    Abstract: A method for hoisting and transporting assemblies in an underground nuclear power plant, the method including: 1) pouring concrete onto a reactor cavern to form a rock anchor beam; hoisting a circular bridge crane to the reactor cavern through a hoist shaft on a top of the reactor cavern; mounting the circular bridge crane on the rock anchor beam by using a truck crane; 2) installing a containment cylinder and a track beam of a polar crane in the reactor cavern using the circular bridge crane; hoisting a gantry crane on one end of a polar crane girder and sending the polar crane girder to the reactor cavern; hoisting the other end of the polar crane girder using the circular bridge crane; allowing the polar crane girder to be horizontal; and mounting the polar crane girder on the track beam.
    Type: Grant
    Filed: December 12, 2016
    Date of Patent: January 28, 2020
    Assignee: CHANGJIANG SURVEY PLANNING DESIGN AND RESEARCH CO., LTD.
    Inventors: Xinqiang Niu, Qigui Yang, Feng Li, Lijun Su, Xuehong Yang, Xin Zhao, Xia Hua, Shudong Wang, Fuzhen Ding, Fei Yu, Yi Su, Guoqiang Zhang, Shiyu Xie, Tao Zhang
  • Patent number: 10392937
    Abstract: A construction layout for caverns of an underground nuclear power plant, including: two primary caverns accommodating nuclear reactor powerhouses, electric powerhouse caverns, safe powerhouse caverns, auxiliary powerhouse caverns, nuclear fuel powerhouse caverns, connecting powerhouse caverns, a first primary traffic tunnel, a third primary traffic tunnel, a second primary traffic tunnel, a fourth primary traffic tunnel, and a primary steam channel. The electric powerhouse caverns, the safe powerhouse caverns, and the nuclear fuel powerhouse caverns are arranged along the longitudinal direction of the mountain. Each of the safe powerhouse caverns and each of the nuclear fuel powerhouse caverns are disposed on two sides of each of the two primary caverns in the longitudinal direction of the mountain, respectively. Each of the electric powerhouse caverns and each of the safe powerhouse caverns are located on a same side of each the two primary caverns.
    Type: Grant
    Filed: December 13, 2016
    Date of Patent: August 27, 2019
    Assignee: CHANGJIANG SURVEY PLANNING DESIGN AND RESEARCH CO., LTD.
    Inventors: Xinqiang Niu, Qigui Yang, Baixing Liu, Lixin Liu, Xin Zhao, Lijun Su, Feng Li, Xuehong Yang, Feng Zhao, Xia Hua, Min Li, Weina Yu, Maohua Li, Fei Yu
  • Patent number: 10316662
    Abstract: A construction layout for underground caverns in a nuclear island powerhouse of an underground nuclear power plant, including: two primary caverns accomodating nuclear reactor powerhouses, combined caverns, electric powerhouse caverns, pressure relief caverns, a first primary traffic tunnel, a second primary traffic tunnel, a third primary traffic tunnel, a top adit system, a ground adit system, secondary traffic tunnels, and a side traffic tunnel. Each combined cavern and each electric powerhouse cavern are disposed at two sides of each primary cavern, respectively. Two combined caverns are in end-to-end connection and the arrangement direction of the two combined caverns are in parallel to the connecting line of the medial axes of the two primary caverns. Each pressure relief cavern is disposed between each combined cavern and a corresponding electric powerhouse cavern.
    Type: Grant
    Filed: December 12, 2016
    Date of Patent: June 11, 2019
    Assignee: CHANGJIANG SURVEY PLANNING DESIGN AND RESEARCH CO., LTD.
    Inventors: Qigui Yang, Xinqiang Niu, Lixin Liu, Baixing Liu, Xin Zhao, Lijun Su, Feng Li, Xuehong Yang, Zhijun Zhang, Zhengjian Miu, Zhiguo Zhang, Haibo Liu, Tieling Tao, Yanlei Wan
  • Patent number: 10094217
    Abstract: A construction layout for caverns of an underground nuclear power plant, including: two primary caverns accommodating nuclear reactor powerhouses, combined caverns, electric powerhouse caverns, pressure relief caverns, a first primary traffic tunnel, a second primary traffic tunnel, a third primary traffic tunnel, a top adit system, and a ground adit system. Each combined cavern is disposed on one side of each of the two primary caverns. Each electric powerhouse cavern and each pressure relief cavern are disposed on two sides of each of the two primary caverns perpendicular to the longitudinal direction of the mountain. Each electric powerhouse cavern is perpendicular to the longitudinal direction of the mountain. The first primary traffic tunnel and the third primary traffic tunnel are disposed along the longitudinal direction of the mountain on outer sides of the two combined caverns, respectively.
    Type: Grant
    Filed: December 12, 2016
    Date of Patent: October 9, 2018
    Assignee: CHANGJIANG SURVEY PLANNING DESIGN AND RESEARCH CO., LTD.
