Patents by Inventor Xuanshan ZHANG

Xuanshan ZHANG has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 11306588
    Abstract: A method of treating tunnel collapse includes leveling a collapse body and moving a pavilion support under the collapse cavity, lifting a shield plate until a lower edge of the shield plate surpasses a contour line of an initial supporting arch of a tunnel, connecting a bottom column and inserting a padding plate under a column. If the hydraulic prop retracts, the column, the bottom column, the padding plate and the hydraulic prop bear a load from the shield plate. Mounting and connecting the initial supporting arch, welding the intersection point of the column and the initial supporting arch, cutting off the column in the initial supporting arch. Transferring the load of the shield plate from the pavilion support to an initial supporting shed, spraying fast-setting concrete to a grid arch to form a closed shell, and pumping filling material to fill the space of the collapse cavity.
    Type: Grant
    Filed: July 20, 2020
    Date of Patent: April 19, 2022
    Assignees: SHANDONG UNIVERSITY OF SCIENCE AND TECHNOLOGY, CHINA COMMUNICATIONS CONSTRUCTION CO., LTD., QINGDAO WEST COAST RAIL TRANSIT CO., LTD., QINGDAO FIRST MUNICIPAL ENGINEERING CO., LTD, HEBEI FEIPU ENVIRONMENTAL PROTECTION TECHNOLOGY CO., LTD
    Inventors: Xianghui Meng, Shibin Jiang, Weizhou Li, Hailiang Wang, Fu Yu, Wensheng He, Quanwei Liu, Chuan Li, Zhenbiao Wang, Lin Xin, Biao Kong, Xiangbao Meng, Yong Zhang, Wenming Zhang, Lide Hou, Jiufang Xiong, Xuanshan Zhang
  • Publication number: 20210388724
    Abstract: A method of treating tunnel collapse includes leveling a collapse body and moving a pavilion support under the collapse cavity, lifting a shield plate until a lower edge of the shield plate surpasses a contour line of an initial supporting arch of a tunnel, connecting a bottom column and inserting a padding plate under a column. If the hydraulic prop retracts, the column, the bottom column, the padding plate and the hydraulic prop bear a load from the shield plate. Mounting and connecting the initial supporting arch, welding the intersection point of the column and the initial supporting arch, cutting off the column in the initial supporting arch. Transferring the load of the shield plate from the pavilion support to an initial supporting shed, spraying fast-setting concrete to a grid arch to form a closed shell, and pumping filling material to fill the space of the collapse cavity.
    Type: Application
    Filed: July 20, 2020
    Publication date: December 16, 2021
    Inventors: Xianghui MENG, Shibin JIANG, Weizhou LI, Hailiang WANG, Fu YU, Wensheng HE, Quanwei LIU, Chuan LI, Zhenbiao WANG, Lin XIN, Biao KONG, Xiangbao MENG, Yong ZHANG, Wenming ZHANG, Lide HOU, Jiufang XIONG, Xuanshan ZHANG