU, Qingru SONG, Xiaofei QIAN