    Inventors: Qigui Yang, Xinqiang Niu, Lijun Su, Baixing Liu, Lixin Liu, Xin Zhao, Xuehong Yang, Feng Li, Xia Hua, Xuexian Zhu, Qianlong Han, Xiao Pan, Haibo Liu
  • Publication number: 20180003056
    Abstract: A construction layout for caverns of an underground nuclear power plant, including: two primary caverns accommodating nuclear reactor powerhouses, electric powerhouse caverns, safe powerhouse caverns, auxiliary powerhouse caverns, nuclear fuel powerhouse caverns, connecting powerhouse caverns, a first primary traffic tunnel, a third primary traffic tunnel, a second primary traffic tunnel, a fourth primary traffic tunnel, and a primary steam channel. The electric powerhouse caverns, the safe powerhouse caverns, and the nuclear fuel powerhouse caverns are arranged along the longitudinal direction of the mountain. Each of the safe powerhouse caverns and each of the nuclear fuel powerhouse caverns are disposed on two sides of each of the two primary caverns in the longitudinal direction of the mountain, respectively. Each of the electric powerhouse caverns and each of the safe powerhouse caverns are located on a same side of each the two primary caverns.
    Type: Application
    Filed: December 13, 2016
    Publication date: January 4, 2018
    Inventors: Xinqiang NIU, Qigui YANG, Baixing LIU, Lixin LIU, Xin ZHAO, Lijun SU, Feng LI, Xuehong YANG, Feng ZHAO, Xia HUA, Min LI, Weina YU, Maohua LI, Fei YU
  • Publication number: 20180002144
    Abstract: A method for hoisting and transporting assemblies in an underground nuclear power plant, the method including: 1) pouring concrete onto a reactor cavern to form a rock anchor beam; hoisting a circular bridge crane to the reactor cavern through a hoist shaft on a top of the reactor cavern; mounting the circular bridge crane on the rock anchor beam by using a truck crane; 2) installing a containment cylinder and a track beam of a polar crane in the reactor cavern using the circular bridge crane; hoisting a gantry crane on one end of a polar crane girder and sending the polar crane girder to the reactor cavern; hoisting the other end of the polar crane girder using the circular bridge crane; allowing the polar crane girder to be horizontal; and mounting the polar crane girder on the track beam.
    Type: Application
    Filed: December 12, 2016
    Publication date: January 4, 2018
    Inventors: Xinqiang NIU, Qigui YANG, Feng LI, Lijun SU, Xuehong YANG, Xin ZHAO, Xia HUA, Shudong WANG, Fuzhen DING, Fei YU, Yi SU, Guoqiang ZHANG, Shiyu XIE, Tao ZHANG
  • Publication number: 20180003055
    Abstract: A construction layout for caverns of an underground nuclear power plant, including: two primary caverns accommodating nuclear reactor powerhouses, combined caverns, electric powerhouse caverns, pressure relief caverns, a first primary traffic tunnel, a second primary traffic tunnel, a third primary traffic tunnel, a top adit system, and a ground adit system. Each combined cavern is disposed on one side of each of the two primary caverns. Each electric powerhouse cavern and each pressure relief cavern are disposed on two sides of each of the two primary caverns perpendicular to the longitudinal direction of the mountain. Each electric powerhouse cavern is perpendicular to the longitudinal direction of the mountain. The first primary traffic tunnel and the third primary traffic tunnel are disposed along the longitudinal direction of the mountain on outer sides of the two combined caverns, respectively.
    Type: Application
    Filed: December 12, 2016
    Publication date: January 4, 2018
    Inventors: Qigui YANG, Xinqiang NIU, Lijun SU, Baixing LIU, Lixin LIU, Xin ZHAO, Xuehong YANG, Feng LI, Xia HUA, Xuexian ZHU, Qianlong HAN, Xiao PAN, Haibo LIU
  • Publication number: 20180003054
    Abstract: A construction layout for underground caverns in a nuclear island powerhouse of an underground nuclear power plant, including: two primary caverns accomodating nuclear reactor powerhouses, combined caverns, electric powerhouse caverns, pressure relief caverns, a first primary traffic tunnel, a second primary traffic tunnel, a third primary traffic tunnel, a top adit system, a ground adit system, secondary traffic tunnels, and a side traffic tunnel. Each combined cavern and each electric powerhouse cavern are disposed at two sides of each primary cavern, respectively. Two combined caverns are in end-to-end connection and the arrangement direction of the two combined caverns are in parallel to the connecting line of the medial axes of the two primary caverns. Each pressure relief cavern is disposed between each combined cavern and a corresponding electric powerhouse cavern.
    Type: Application
    Filed: December 12, 2016
    Publication date: January 4, 2018