Patents by Inventor Xue Bin Min

Xue Bin Min has filed for patents to protect the following inventions. This listing includes patent applications that are pending as well as patents that have already been granted by the United States Patent and Trademark Office (USPTO).

  • Patent number: 9983907
    Abstract: A method, computer program product, and computer system for backfilling jobs based on energy aware scheduling are provided. A first job is received at a scheduler, where the scheduler manages one or more running jobs based on a plurality of system resources. The plurality of system resources comprises at least one resource constraint. A resource consumption of the first job is estimated based on one or more resource requirements of the first job. A first resource requirement of the one or more resource requirements is determined to exceed the resource constraint. In response to determining that the first resource requirement of the first job exceeds at least one resource constraint, at least one of (i) the first resource requirement of the first job and (ii) the plurality of system resources is modified. The first job is scheduled.
    Type: Grant
    Filed: October 27, 2015
    Date of Patent: May 29, 2018
    Assignee: International Business Machines Corporation
    Inventors: Ji Li, Xiu Qiao Li, Zhenchao Liu, Xian Tao Meng, Xue Bin Min, Sam Sanjabi
  • Publication number: 20170116037
    Abstract: A method, computer program product, and computer system for backfilling jobs based on energy aware scheduling are provided. A first job is received at a scheduler, where the scheduler manages one or more running jobs based on a plurality of system resources. The plurality of system resources comprises at least one resource constraint. A resource consumption of the first job is estimated based on one or more resource requirements of the first job. A first resource requirement of the one or more resource requirements is determined to exceed the resource constraint. In response to determining that the first resource requirement of the first job exceeds at least one resource constraint, at least one of (i) the first resource requirement of the first job and (ii) the plurality of system resources is modified. The first job is scheduled.
    Type: Application
    Filed: October 27, 2015
    Publication date: April 27, 2017
    Inventors: Ji Li, Xiu Qiao Li, Zhenchao Liu, Xian Tao Meng, Xue Bin Min, Sam Sanjabi